Interstellar Minds

‹ Interstellar Minds

Update Site (from NASA)

Explore NASA’s Image and Video Library.

Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.

Sign in to suggest a Marvel.

Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.

NASA image records

ESM-3 Arrival at KSC

KSC · 2024-09-03 · KSC-20240903-PH-JBS01_0012

ESM-3 Arrival at KSC

The transport carrier containing the European Service Module 3 for NASA’s Artemis III mission arrives at Port Canaveral on Tuesday, Sept. 3, 2024, awaiting transportation to NASA’s Kennedy…

Inspect NASA record

The transport carrier containing the European Service Module 3 for NASA’s Artemis III mission arrives at Port Canaveral on Tuesday, Sept. 3, 2024, awaiting transportation to NASA’s Kennedy Space Center in Florida. The European Service Module 3, which is assembled by Airbus in Bremen, Germany, traveled 10 days across the Atlantic Ocean via the Canopee ship. The European Service Module 3 provides the spacecraft’s propulsion, thermal control, electrical power, and life support systems. Artemis III will send four astronauts to the lunar orbit where two crew members will spend a week near the South Pole of the Moon conducting new science. 

Record ID
KSC-20240903-PH-JBS01_0012
NASA center
KSC
Date
2024-09-03
Credit
NASA/Ben Smegelsky
Keywords
John. F. Kennedy Space Center, ¿Kennedy, Kennedy Space Center, KSC, Spaceport, Cape Canaveral, NASA, rocket ranch, Florida, multi-user spaceport, premier spaceport, space coast
Artemis I at Pad 39B

KSC · 2022-04-11 · KSC-20220411-PH-JBS01_0004

Artemis I at Pad 39B

A sunrise view of the Artemis I Space Launch System (SLS) and Orion spacecraft at Launch Pad 39B at NASA’s Kennedy Space Center in Florida on April 11,…

Inspect NASA record

A sunrise view of the Artemis I Space Launch System (SLS) and Orion spacecraft at Launch Pad 39B at NASA’s Kennedy Space Center in Florida on April 11, 2022. Mist rises from a nearby waterway. The SLS and Orion atop the mobile launcher were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220411-PH-JBS01_0004
NASA center
KSC
Date
2022-04-11
Credit
NASA/Ben Smegelsky
Keywords
Artemis, Artemis I, Orion, Space Launch System, SLS, Launch Complex 39B, Launch Pad 39B, Pad 39B, Kennedy Space Center, KSC
NASA and Japan Briefing

HQ · 2024-04-10 · NHQ202404100017

NASA and Japan Briefing

NASA Pressurized Rover Project Manager Danny Newswander discusses the historic agreement signed April 9th at NASA Headquarters, between the United States and Japan to advance sustainable human exploration…

Inspect NASA record

NASA Pressurized Rover Project Manager Danny Newswander discusses the historic agreement signed April 9th at NASA Headquarters, between the United States and Japan to advance sustainable human exploration of the Moon, Wednesday, April 10, 2024, at the Japan Aerospace Exploration Agency (JAXA) offices in Washington. Under the agreement, Japan will design, develop, and operate a pressurized rover for crewed and uncrewed exploration on the Moon. NASA will provide the launch and delivery of the rover to the Moon as well as two Japanese astronaut missions to the lunar surface. Photo Credit: Photo Credit: (NASA/Bill Ingalls)

Record ID
NHQ202404100017
NASA center
HQ
Date
2024-04-10
Credit
NASA/Bill Ingalls
Keywords
DC, Danny Newswander, Japan Aerospace Exploration Agency (JAXA), Washington
KSC-69PC-0397

KSC · 1969-07-16 · KSC-69PC-0397

KSC-69PC-0397

CAPE CANAVERAL, Fla. -- The American Flag heralds the flight of Apollo 11, man's first lunar landing mission. This double exposure was made with a 1,000 mm lens.…

Inspect NASA record

CAPE CANAVERAL, Fla. -- The American Flag heralds the flight of Apollo 11, man's first lunar landing mission. This double exposure was made with a 1,000 mm lens. The photograph was taken from Cape Kennedy, adjacent to Kennedy Space Center, where Apollo 11 lifted off from pad 39A at 9:32 a.m. EDT. This image was imposed upon the image of hte flag, filmed a day earlier. In the photo, the rocket at an alititude of about 5,000 feet. A band of super-cold propellants seems to circle the rocket near its center. The effect is caused by the difference in temperature between the propellants and the atmosphere. Photo credit: NASA

Record ID
KSC-69PC-0397
NASA center
KSC
Date
1969-07-16
Orion Stage Adapter (OSA) Secondary Payload Cubesat

