Interstellar Minds

‹ Interstellar Minds

Update Site (from NASA)

Explore NASA’s Image and Video Library.

Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.

Sign in to suggest a Marvel.

Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.

NASA image records

KSC-2009-1745

KSC · 2009-02-20 · KSC-2009-1745

KSC-2009-1745

CAPE CANAVERAL, Fla. – At the Astrotech payload processing facility near NASA's Kennedy Space Center in Florida, NASA's Lunar CRater Observation and Sensing Satellite, known as LCROSS, is…

Inspect NASA record

CAPE CANAVERAL, Fla. – At the Astrotech payload processing facility near NASA's Kennedy Space Center in Florida, NASA's Lunar CRater Observation and Sensing Satellite, known as LCROSS, is displayed after its shipping material has been removed. The satellite's primary mission is to search for water ice on the moon in a permanently shadowed crater near one of the lunar poles. LCROSS is a low-cost, accelerated-development, companion mission to NASA's Lunar Reconnaissance Orbiter, or LRO. At Kennedy, the two spacecraft will be integrated with an Atlas V launch vehicle and tested for final flight worthiness. LCROSS and LRO are the first missions in NASA's plan to return humans to the moon and begin establishing a lunar outpost by 2020. Launch is no earlier than April 24. Photo credit: NASA/Tim Jacobs

Record ID
KSC-2009-1745
NASA center
KSC
Date
2009-02-20
Keywords
moon mission, LRO, LCROSS,
PRIME-1 MSolo MLI Install

KSC · 2022-10-20 · KSC-20221020-PH-JBS01_0040

PRIME-1 MSolo MLI Install

Engineers install multilayer insulation (MLI) on the Mass Spectrometer Observing Lunar Operations (MSolo) instrument inside Kennedy Space Center’s Space Station Processing Facility on Oct. 20, 2022. The activity…

Inspect NASA record

Engineers install multilayer insulation (MLI) on the Mass Spectrometer Observing Lunar Operations (MSolo) instrument inside Kennedy Space Center’s Space Station Processing Facility on Oct. 20, 2022. The activity is in preparation for the Polar Resources Ice Mining Experiment-1 (PRIME-1) mission, which will be the first in-situ resource utilization demonstration on the Moon. MLI protects the instrument from thermal temperature extremes, helping to insulate at cold temperatures and to cool at higher temperatures when solar lighting conditions or lunar infrared reflects onto the instrument. Researchers and engineers are preparing MSolo instruments to launch on four robotic missions as part of NASA’s Commercial Lunar Payload Services – commercial deliveries beginning in 2023 that will perform science experiments, test technologies, and demonstrate capabilities to help NASA explore the Moon and prepare for crewed missions to the lunar surface.

Record ID
KSC-20221020-PH-JBS01_0040
NASA center
KSC
Date
2022-10-20
Credit
NASA/Ben Smegelsky
Keywords
CLPS, IM-2, MLI, Moon to Mars, Msolo, NASA Tech, PRIME-1
MSolo EMI Testing

KSC · 2022-02-14 · KSC-20220214-PH-KLS01_0039

MSolo EMI Testing

Electronics Engineer and Mass Spectrometer Observing Lunar Operations (MSolo) team member Nate Cain conducts electromagnetic interference (EMI) testing inside the EMI Laboratory at NASA’s Kennedy Space Center in…

Inspect NASA record

Electronics Engineer and Mass Spectrometer Observing Lunar Operations (MSolo) team member Nate Cain conducts electromagnetic interference (EMI) testing inside the EMI Laboratory at NASA’s Kennedy Space Center in Florida on Feb. 14, 2022. These tests will verify that MSolo can control the emissions it will produce during its missions and meets EMI susceptibility requirements as part of its preparation to operate in the lunar environment. The third MSolo to go through EMI testing, this is an engineering development unit representative of the flight unit manifested to fly to the Moon’s South Pole as a payload on the agency’s Volatiles Investigating Polar Exploration Rover (VIPER) in 2023. Researchers and engineers are preparing MSolo instruments to launch on four robotic missions as part of NASA’s Commercial Lunar Payload Services (CLPS) – the first of which is slated for later this year. MSolo will help analyze the chemical makeup of landing sites on the Moon, with the later missions also studying water on the lunar surface.

