Interstellar Minds

‹ Interstellar Minds

Update Site (from NASA)

Explore NASA’s Image and Video Library.

Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.

Sign in to suggest a Marvel.

Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.

NASA image records

CLPS PM-1 Astrobotic/ULA Rollout for Launch

KSC · 2024-01-05 · KSC-20240105-PH-JBS01_0024

CLPS PM-1 Astrobotic/ULA Rollout for Launch

On Friday, Jan. 5, 2024, United Launch Alliance’s Vulcan rocket carrying Astrobotic’s Peregrine lunar lander is rolled out of the Vertical Integration Facility to the launch pad at…

Inspect NASA record

On Friday, Jan. 5, 2024, United Launch Alliance’s Vulcan rocket carrying Astrobotic’s Peregrine lunar lander is rolled out of the Vertical Integration Facility to the launch pad at Space Launch Complex 41 on Cape Canaveral Space Force Station in Florida in advance of a planned lift off at 2:18 a.m. EST Monday, Jan. 8, 2024. Astrobotic’s Peregrine Mission One will carry NASA and commercial payloads to the Moon to study the lunar exosphere, thermal properties, and hydrogen abundance of the lunar regolith, magnetic fields, and the radiation environment of the lunar surface.

Record ID
KSC-20240105-PH-JBS01_0024
NASA center
KSC
Date
2024-01-05
Credit
NASA/Ben Smegelsky
Keywords
Artemis, Astrobotic, CLPS, PM-1, Peregrine Mission 1, ULA, United Launch Alliance, Vulcan
KSC-98pc101

KSC · 1998-01-05 · KSC-98pc101

KSC-98pc101

NASA’s Lunar Prospector is readied for launch as its gantry-like service tower is rolled back at Cape Canaveral Air Station’s Launch Complex 46. Lunar Prospector, built for the…

Inspect NASA record

NASA’s Lunar Prospector is readied for launch as its gantry-like service tower is rolled back at Cape Canaveral Air Station’s Launch Complex 46. Lunar Prospector, built for the NASA Ames Research Center by Lockheed Martin, is a spin-stabilized spacecraft designed to provide NASA with the first global maps of the Moon’s surface and its gravitational magnetic fields, as well as look for the possible presence of ice near the lunar poles. It will orbit the Moon at an altitude of approximately 63 miles during a one-year mission. The launch of Lunar Prospector is scheduled for Jan. 5, 1998 at 8:31 p.m. EST

Record ID
KSC-98pc101
NASA center
KSC
Date
1998-01-05
CLPS PM-1 Astrobotic/ULA Rollout for Launch

KSC · 2024-01-05 · KSC-20240105-PH-CSH01_0034

CLPS PM-1 Astrobotic/ULA Rollout for Launch

On Friday, Jan. 5, 2024, United Launch Alliance’s Vulcan rocket carrying Astrobotic’s Peregrine lunar lander is rolled out of the Vertical Integration Facility to the launch pad at…

Inspect NASA record

On Friday, Jan. 5, 2024, United Launch Alliance’s Vulcan rocket carrying Astrobotic’s Peregrine lunar lander is rolled out of the Vertical Integration Facility to the launch pad at Space Launch Complex 41 on Cape Canaveral Space Force Station in Florida in advance of a planned lift off at 2:18 a.m. EST Monday, Jan. 8, 2024. Astrobotic’s Peregrine Mission One will carry NASA and commercial payloads to the Moon to study the lunar exosphere, thermal properties, and hydrogen abundance of the lunar regolith, magnetic fields, and the radiation environment of the lunar surface.(Multiple values)

Record ID
KSC-20240105-PH-CSH01_0034
NASA center
KSC
Date
2024-01-05
Credit
NASA/Cory S Huston
Keywords
Artemis, Astrobotic, CLPS, PM-1, Peregrine Mission 1, ULA, United Launch Alliance, Vulcan
Astronauts Evans and Cernan aboard the Apollo 17 spacecraft

