Update Site (from NASA)
Explore NASA’s Image and Video Library.
Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.
Sign in to suggest a Marvel.
Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.
NASA image records
MSFC · 1965-01-01 · 6517815
Saturn Apollo Program
Workers at the Marshall Space Flight Center's (MSFC) Dynamic Test Stand install S-IB-200D, a dynamic test version of the Saturn IB launch vehicle's first stage, on January 11,…
Inspect NASA record
Workers at the Marshall Space Flight Center's (MSFC) Dynamic Test Stand install S-IB-200D, a dynamic test version of the Saturn IB launch vehicle's first stage, on January 11, 1965. MSFC Test Laboratory persornel assembled a complete Saturn IB to test the launch vehicle's structural soundness. Developed by the MSFC as an interim vehicle in MSFC's "building block" approach to the Saturn rocket development, the Saturn IB utilized Saturn I technology to further develop and refine the larger boosters and the Apollo spacecraft capabilities required for the manned lunar missions.
- Record ID
- 6517815
- NASA center
- MSFC
- Date
- 1965-01-01
- Keywords
- Saturn IB, S-IB-200D, Dynamic Test Stand
KSC · 2022-06-03 · KSC-20220603-PH-GEB01_0124
Crawler Transporter 2 Roll into VAB for Artemis I WDR Rollout &
With all of the work platforms retracted, NASA’s Space Launch System and Orion spacecraft atop the mobile launcher are in view in High Bay 3 of the Vehicle…
Inspect NASA record
With all of the work platforms retracted, NASA’s Space Launch System and Orion spacecraft atop the mobile launcher are in view in High Bay 3 of the Vehicle Assembly Building at the agency’s Kennedy Space Center in Florida on June 3, 2022. The crawler-transporter, driven by engineers, will slide under the Artemis I stack atop the mobile launcher and carry it to Launch Complex 39B for a wet dress rehearsal test ahead of the Artemis I launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220603-PH-GEB01_0124
- NASA center
- KSC
- Date
- 2022-06-03
- Credit
- NASA/Glenn Benson
- Keywords
- Artemis, Artemis I, EGS, Exploration Ground System, KSC, Kennedy Space Center, Orion, Pad B, SLS, Space Launch System, VAB, rollout
HQ · 2024-04-10 · NHQ202404100010
NASA and Japan Briefing
Japan Aerospace Exploration Agency (JAXA) President Hiroshi Yamakawa discusses the historic agreement signed April 9th at NASA Headquarters, between the United States and Japan to advance sustainable human…
Inspect NASA record
Japan Aerospace Exploration Agency (JAXA) President Hiroshi Yamakawa discusses the historic agreement signed April 9th at NASA Headquarters, between the United States and Japan to advance sustainable human exploration of the Moon, Wednesday, April 10, 2024, at the Japan Aerospace Exploration Agency (JAXA) offices in Washington. Under the agreement, Japan will design, develop, and operate a pressurized rover for crewed and uncrewed exploration on the Moon. NASA will provide the launch and delivery of the rover to the Moon as well as two Japanese astronaut missions to the lunar surface. Photo Credit: Photo Credit: (NASA/Bill Ingalls)
- Record ID
- NHQ202404100010
- NASA center
- HQ
- Date
- 2024-04-10
- Credit
- NASA/Bill Ingalls
- Keywords
- DC, Hiroshi Yamakawa, Japan Aerospace Exploration Agency (JAXA), Washington
KSC · 2022-03-21 · KSC-20220321-PH-JBS01_0105
Artemis I at Pad 39B - Sunrise
A sunrise view of the Artemis I Space Launch System (SLS) and Orion spacecraft at Launch Pad 39B at NASA’s Kennedy Space Center in Florida on March 21,…
Inspect NASA record
A sunrise view of the Artemis I Space Launch System (SLS) and Orion spacecraft at Launch Pad 39B at NASA’s Kennedy Space Center in Florida on March 21, 2022. The SLS and Orion atop the mobile launcher were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220321-PH-JBS01_0105
- NASA center
- KSC
- Date
- 2022-03-21
- Credit
- NASA/Ben Smegelsky
- Keywords
- Artemis I, Kennedy Space Center, Pad 39B, Rollout, VAB, Wet Dress Rehearsal
MSFC · 1963-12-05 · 9808563
Saturn Apollo Program
The test laboratory of the Marshall Space Flight Center (MSFC) tested the F-1 engine, the most powerful rocket engine ever fired at MSFC. The engine was tested on…
Inspect NASA record
The test laboratory of the Marshall Space Flight Center (MSFC) tested the F-1 engine, the most powerful rocket engine ever fired at MSFC. The engine was tested on the newly modified Saturn IB Static Test Stand which had been used for three years to test the Saturn I eight-engine booster, S-I (first) stage. In 1961 the test stand was modified to permit static firing of the S-I/S-IB stage and the name of the stand was then changed to the S-IB Static Test Stand. Producing a combined thrust of 7,500,000 pounds, five F-1 engines powered the S-IC (first) stage of the Saturn V vehicle for the marned lunar mission.