KSC · 2021-08-05 · KSC-20210805-PH-CSH01_0009

Orion Stage Adapter (OSA) Secondary Payload Cubesat

Small satellites, called CubeSats, are shown secured inside NASA’s Orion stage adapter at NASA’s Kennedy Space Center in Florida on Aug. 5, 2021. Technicians from Exploration Ground Systems…

Inspect NASA record

Small satellites, called CubeSats, are shown secured inside NASA’s Orion stage adapter at NASA’s Kennedy Space Center in Florida on Aug. 5, 2021. Technicians from Exploration Ground Systems and Jacobs teams are working with developers of the shoebox-sized secondary payloads as they undergo final processing. The ring-shaped stage adapter will be connected to the Space Launch System’s Interim Cryogenic Propulsion Stage, and the Orion spacecraft will be secured on top. The CubeSats will conduct a variety of science experiments and technology demonstrations that will expand our knowledge of the lunar surface during the Artemis I mission.

Record ID
KSC-20210805-PH-CSH01_0009
NASA center
KSC
Date
2021-08-05
Credit
NASA/Cory S Huston
Keywords
Artemis, Artemis I, Cubesat, EGS, Exploration Ground Systems, KSC, Kennedy Space Center, MPPF, Multi-Payload Processing Facility, NASA, OSA, Orion
NASA and Japan Briefing

HQ · 2024-04-10 · NHQ202404100006

NASA and Japan Briefing

Japan’s Minister of Education, Culture, Sports, Science and Technology Masahito Moriyama, center, discusses the historic agreement signed April 9th at NASA Headquarters, between the United States and Japan…

Inspect NASA record

Japan’s Minister of Education, Culture, Sports, Science and Technology Masahito Moriyama, center, discusses the historic agreement signed April 9th at NASA Headquarters, between the United States and Japan to advance sustainable human exploration of the Moon, Wednesday, April 10, 2024, at the Japan Aerospace Exploration Agency (JAXA) offices in Washington. Under the agreement, Japan will design, develop, and operate a pressurized rover for crewed and uncrewed exploration on the Moon. NASA will provide the launch and delivery of the rover to the Moon as well as two Japanese astronaut missions to the lunar surface. Photo Credit: Photo Credit: (NASA/Bill Ingalls)

Record ID
NHQ202404100006
NASA center
HQ
Date
2024-04-10
Credit
NASA/Bill Ingalls
Keywords
Bill Nelson, DC, Hiroshi Yamakawa, Japan Aerospace Exploration Agency (JAXA), Masahito Moriyama, NASA Administrator, Washington
Orion Stage Adapter (OSA) Secondary Payload Cubesat

KSC · 2021-08-05 · KSC-20210805-PH-CSH01_0003

Orion Stage Adapter (OSA) Secondary Payload Cubesat

Small satellites, called CubeSats, are shown secured inside NASA’s Orion stage adapter at NASA’s Kennedy Space Center in Florida on Aug. 5, 2021. Technicians from Exploration Ground Systems…

Inspect NASA record

Small satellites, called CubeSats, are shown secured inside NASA’s Orion stage adapter at NASA’s Kennedy Space Center in Florida on Aug. 5, 2021. Technicians from Exploration Ground Systems and Jacobs teams are working with developers of the shoebox-sized secondary payloads as they undergo final processing. The ring-shaped stage adapter will be connected to the Space Launch System’s Interim Cryogenic Propulsion Stage, and the Orion spacecraft will be secured on top. The CubeSats will conduct a variety of science experiments and technology demonstrations that will expand our knowledge of the lunar surface during the Artemis I mission.

Record ID
KSC-20210805-PH-CSH01_0003
NASA center
KSC
Date
2021-08-05
Credit
NASA/Cory S Huston
Keywords
Artemis, Artemis I, Cubesat, EGS, Exploration Ground Systems, KSC, Kennedy Space Center, MPPF, Multi-Payload Processing Facility, NASA, OSA, Orion
Kathy Lueders Visit to KSC

KSC · 2020-11-05 · KSC-20201105-PH-FMX01_0036

Kathy Lueders Visit to KSC

Senior managers from Orion, NASA, and Lockheed Martin view the Artemis II crew module inside a clean room during a visit to the Neil Armstrong Operations and Checkout…

Inspect NASA record

Senior managers from Orion, NASA, and Lockheed Martin view the Artemis II crew module inside a clean room during a visit to the Neil Armstrong Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida on Nov. 5, 2020. From left are Jim Skaggs, senior manager of Kennedy Operations for Lockheed Martin; Kathy Lueders, associate administrator of NASA’s Human Exploration and Operations Mission Directorate; and Scott Wilson, manager, Orion Production Office. Artemis II will be the first crewed flight test of the Space Launch System rocket and the Orion spacecraft. Under the Artemis program, NASA is planning to land the first woman and the next man on the lunar surface by 2024.