JSC · 1972-12-17 · as17-162-24053

Astronauts Evans and Cernan aboard the Apollo 17 spacecraft

AS17-162-24053 (7-19 Dec. 1972) --- Scientist-astronaut Harrison H. "Jack" Schmitt, lunar module pilot, took this photograph of his two fellow crew men under zero-gravity conditions aboard the Apollo…

Inspect NASA record

AS17-162-24053 (7-19 Dec. 1972) --- Scientist-astronaut Harrison H. "Jack" Schmitt, lunar module pilot, took this photograph of his two fellow crew men under zero-gravity conditions aboard the Apollo 17 spacecraft during the final lunar landing mission in NASA's Apollo program. That is astronaut Eugene A. Cernan, commander, who is seemingly "right side up." Astronaut Ronald E. Evans, command module pilot, appears to be "upside down." While astronauts Cernan and Schmitt descended in the Lunar Module (LM) "Challenger" to explore the Taurus-Littrow region of the moon, astronaut Evans remained with the Command and Service Modules (CSM) "America" in lunar orbit.

Record ID
as17-162-24053
NASA center
JSC
Date
1972-12-17
Keywords
APOLLO 17 FLIGHT, APOLLO PROJECT, ASTRONAUTS, SPACECRAFT CABINS, ZERO GRAVITY
NASA/SpaceX CLPS IM-1 Launch

KSC · 2024-02-15 · KSC-20240215-PH-KLS01_0127

NASA/SpaceX CLPS IM-1 Launch

A SpaceX Falcon 9 rocket carrying Intuitive Machines’ Nova-C lunar lander lifts off from Launch Pad 39A at NASA’s Kennedy Space Center in Florida at 1:05 a.m. EST on…

Inspect NASA record

A SpaceX Falcon 9 rocket carrying Intuitive Machines’ Nova-C lunar lander lifts off from Launch Pad 39A at NASA’s Kennedy Space Center in Florida at 1:05 a.m. EST on Thursday, Feb. 15, 2024. As part of NASA’s CLPS (Commercial Lunar Payload Services) initiative and Artemis campaign, Intuitive Machines’ first lunar mission will carry NASA science and commercial payloads to the Moon to study plume-surface interactions, space weather/lunar surface interactions, radio astronomy, precision landing technologies, and a communication and navigation node for future autonomous navigation technologies.

Record ID
KSC-20240215-PH-KLS01_0127
NASA center
KSC
Date
2024-02-15
Credit
NASA/Kim Shiflett
Keywords
Artemis, CLPS, Cape Canaveral, Commercial Lunar Payload Services, Florida, IM-1, Intuitive Machines, John. F. Kennedy Space Center, KSC, Kennedy Space Center, Launch Complex 39A, NASA
ksc-69pc-443

KSC · 1969-07-16 · ksc-69pc-443

ksc-69pc-443

KENNEDY SPACE CENTER, FLA. -- The Apollo 11 Saturn V space vehicle, at Launch Pad 39A, awaits the liftoff scheduled for 9:32 a.m. EDT today, along with astronauts…

Inspect NASA record

KENNEDY SPACE CENTER, FLA. -- The Apollo 11 Saturn V space vehicle, at Launch Pad 39A, awaits the liftoff scheduled for 9:32 a.m. EDT today, along with astronauts Neil A. Armstrong, Michael Collins and Edwin E. Aldrin Jr. During the planned eight-day mission, Armstrong and Aldrin will descend in a lunar module to the Moon's surface while Collins orbits overhead in the command module. The two astronauts are to spend 22 hours on the Moon, including two and one-half hours outside the lunar module. They will gather samples of lunar material and will deploy scientific experiments which will transmit data about the lunar environment. They will rejoin Collins the command module for the return trip to Earth

Record ID
ksc-69pc-443
NASA center
KSC
Date
1969-07-16
Astronaut Charles Duke works at front of Lunar Roving Vehicle