Record ID
KSC-20220214-PH-KLS01_0039
NASA center
KSC
Date
2022-02-14
Credit
NASA/Kim Shiflett
Keywords
CLPS, EMI, Electromagnetic interference testing, KSC, Kennedy Space Center, MSolo, Mass Spectrometer Observing Lunar Operations, Moon, NASA, VIPER, Volatiles Investigating Polar Exploration Rover, lunar
PRIME-1 MSolo MLI Install

KSC · 2022-10-20 · KSC-20221020-PH-JBS01_0037

PRIME-1 MSolo MLI Install

Engineers install multilayer insulation (MLI) on the Mass Spectrometer Observing Lunar Operations (MSolo) instrument inside Kennedy Space Center’s Space Station Processing Facility on Oct. 20, 2022. The activity…

Inspect NASA record

Engineers install multilayer insulation (MLI) on the Mass Spectrometer Observing Lunar Operations (MSolo) instrument inside Kennedy Space Center’s Space Station Processing Facility on Oct. 20, 2022. The activity is in preparation for the Polar Resources Ice Mining Experiment-1 (PRIME-1) mission, which will be the first in-situ resource utilization demonstration on the Moon. MLI protects the instrument from thermal temperature extremes, helping to insulate at cold temperatures and to cool at higher temperatures when solar lighting conditions or lunar infrared reflects onto the instrument. Researchers and engineers are preparing MSolo instruments to launch on four robotic missions as part of NASA’s Commercial Lunar Payload Services – commercial deliveries beginning in 2023 that will perform science experiments, test technologies, and demonstrate capabilities to help NASA explore the Moon and prepare for crewed missions to the lunar surface.

Record ID
KSC-20221020-PH-JBS01_0037
NASA center
KSC
Date
2022-10-20
Credit
NASA/Ben Smegelsky
Keywords
CLPS, IM-2, MLI, Moon to Mars, Msolo, NASA Tech, PRIME-1
MSolo Vibe Fixture Removal

KSC · 2022-08-04 · KSC-20220804-PH-JBS02_0062

MSolo Vibe Fixture Removal

Engineers at NASA’s Kennedy Space Center in Florida remove the vibration fixture on the Mass Spectrometer observing lunar operations (MSolo) instrument on Aug. 4, 2022. The activity followed…

Inspect NASA record

Engineers at NASA’s Kennedy Space Center in Florida remove the vibration fixture on the Mass Spectrometer observing lunar operations (MSolo) instrument on Aug. 4, 2022. The activity followed a vibration test in preparation for the Polar Resources Ice Mining Experiment-1 (PRIME-1) mission, which will be the first in-situ resource utilization demonstration on the Moon. MSolo is a commercial off-the-shelf mass spectrometer modified to work in space and will help analyze the chemical makeup of landing sites on the Moon, as well as study water on the lunar surface. Researchers and engineers are preparing MSolo instruments to launch on four robotic missions as part of NASA’s Commercial Lunar Payload Services – commercial deliveries beginning in 2023 that will perform science experiments, test technologies, and demonstrate capabilities to help NASA explore the Moon and prepare for crewed missions to the lunar surface.

Record ID
KSC-20220804-PH-JBS02_0062
NASA center
KSC
Date
2022-08-04
Credit
NASA/Ben Smegelsky
Keywords
CLPS, IM-2, Moon to Mars, Msolo, NASA Tech, PRIME-1
MSolo Vibe Test

KSC · 2022-08-03 · KSC-20220803-PH-KLS01_0007

MSolo Vibe Test

Engineers at NASA’s Kennedy Space Center prepare the Mass Spectrometer observing lunar operations (MSolo) instrument for vibration testing inside the Florida spaceport’s Cryogenics Laboratory on Aug. 3, 2022.…

Inspect NASA record

Engineers at NASA’s Kennedy Space Center prepare the Mass Spectrometer observing lunar operations (MSolo) instrument for vibration testing inside the Florida spaceport’s Cryogenics Laboratory on Aug. 3, 2022. MSolo is a commercial off-the-shelf mass spectrometer modified to work in space and will help analyze the chemical makeup of landing sites on the Moon, as well as study water on the lunar surface. Researchers and engineers are preparing MSolo instruments to launch on four robotic missions as part of NASA’s Commercial Lunar Payload Services (CLPS) – commercial deliveries that will perform science experiments, test technologies, and demonstrate capabilities to help NASA explore the Moon and prepare for crewed missions to the lunar surface. This particular MSolo instrument is slated to fly on the agency’s Polar Resources Ice Mining Experiment-1 (PRIME-1) mission – the first in-situ resource utilization demonstration on the Moon – as part of the agency’s CLPS initiative.