Record ID
KSC-20201105-PH-FMX01_0036
NASA center
KSC
Date
2020-11-05
Credit
NASA/Frank Michaux
Keywords
Artemis, Artemis I, FAST cell, HEO, Kathy Lueders, O&C, Orion
Artemis II Crew with EGS

KSC · 2023-08-07 · KSC-20230807-PH-KLS01_0259

Artemis II Crew with EGS

Artemis II astronauts visit the Artemis launch team inside Firing Room 1 in the Launch Control Center at NASA’s Kennedy Space Center in Florida on Aug. 7, 2023.…

Inspect NASA record

Artemis II astronauts visit the Artemis launch team inside Firing Room 1 in the Launch Control Center at NASA’s Kennedy Space Center in Florida on Aug. 7, 2023. In front, from left are CSA (Canadian Space Agency) astronaut Jeremy Hansen, and NASA astronauts Victor Glover, Christina Koch, and Reid Wiseman. The approximately 10-day Artemis II flight will test NASA’s foundational human deep space exploration capabilities, the Space Launch System rocket and Orion spacecraft, for the first time with astronauts and will pave the way for lunar surface missions, including landing the first woman and the first person of color on the Moon.

Record ID
KSC-20230807-PH-KLS01_0259
NASA center
KSC
Date
2023-08-07
Credit
NASA/Kim Shiflett
Keywords
Artemis II, Artemis II crew, Astronauts, EGS, Exploration Ground Systems, KSC, Kennedy Space Center
Artemis I at Pad 39B - Sunrise

KSC · 2022-03-21 · KSC-20220321-PH-JBS01_0117

Artemis I at Pad 39B - Sunrise

A sunrise view of the Artemis I Space Launch System (SLS) and Orion spacecraft at Launch Pad 39B at NASA’s Kennedy Space Center in Florida on March 21,…

Inspect NASA record

A sunrise view of the Artemis I Space Launch System (SLS) and Orion spacecraft at Launch Pad 39B at NASA’s Kennedy Space Center in Florida on March 21, 2022. The SLS and Orion atop the mobile launcher were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220321-PH-JBS01_0117
NASA center
KSC
Date
2022-03-21
Credit
NASA/Ben Smegelsky
Keywords
Artemis I, Kennedy Space Center, Pad 39B, Rollout, VAB, Wet Dress Rehearsal
Artemis III November Launch Sim

KSC · 2026-11-11 · KSC-20261110-PH-JLS01_0046

Artemis III November Launch Sim

Artemis launch team members participate in a launch countdown simulation for Artemis III on Tuesday, Nov. 10, 2026, inside Firing Room 1 of the Rocco A. Petrone Launch…

Inspect NASA record

Artemis launch team members participate in a launch countdown simulation for Artemis III on Tuesday, Nov. 10, 2026, inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. This marked the first long day simulation for the Artemis III mission where teams combined the cryogenic propellant loading and terminal count portions of the countdown. Artemis III will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.

Record ID
KSC-20261110-PH-JLS01_0046
NASA center
KSC
Date
2026-11-11
Credit
NASA/Jonathan Shaban
Keywords
Artemis 3, Artemis III, Artemis launch team, Firing Room 1, Firing Room 2, KSC, Kennedy Space Center, LCC, Launch Control Center, launch simulation
Landing - STS-4 - Edwards AFB (EAFB), CA

JSC · 1982-07-06 · s82-33226

Landing - STS-4 - Edwards AFB (EAFB), CA

S82-33226 (4 July 1982) --- Inveterate space fan Roy Rogers with astronauts Jerry L. Ross, left, and Guy S. Gardner at Edwards Air Force Base for the landing…

Inspect NASA record

S82-33226 (4 July 1982) --- Inveterate space fan Roy Rogers with astronauts Jerry L. Ross, left, and Guy S. Gardner at Edwards Air Force Base for the landing of the space shuttle Columbia at the conclusion of the STS-4 mission on July 4, 1982. Ross and Gardner piloted chase planes involved in the approach and landing operations for the flight?s conclusion. Also present at the landing was (near far right) former astronaut Edwin E. Aldrin Jr., lunar module pilot for the historic first moon landing of almost 13 years ago. Photo credit: NASA

Record ID
s82-33226
NASA center
JSC
Date
1982-07-06