JSC · 1972-04-23 · as16-116-18607

Astronaut Charles Duke works at front of Lunar Roving Vehicle

AS16-116-18607 (23 April 1972) --- Astronaut Charles M. Duke Jr. works at the front of the Lunar Roving Vehicle (LRV) parked in this rock field at a North…

Inspect NASA record

AS16-116-18607 (23 April 1972) --- Astronaut Charles M. Duke Jr. works at the front of the Lunar Roving Vehicle (LRV) parked in this rock field at a North Ray Crater geological site during the mission's third extravehicular activity (EVA) on April 23, 1972. Astronaut John W. Young took this picture with a 70mm Hasselblad camera. While astronauts Young, commander; and Duke, lunar module pilot; descended in the Apollo 16 Lunar Module (LM) "Orion" to explore the Descartes highlands landing site on the moon, astronaut Thomas K. Mattingly II, command module pilot, remained with the Command and Service Modules (CSM) "Casper" in lunar orbit.

Record ID
as16-116-18607
NASA center
JSC
Date
1972-04-23
Keywords
APOLLO 16 FLIGHT, APOLLO PROJECT, ASTRONAUTS, CRATERS, LUNAR ROVING VEHICLES EXTRAVEHICULAR ACTIVITY, LUNAR SURFACE, LUNAR SURFACE VEHICLES
APOLLO 12 - LUNAR MODULE (LM)-6 - RELOCATION - KSC

JSC · 1969-06-23 · S69-39262

APOLLO 12 - LUNAR MODULE (LM)-6 - RELOCATION - KSC

S69-39262 (23 June 1969) --- Lunar Module (LM) 6, scheduled for the Apollo 12 lunar landing mission in November 1969, is being moved to an integration work stand…

Inspect NASA record

S69-39262 (23 June 1969) --- Lunar Module (LM) 6, scheduled for the Apollo 12 lunar landing mission in November 1969, is being moved to an integration work stand in the Kennedy Space Center's (KSC) Manned Spacecraft Operations Building. The two prime crew members scheduled to use the LM-6 to descend to the lunar surface following separation from the Command and Service Modules (CSM) and to later return to the CSM are astronauts Charles Conrad Jr., commander, and Alan L. Bean, lunar module pilot. Astronaut Richard F. Gordon Jr. is the prime crew's command module pilot.

Record ID
S69-39262
NASA center
JSC
Date
1969-06-23
NASA/SpaceX CLPS IM-1 Launch

KSC · 2024-02-15 · KSC-20240215-PH-KLS01_0020

NASA/SpaceX CLPS IM-1 Launch

A SpaceX Falcon 9 rocket carrying Intuitive Machines’ Nova-C lunar lander lifts off from Launch Pad 39A at NASA’s Kennedy Space Center in Florida at 1:05 a.m. EST on…

Inspect NASA record

A SpaceX Falcon 9 rocket carrying Intuitive Machines’ Nova-C lunar lander lifts off from Launch Pad 39A at NASA’s Kennedy Space Center in Florida at 1:05 a.m. EST on Thursday, Feb. 15, 2024. As part of NASA’s CLPS (Commercial Lunar Payload Services) initiative and Artemis campaign, Intuitive Machines’ first lunar mission will carry NASA science and commercial payloads to the Moon to study plume-surface interactions, space weather/lunar surface interactions, radio astronomy, precision landing technologies, and a communication and navigation node for future autonomous navigation technologies.