- Record ID
- 9808563
- NASA center
- MSFC
- Date
- 1963-12-05
- Keywords
- F-1 Engine, S-IB Static Test Stand
KSC · 2022-08-08 · KSC-20220808-PH-FMX01_0002
Artemis I SLS Beauty Shots
The Artemis I Orion spacecraft, secured on the Space Launch System and enclosed in its launch abort system, is in view high up in High Bay 3 of…
Inspect NASA record
The Artemis I Orion spacecraft, secured on the Space Launch System and enclosed in its launch abort system, is in view high up in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Aug. 8, 2022. Artemis I will provide a foundation for human deep space exploration and demonstrate NASA’s capability to extend human presence to the Moon and beyond. The primary goal of Artemis I is to thoroughly test the Space Launch System rocket and Orion spacecraft’s integrated systems before crewed missions. Under Artemis, NASA aims to land the first woman and first person of color on the Moon and establish sustainable lunar exploration.
- Record ID
- KSC-20220808-PH-FMX01_0002
- NASA center
- KSC
- Date
- 2022-08-08
- Credit
- NASA/Frank Michaux
- Keywords
- Artemis, Artemis I, Orion, SLS, Space Launch System
KSC · 2023-08-07 · KSC-20230807-PH-KLS01_0148
Artemis II Crew with EGS
Artemis II astronauts visit NASA’s Kennedy Space Center in Florida on Aug. 7, 2023. From left, are CSA (Canadian Space Agency) astronaut Jeremy Hansen, and NASA astronaut Reid…
Inspect NASA record
Artemis II astronauts visit NASA’s Kennedy Space Center in Florida on Aug. 7, 2023. From left, are CSA (Canadian Space Agency) astronaut Jeremy Hansen, and NASA astronaut Reid Wiseman. Behind them is NASA astronaut Victor Glover. They are with Exploration Ground Systems team members in the transfer aisle of the Vehicle Assembly Building. The approximately 10-day Artemis II flight will test NASA’s foundational human deep space exploration capabilities, the Space Launch System rocket and Orion spacecraft, for the first time with astronauts and will pave the way for lunar surface missions, including landing the first woman and the first person of color on the Moon.
- Record ID
- KSC-20230807-PH-KLS01_0148
- NASA center
- KSC
- Date
- 2023-08-07
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis II, Artemis II crew, Astronauts, EGS, Exploration Ground Systems, KSC, Kennedy Space Center
HQ · 2019-03-11 · NHQ201803110017
Moon to Mars Event
NASA Administrator Jim Bridenstine talks about the Gateway that will be in lunar orbit during an event highlighting the agency’s progress toward sending astronauts to the Moon and…
Inspect NASA record
NASA Administrator Jim Bridenstine talks about the Gateway that will be in lunar orbit during an event highlighting the agency’s progress toward sending astronauts to the Moon and on to Mars, Monday, March 11, 2019, at the Neil Armstrong Operations and Checkout Building at NASA's Kennedy Space Center in Florida. Representatives from the Kennedy workforce, news media, and social media were in attendance. NASA's Orion spacecraft, which is scheduled to be flown on Exploration Mission-2, was on display. For information on NASA's Moon to Mars plans, visit: www.nasa.gov/moontomars Photo credit: (NASA/Aubrey Gemignani)
- Record ID
- NHQ201803110017
- NASA center
- HQ
- Date
- 2019-03-11
- Credit
- NASA/Aubrey Gemignani
- Keywords
- Cape Canaveral, Florida, Gateway, Jim Bridenstine, Kennedy Space Center, Moon to Mars, NASA Administrator, Neil Armstrong Operations and Checkout Building, Orion
KSC · 2021-07-28 · KSC-20210728-PH-KLS01_0014
Coverage of NASA Administrator Visit
NASA Administrator Bill Nelson tours the Vehicle Assembly Building (VAB) during a visit to the agency’s Kennedy Space Center in Florida on July 28, 2021. While inside the…
Inspect NASA record
NASA Administrator Bill Nelson tours the Vehicle Assembly Building (VAB) during a visit to the agency’s Kennedy Space Center in Florida on July 28, 2021. While inside the VAB, he had the opportunity to view the Space Launch System (SLS) rocket as preparations for the Artemis I launch continue. The first in an increasingly complex set of missions, Artemis I will test SLS and Orion as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will land the first woman and first person of color on the lunar surface, as well as establish a sustainable presence on and around the Moon.