Record ID
KSC-20220803-PH-KLS01_0007
NASA center
KSC
Date
2022-08-03
Credit
NASA/Kim Shiflett
Keywords
CLPS, IM-2, Moon to Mars, Msolo, NASA Tech, PRIME-1
PRIME-1 MSolo MLI Install

KSC · 2022-10-19 · KSC-20221019-PH-JBS01_0094

PRIME-1 MSolo MLI Install

Engineers prepare the Mass Spectrometer Observing Lunar Operations (MSolo) instrument for the multilayer insulation installation inside Kennedy Space Center’s Space Station Processing Facility on Oct. 19, 2022. The…

Inspect NASA record

Engineers prepare the Mass Spectrometer Observing Lunar Operations (MSolo) instrument for the multilayer insulation installation inside Kennedy Space Center’s Space Station Processing Facility on Oct. 19, 2022. The activity is in preparation for the Polar Resources Ice Mining Experiment-1 (PRIME-1) mission, which will be the first in-situ resource utilization demonstration on the Moon. MSolo is a commercial off-the-shelf mass spectrometer modified to work in space and will help analyze the chemical makeup of landing sites on the Moon, as well as study water on the lunar surface. Researchers and engineers are preparing MSolo instruments to launch on four robotic missions as part of NASA’s Commercial Lunar Payload Services – commercial deliveries beginning in 2023 that will perform science experiments, test technologies, and demonstrate capabilities to help NASA explore the Moon and prepare for crewed missions to the lunar surface.

Record ID
KSC-20221019-PH-JBS01_0094
NASA center
KSC
Date
2022-10-19
Credit
NASA/Ben Smegelsky
Keywords
CLPS, IM-2, MLI, Moon to Mars, Msolo, NASA Tech, PRIME-1
PRIME-1 MSolo MLI Install

KSC · 2022-10-20 · KSC-20221020-PH-JBS01_0025

PRIME-1 MSolo MLI Install

Engineers install multilayer insulation (MLI) on the Mass Spectrometer Observing Lunar Operations (MSolo) instrument inside Kennedy Space Center’s Space Station Processing Facility on Oct. 20, 2022. The activity…

Inspect NASA record

Engineers install multilayer insulation (MLI) on the Mass Spectrometer Observing Lunar Operations (MSolo) instrument inside Kennedy Space Center’s Space Station Processing Facility on Oct. 20, 2022. The activity is in preparation for the Polar Resources Ice Mining Experiment-1 (PRIME-1) mission, which will be the first in-situ resource utilization demonstration on the Moon. MLI protects the instrument from thermal temperature extremes, helping to insulate at cold temperatures and to cool at higher temperatures when solar lighting conditions or lunar infrared reflects onto the instrument. Researchers and engineers are preparing MSolo instruments to launch on four robotic missions as part of NASA’s Commercial Lunar Payload Services – commercial deliveries beginning in 2023 that will perform science experiments, test technologies, and demonstrate capabilities to help NASA explore the Moon and prepare for crewed missions to the lunar surface.

Record ID
KSC-20221020-PH-JBS01_0025
NASA center
KSC
Date
2022-10-20
Credit
NASA/Ben Smegelsky
Keywords
CLPS, IM-2, MLI, Moon to Mars, Msolo, NASA Tech, PRIME-1
MSolo Vibe Fixture Removal

KSC · 2022-08-04 · KSC-20220804-PH-JBS02_0017

MSolo Vibe Fixture Removal

Engineers at NASA’s Kennedy Space Center in Florida remove the vibration fixture on the Mass Spectrometer observing lunar operations (MSolo) instrument on Aug. 4, 2022. The activity followed…

Inspect NASA record

Engineers at NASA’s Kennedy Space Center in Florida remove the vibration fixture on the Mass Spectrometer observing lunar operations (MSolo) instrument on Aug. 4, 2022. The activity followed a vibration test in preparation for the Polar Resources Ice Mining Experiment-1 (PRIME-1) mission, which will be the first in-situ resource utilization demonstration on the Moon. MSolo is a commercial off-the-shelf mass spectrometer modified to work in space and will help analyze the chemical makeup of landing sites on the Moon, as well as study water on the lunar surface. Researchers and engineers are preparing MSolo instruments to launch on four robotic missions as part of NASA’s Commercial Lunar Payload Services – commercial deliveries beginning in 2023 that will perform science experiments, test technologies, and demonstrate capabilities to help NASA explore the Moon and prepare for crewed missions to the lunar surface.

