Update Site (from NASA)
Explore NASA’s Image and Video Library.
Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.
Sign in to suggest a Marvel.
Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.
NASA image records
KSC · 2022-05-11 · KSC-20220511-PH-KLS01_0145
Artemis II CTV Demo
Artemis I Launch Director Charlie Blackwell Thompson, at right, views the Artemis I Space Launch System and Orion stack with Anthony Aquila, chief executive officer of Canoo Technologies…
Inspect NASA record
Artemis I Launch Director Charlie Blackwell Thompson, at right, views the Artemis I Space Launch System and Orion stack with Anthony Aquila, chief executive officer of Canoo Technologies Inc., inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on May 11, 2022. Canoo Technologies, was awarded a contract to design and provide the next generation of CTVs for the Artemis crewed missions. Representatives with Canoo were at the spaceport demonstrating the environmentally friendly fleet of vehicles. Artemis II will be the first Artemis mission flying crew aboard Orion. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220511-PH-KLS01_0145
- NASA center
- KSC
- Date
- 2022-05-11
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis, Artemis II, Astronauts, CTV, Crew Transport Vehicles, KSC, O&C, Orion, Pad 39B, Training Auditorium, VAB
KSC · 2011-05-10 · KSC-2011-3422
KSC-2011-3422
CAPE CANAVERAL, Fla. -- Workers transport the second stage of a United Launch Alliance Delta II launch vehicle to NASA's Space Launch Complex 17B in Florida. There, it…
Inspect NASA record
CAPE CANAVERAL, Fla. -- Workers transport the second stage of a United Launch Alliance Delta II launch vehicle to NASA's Space Launch Complex 17B in Florida. There, it will be hoisted into the mobile service tower and mated with the first stage. The Delta II will carry NASA's Gravity Recovery and Interior Laboratory, or GRAIL, spacecraft into lunar orbit. The GRAIL mission is a part of NASA's Discovery Program. GRAIL will fly twin spacecraft in tandem orbits around the moon for several months to measure its gravity field. The mission also will answer longstanding questions about Earth's moon and provide scientists a better understanding of how Earth and other rocky planets in the solar system formed. GRAIL is scheduled to launch Sept. 8. For more information visit: http://science.nasa.gov/missions/grail/. Photo credit: NASA/Jack Pfaller
- Record ID
- KSC-2011-3422
- NASA center
- KSC
- Date
- 2011-05-10
- Keywords
- grail, elv, delta II
KSC · 2011-04-25 · KSC-2011-3082
KSC-2011-3082
CAPE CANAVERAL, Fla. -- A solid-fueled booster is lifted into Launch Complex 17-B at Cape Canaveral Air Force Station in Florida where a United Launch Alliance Delta II…
Inspect NASA record
CAPE CANAVERAL, Fla. -- A solid-fueled booster is lifted into Launch Complex 17-B at Cape Canaveral Air Force Station in Florida where a United Launch Alliance Delta II is being prepared for launch. The Delta II will carry NASA's Gravity Recovery and Interior Laboratory, or GRAIL, spacecraft into lunar orbit. The GRAIL mission is a part of NASA's Discovery Program. GRAIL will fly twin spacecraft in tandem orbits around the moon for several months to measure its gravity field. The mission also will answer longstanding questions about Earth's moon and provide scientists a better understanding of how Earth and other rocky planets in the solar system formed. GRAIL is scheduled to launch September 8, 2011. For more information visit: http://science.nasa.gov/missions/grail/. Photo credit: NASA/Jim Grossmann