Record ID
KSC-20240215-PH-KLS01_0020
NASA center
KSC
Date
2024-02-15
Credit
NASA/Kim Shiflett
Keywords
Artemis, CLPS, Cape Canaveral, Commercial Lunar Payload Services, Florida, IM-1, Intuitive Machines, John. F. Kennedy Space Center, KSC, Kennedy Space Center, Launch Complex 39A, NASA
CLPS PM-1 Astrobotic/ULA Rollout for Launch

KSC · 2024-01-05 · KSC-20240105-PH-CSH01_0061

CLPS PM-1 Astrobotic/ULA Rollout for Launch

On Friday, Jan. 5, 2024, United Launch Alliance’s Vulcan rocket carrying Astrobotic’s Peregrine lunar lander is rolled out of the Vertical Integration Facility to the launch pad at…

Inspect NASA record

On Friday, Jan. 5, 2024, United Launch Alliance’s Vulcan rocket carrying Astrobotic’s Peregrine lunar lander is rolled out of the Vertical Integration Facility to the launch pad at Space Launch Complex 41 on Cape Canaveral Space Force Station in Florida in advance of a planned lift off at 2:18 a.m. EST Monday, Jan. 8, 2024. Astrobotic’s Peregrine Mission One will carry NASA and commercial payloads to the Moon to study the lunar exosphere, thermal properties, and hydrogen abundance of the lunar regolith, magnetic fields, and the radiation environment of the lunar surface.(Multiple values)

Record ID
KSC-20240105-PH-CSH01_0061
NASA center
KSC
Date
2024-01-05
Credit
NASA/Cory S Huston
Keywords
Artemis, Astrobotic, CLPS, PM-1, Peregrine Mission 1, ULA, United Launch Alliance, Vulcan
CLPS PM-1 Astrobotic/ULA Rollout for Launch

KSC · 2024-01-05 · KSC-20240105-PH-CSH01_0011

CLPS PM-1 Astrobotic/ULA Rollout for Launch

On Friday, Jan. 5, 2024, United Launch Alliance’s Vulcan rocket carrying Astrobotic’s Peregrine lunar lander is rolled out of the Vertical Integration Facility to the launch pad at…

Inspect NASA record

On Friday, Jan. 5, 2024, United Launch Alliance’s Vulcan rocket carrying Astrobotic’s Peregrine lunar lander is rolled out of the Vertical Integration Facility to the launch pad at Space Launch Complex 41 on Cape Canaveral Space Force Station in Florida in advance of a planned lift off at 2:18 a.m. EST Monday, Jan. 8, 2024. Astrobotic’s Peregrine Mission One will carry NASA and commercial payloads to the Moon to study the lunar exosphere, thermal properties, and hydrogen abundance of the lunar regolith, magnetic fields, and the radiation environment of the lunar surface.(Multiple values)

Record ID
KSC-20240105-PH-CSH01_0011
NASA center
KSC
Date
2024-01-05
Credit
NASA/Cory S Huston
Keywords
Artemis, Astrobotic, CLPS, PM-1, Peregrine Mission 1, ULA, United Launch Alliance, Vulcan
CLPS PM-1 Astrobotic/ULA Rollout for Launch

KSC · 2024-01-05 · KSC-20240105-PH-JBS01_0067

CLPS PM-1 Astrobotic/ULA Rollout for Launch

On Friday, Jan. 5, 2024, United Launch Alliance’s Vulcan rocket carrying Astrobotic’s Peregrine lunar lander is rolled out of the Vertical Integration Facility to the launch pad at…

Inspect NASA record

On Friday, Jan. 5, 2024, United Launch Alliance’s Vulcan rocket carrying Astrobotic’s Peregrine lunar lander is rolled out of the Vertical Integration Facility to the launch pad at Space Launch Complex 41 on Cape Canaveral Space Force Station in Florida in advance of a planned lift off at 2:18 a.m. EST Monday, Jan. 8, 2024. Astrobotic’s Peregrine Mission One will carry NASA and commercial payloads to the Moon to study the lunar exosphere, thermal properties, and hydrogen abundance of the lunar regolith, magnetic fields, and the radiation environment of the lunar surface.

Record ID
KSC-20240105-PH-JBS01_0067
NASA center
KSC
Date
2024-01-05
Credit
NASA/Ben Smegelsky
Keywords
Artemis, Astrobotic, CLPS, PM-1, Peregrine Mission 1, ULA, United Launch Alliance, Vulcan