Record ID
KSC-20220804-PH-JBS02_0017
NASA center
KSC
Date
2022-08-04
Credit
NASA/Ben Smegelsky
Keywords
CLPS, IM-2, Moon to Mars, Msolo, NASA Tech, PRIME-1
KSC-2009-1751

KSC · 2009-02-19 · KSC-2009-1751

KSC-2009-1751

CAPE CANAVERAL, Fla. – NASA's Lunar CRater Observation and Sensing Satellite, known as LCROSS, arrives from Northrop Grumman's facility in Redondo Beach, Calif., at Astrotech near NASA's Kennedy…

Inspect NASA record

CAPE CANAVERAL, Fla. – NASA's Lunar CRater Observation and Sensing Satellite, known as LCROSS, arrives from Northrop Grumman's facility in Redondo Beach, Calif., at Astrotech near NASA's Kennedy Space Center in preparation for a spring launch. The satellite's primary mission is to search for water ice on the moon in a permanently shadowed crater near one of the lunar poles. LCROSS is a low-cost, accelerated-development, companion mission to NASA's Lunar Reconnaissance Orbiter, or LRO. At Kennedy, the two spacecraft will be integrated with an Atlas V launch vehicle and tested for final flight worthiness. LCROSS and LRO are the first missions in NASA's plan to return humans to the moon and begin establishing a lunar outpost by 2020. Photo credit: NASA/Kim Shiflett

Record ID
KSC-2009-1751
NASA center
KSC
Date
2009-02-19
Keywords
moon mission, LRO, LCROSS,
KSC-2009-1743

KSC · 2009-02-20 · KSC-2009-1743

KSC-2009-1743

CAPE CANAVERAL, Fla. – At the Astrotech payload processing facility near NASA's Kennedy Space Center in Florida, a crane gets ready to lift the shipping cage from around…

Inspect NASA record

CAPE CANAVERAL, Fla. – At the Astrotech payload processing facility near NASA's Kennedy Space Center in Florida, a crane gets ready to lift the shipping cage from around NASA's Lunar CRater Observation and Sensing Satellite, known as LCROSS. The satellite's primary mission is to search for water ice on the moon in a permanently shadowed crater near one of the lunar poles. LCROSS is a low-cost, accelerated-development, companion mission to NASA's Lunar Reconnaissance Orbiter, or LRO. At Kennedy, the two spacecraft will be integrated with an Atlas V launch vehicle and tested for final flight worthiness. LCROSS and LRO are the first missions in NASA's plan to return humans to the moon and begin establishing a lunar outpost by 2020. Launch is no earlier than April 24. Photo credit: NASA/Tim Jacobs

Record ID
KSC-2009-1743
NASA center
KSC
Date
2009-02-20
Keywords
moon mission, LRO, LCROSS,
MSolo EMI Testing

KSC · 2022-02-14 · KSC-20220214-PH-KLS01_0102

MSolo EMI Testing

Electronics Engineer and Mass Spectrometer Observing Lunar Operations (MSolo) team member Nate Cain conducts electromagnetic interference (EMI) testing inside the EMI Laboratory at NASA’s Kennedy Space Center in…

Inspect NASA record

Electronics Engineer and Mass Spectrometer Observing Lunar Operations (MSolo) team member Nate Cain conducts electromagnetic interference (EMI) testing inside the EMI Laboratory at NASA’s Kennedy Space Center in Florida on Feb. 14, 2022. The tests will verify that MSolo can control the emissions it will produce during its missions and meets EMI susceptibility requirements as part of its preparation to operate in the lunar environment. The third MSolo to go through EMI testing, this is an engineering development unit representative of the flight unit manifested to fly to the Moon’s South Pole as a payload on the agency’s Volatiles Investigating Polar Exploration Rover (VIPER) in 2023. Researchers and engineers are preparing MSolo instruments to launch on four robotic missions as part of NASA’s Commercial Lunar Payload Services (CLPS) – the first of which is slated for later this year. MSolo will help analyze the chemical makeup of landing sites on the Moon, with the later missions also studying water on the lunar surface.

Record ID
KSC-20220214-PH-KLS01_0102
NASA center
KSC
Date
2022-02-14
Credit
NASA/Kim Shiflett
Keywords
CLPS, EMI, Electromagnetic interference testing, KSC, Kennedy Space Center, MSolo, Mass Spectrometer Observing Lunar Operations, Moon, NASA, VIPER, Volatiles Investigating Polar Exploration Rover, lunar