- Record ID
- KSC-2011-3082
- NASA center
- KSC
- Date
- 2011-04-25
- Keywords
- Delta II, ELV, science, exploration, solar system, Goddard, JPL
KSC · 2011-04-07 · KSC-2011-2798
KSC-2011-2798
CAPE CANAVERAL, Fla. -- NASA's Gravity Recovery and Interior Laboratory, or GRAIL, spacecraft logo is emblazed on the first stage of a United Launch Alliance Delta II launch…
Inspect NASA record
CAPE CANAVERAL, Fla. -- NASA's Gravity Recovery and Interior Laboratory, or GRAIL, spacecraft logo is emblazed on the first stage of a United Launch Alliance Delta II launch vehicle, now secured in the gantry at Cape Canaveral Air Force Station's Pad 17B. The Delta II will carry GRAIL into lunar orbit. The GRAIL mission is a part of NASA's Discovery Program. GRAIL will fly twin spacecraft in tandem orbits around the moon for several months to measure its gravity field. The mission also will answer longstanding questions about Earth's moon and provide scientists a better understanding of how Earth and other rocky planets in the solar system formed. GRAIL is scheduled to launch September 8, 2011. For more information visit: http://science.nasa.gov/missions/grail/. Photo credit: NASA/Jim Grossmann
- Record ID
- KSC-2011-2798
- NASA center
- KSC
- Date
- 2011-04-07
- Keywords
- grail, elv, delta II
KSC · 2011-04-07 · KSC-2011-2800
KSC-2011-2800
CAPE CANAVERAL, Fla. -- At Cape Canaveral Air Force Station in Florida, the first stage of a United Launch Alliance Delta II launch vehicle is secured into position…
Inspect NASA record
CAPE CANAVERAL, Fla. -- At Cape Canaveral Air Force Station in Florida, the first stage of a United Launch Alliance Delta II launch vehicle is secured into position inside the Pad 17B gantry. The Delta II will carry NASA's Gravity Recovery and Interior Laboratory, or GRAIL, spacecraft into lunar orbit. The GRAIL mission is a part of NASA's Discovery Program. GRAIL will fly twin spacecraft in tandem orbits around the moon for several months to measure its gravity field. The mission also will answer longstanding questions about Earth's moon and provide scientists a better understanding of how Earth and other rocky planets in the solar system formed. GRAIL is scheduled to launch September 8, 2011. For more information visit: http://science.nasa.gov/missions/grail/. Photo credit: NASA/Jim Grossmann
- Record ID
- KSC-2011-2800
- NASA center
- KSC
- Date
- 2011-04-07
- Keywords
- grail, elv, delta II
JSC · 1969-07-24 · S69-40302
Inflight - Apollo XI (Mission Control Center [MCC]) - MSC
S69-40302 (24 July 1969) --- A group of NASA and Manned Spacecraft Center (MSC) officials join in with the flight controllers in the Mission Operations Control Room (MOCR)…
Inspect NASA record
S69-40302 (24 July 1969) --- A group of NASA and Manned Spacecraft Center (MSC) officials join in with the flight controllers in the Mission Operations Control Room (MOCR) in the Mission Control Center (MCC), Building 30, in celebrating the successful conclusion of the Apollo 11 lunar landing mission. From left foreground are Dr. Maxime A. Faget, MSC Director of Engineering and Development; George S. Trimble, MSC Deputy Director; Dr. Christopher C. Kraft Jr., MSC Director of Flight Operations; Julian Scheer (in back), Assistant Administrator, Office of Public Affairs, NASA Headquarters; George M. Low, Manager, Apollo Spacecraft Program, MSC; Dr. Robert R. Gilruth, MSC Director; and Charles W. Mathews, Deputy Associate Administrator, Office of Manned Space Flight, NASA Headquarters.