- Record ID
- KSC-20210728-PH-KLS01_0014
- NASA center
- KSC
- Date
- 2021-07-28
- Credit
- NASA/Kim Shiflett
- Keywords
- Administrator, Administrator Bill Nelson, Bill Nelson, Bob Cabana, KSC, Kennedy Space Center, Pam Melroy, Tour, Visit
JSC · 1969-03-03 · S69-25883
Apollo 9 crew leaves Spacecraft Operations Building during countdown
S69-25883 (3 March 1969) --- The Apollo 9 crew leaves the Kennedy Space Center's Manned Spacecraft Operations Building during the Apollo 9 prelaunch countdown. Leading is astronaut James…
Inspect NASA record
S69-25883 (3 March 1969) --- The Apollo 9 crew leaves the Kennedy Space Center's Manned Spacecraft Operations Building during the Apollo 9 prelaunch countdown. Leading is astronaut James A. McDivitt, commander; followed by astronaut David R. Scott, command module pilot; and Russell L. Schweickart, lunar module pilot. Moments later they entered the special transfer van which transported them to their waiting spacecraft at Pad A, Launch Complex 39. Apollo 9 was launched at 11 a.m. (EST), March 3, 1969, on a 10-day Earth-orbital mission.
- Record ID
- S69-25883
- NASA center
- JSC
- Date
- 1969-03-03
- Keywords
- APOLLO 9, APOLLO PROJECT, ASTRONAUTS, COUNTDOWN, FACILITIES, FLORIDA, KENNEDY SPACE CENTER, SPACE SUITS, TRANSPORT VEHICLES
KSC · 2026-11-11 · KSC-20261110-PH-JLS01_0089
Artemis III November Launch Sim
Jeremy Graeber, Artemis assistant launch director, participates in a launch countdown simulation for Artemis III on Tuesday, Nov. 10, 2026, inside Firing Room 1 of the Rocco A.…
Inspect NASA record
Jeremy Graeber, Artemis assistant launch director, participates in a launch countdown simulation for Artemis III on Tuesday, Nov. 10, 2026, inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. This marked the first long day simulation for the Artemis III mission where teams combined the cryogenic propellant loading and terminal count portions of the countdown. Artemis III will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.
- Record ID
- KSC-20261110-PH-JLS01_0089
- NASA center
- KSC
- Date
- 2026-11-11
- Credit
- NASA/Jonathan Shaban
- Keywords
- Artemis 3, Artemis III, Artemis launch team, Firing Room 1, Firing Room 2, KSC, Kennedy Space Center, LCC, Launch Control Center, launch simulation
KSC · 2021-10-15 · KSC-20211015-PH-KLS01_0026
Orion Management Tour VAB
NASA’s Orion Program and Lockheed Martin management tour the Vehicle Assembly at NASA’s Kennedy Space Center in Florida on Oct. 15, 2021The Orion spacecraft for NASA’s Artemis I…
Inspect NASA record
NASA’s Orion Program and Lockheed Martin management tour the Vehicle Assembly at NASA’s Kennedy Space Center in Florida on Oct. 15, 2021The Orion spacecraft for NASA’s Artemis I mission, fully assembled with its launch abort system, is stacked on top of the Space Launch System rocket in High Bay 3. Launching in 2021, Artemis I will be an uncrewed test flight of the Orion spacecraft and Space Launch System rocket as an integrated system ahead of crewed flights to the Moon. Under Artemis, NASA aims to land the first woman and first person of color on the Moon and establish sustainable lunar exploration.
- Record ID
- KSC-20211015-PH-KLS01_0026
- NASA center
- KSC
- Date
- 2021-10-15
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis, Orion, SLS, Space Launch System, VAB, Vehicle Assembly Building