- Record ID
- S69-40302
- NASA center
- JSC
- Date
- 1969-07-24
KSC · 2022-09-02 · KSC-20220902-PH-SBS02_0122
Astronaut Group & Moon Pod Essay Winners Visit Artemis I
NASA astronaut Anne McClain poses for a photograph in front of NASA’s Artemis I Space Launch System and Orion spacecraft atop the mobile launcher on the pad at…
Inspect NASA record
NASA astronaut Anne McClain poses for a photograph in front of NASA’s Artemis I Space Launch System and Orion spacecraft atop the mobile launcher on the pad at Launch Complex 39B at the agency’s Kennedy Space Center in Florida on Sept. 2, 2022. The first in a series of increasingly complex missions, Artemis I will provide a foundation for human deep space exploration and demonstrate our commitment and capability to extend human presence to the Moon and beyond. The primary goal of Artemis I is to thoroughly test the integrated systems before crewed missions by operating the spacecraft in a deep space environment, testing Orion’s heat shield, and recovering the crew module after reentry, descent, and splashdown. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220902-PH-SBS02_0122
- NASA center
- KSC
- Date
- 2022-09-02
- Credit
- NASA/Steven Seipel
- Keywords
- Artemis, Artemis I, Artemis Student Challenge, Astronaut, EGS, Exploration Ground Systems, KSC, Kennedy Space Center, Moon Pod, Moon Pod Essay Contest, SLS, STEM
KSC · 2026-06-23 · KSC-20260623-PH-CSH01-0033
Artemis III RS-25 Engine Processing at KSC
Teams at NASA’s Kennedy Space Center in Florida offload the second of four RS-25 SLS (Space Launch System) rocket engines built by L3 Harris Technologies for the agency's…
Inspect NASA record
Teams at NASA’s Kennedy Space Center in Florida offload the second of four RS-25 SLS (Space Launch System) rocket engines built by L3 Harris Technologies for the agency's Artemis III mission on Tuesday, June 23, 2026, inside the spaceport’s Vehicle Assembly Building. The SLS rocket will use four RS-25 engines in the core stage to propel the Orion spacecraft into orbit providing over two million pounds of thrust at liftoff. As part of the Golden Age of innovation and exploration, NASA will send Artemis astronauts on increasingly difficult missions to explore more of the Moon for scientific discovery and economic benefits, establish an enduring human presence on the lunar surface, and build on our foundation for the first crewed missions to Mars.
- Record ID
- KSC-20260623-PH-CSH01-0033
- NASA center
- KSC
- Date
- 2026-06-23
- Keywords
- Artemis III, Artemis, SLS, Space Launch System, RS-25, engines, VAB, vehicle Assembly Building, KSC, Kennedy Space Center, EGS, Exploration Ground Systems
KSC · 2011-04-26 · KSC-2011-3094
KSC-2011-3094
CAPE CANAVERAL, Fla. -- A technician watches as the first set of solid-fueled boosters are positioned beside the first stage of a United Launch Alliance Delta II rocket…
Inspect NASA record
CAPE CANAVERAL, Fla. -- A technician watches as the first set of solid-fueled boosters are positioned beside the first stage of a United Launch Alliance Delta II rocket in preparation for attachment. The boosters are being attached to the rocket at Launch Complex 17-B at Cape Canaveral Air Force Station in Florida. The Delta II will carry NASA's Gravity Recovery and Interior Laboratory, or GRAIL, spacecraft into lunar orbit. The GRAIL mission is a part of NASA's Discovery Program. GRAIL will fly twin spacecraft in tandem orbits around the moon for several months to measure its gravity field. The mission also will answer longstanding questions about Earth's moon and provide scientists a better understanding of how Earth and other rocky planets in the solar system formed. GRAIL is scheduled to launch September 8, 2011. For more information visit: http://science.nasa.gov/missions/grail/. Photo credit: NASA/Jim Grossmann
- Record ID
- KSC-2011-3094
- NASA center
- KSC
- Date
- 2011-04-26
- Keywords
- Delta II, ELV, science, exploration, solar system, Goddard, JPL
KSC · 2023-07-19 · KSC-20230719-PH-JNS01_0001
Artemis II Crew Visits Naval Base San Diego
NASA’s Artemis II astronauts tour the U.S. Navy’s Defense Distribution Depot Center in San Diego, California, on July 19, 2023. The depot is currently being used by NASA…
Inspect NASA record
NASA’s Artemis II astronauts tour the U.S. Navy’s Defense Distribution Depot Center in San Diego, California, on July 19, 2023. The depot is currently being used by NASA to house the Vehicle Advanced Demonstrator for Emergency Recovery (VADER), a replica of the Orion crew module. In preparation for the agency’s Artemis II crewed mission, NASA and the U.S. Navy will conduct a series of tests to demonstrate and evaluate the processes, procedures, and hardware used in Orion recovery operations for crewed lunar missions. NASA astronauts Commander Reid Wiseman, Pilot Victor Glover, and Mission Specialist Christina Koch, and Canadian Space Agency astronaut Jeremy Hansen will venture around the Moon on Artemis II. The approximately 10-day flight will test NASA's foundational human deep space exploration capabilities, the Space Launch System rocket and Orion spacecraft, for the first time with astronauts and will pave the way to establishing a long-term presence at the Moon for science and exploration through Artemis.
- Record ID
- KSC-20230719-PH-JNS01_0001
- NASA center
- KSC
- Date
- 2023-07-19
- Credit
- U.S. Navy Photo by Mass Communic
- Keywords
- Artemis, Artemis II, Artemis recovery, URT-10, Underway Recovery Test 10, Victor Glover, Reid Wiseman, Christina Hammock Koch, Jeremy Hansen
KSC · 2011-04-25 · KSC-2011-3072
KSC-2011-3072
CAPE CANAVERAL, Fla. -- The first stage of a United Launch Alliance Delta II rocket at Launch Complex 17-B at Cape Canaveral Air Force Station in Florida where…
Inspect NASA record
CAPE CANAVERAL, Fla. -- The first stage of a United Launch Alliance Delta II rocket at Launch Complex 17-B at Cape Canaveral Air Force Station in Florida where it is being prepared for launch. The Delta II will carry NASA's Gravity Recovery and Interior Laboratory, or GRAIL, spacecraft into lunar orbit. The GRAIL mission is a part of NASA's Discovery Program. GRAIL will fly twin spacecraft in tandem orbits around the moon for several months to measure its gravity field. The mission also will answer longstanding questions about Earth's moon and provide scientists a better understanding of how Earth and other rocky planets in the solar system formed. GRAIL is scheduled to launch September 8, 2011. For more information visit: http://science.nasa.gov/missions/grail/. Photo credit: NASA/Jim Grossmann
- Record ID
- KSC-2011-3072
- NASA center
- KSC
- Date
- 2011-04-25
- Keywords
- Delta II, ELV, science, exploration, solar system, Goddard, JPL
KSC · 2026-07-14 · KSC-20260714-PH-CSH01-0004
Artemis III RS-25 Engine Processing at KSC
Teams at NASA’s Kennedy Space Center in Florida offload the third of four RS-25 SLS (Space Launch System) rocket engines built by L3 Harris Technologies for the agency's…
Inspect NASA record
Teams at NASA’s Kennedy Space Center in Florida offload the third of four RS-25 SLS (Space Launch System) rocket engines built by L3 Harris Technologies for the agency's Artemis III mission on Tuesday, July 14, 2026, inside the spaceport’s Vehicle Assembly Building. The SLS rocket will use four RS-25 engines in the core stage to propel the Orion spacecraft into orbit providing over two million pounds of thrust at liftoff. As part of the Golden Age of innovation and exploration, NASA will send Artemis astronauts on increasingly difficult missions to explore more of the Moon for scientific discovery and economic benefits, establish an enduring human presence on the lunar surface, and build on our foundation for the first crewed missions to Mars.
- Record ID
- KSC-20260714-PH-CSH01-0004
- NASA center
- KSC
- Date
- 2026-07-14
- Keywords
- Artemis III, Artemis, SLS, Space Launch System, RS-25, engines, VAB, vehicle Assembly Building, KSC, Kennedy Space Center, EGS, Exploration Ground Systems