Update Site (from NASA)
Explore NASA’s Image and Video Library.
Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.
Sign in to suggest a Marvel.
Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.
NASA image records
KSC · 2022-03-23 · KSC-20220323-PH-JBS01_0012
Artemis I at Pad 39B - Sunrise
The sunrise casts a golden glow on the Artemis I Space Launch System (SLS) and Orion spacecraft at Launch Pad 39B at NASA’s Kennedy Space Center in Florida…
Inspect NASA record
The sunrise casts a golden glow on the Artemis I Space Launch System (SLS) and Orion spacecraft at Launch Pad 39B at NASA’s Kennedy Space Center in Florida on March 23, 2022. The SLS and Orion atop the mobile launcher were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220323-PH-JBS01_0012
- NASA center
- KSC
- Date
- 2022-03-23
- Credit
- NASA/Ben Smegelsky
- Keywords
- Artemis I, Kennedy Space Center, Pad 39B, Rollout, VAB, Wet Dress Rehearsal
KSC · 2022-06-03 · KSC-20220603-PH-GEB01_0190
Crawler Transporter 2 Roll into VAB for Artemis I WDR Rollout &
With all of the work platforms retracted, NASA’s Space Launch System and Orion spacecraft atop the mobile launcher are in view in High Bay 3 of the Vehicle…
Inspect NASA record
With all of the work platforms retracted, NASA’s Space Launch System and Orion spacecraft atop the mobile launcher are in view in High Bay 3 of the Vehicle Assembly Building at the agency’s Kennedy Space Center in Florida on June 3, 2022. The crawler-transporter, driven by engineers, will slide under the Artemis I stack atop the mobile launcher and carry it to Launch Complex 39B for a wet dress rehearsal test ahead of the Artemis I launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220603-PH-GEB01_0190
- NASA center
- KSC
- Date
- 2022-06-03
- Credit
- NASA/Glenn Benson
- Keywords
- Artemis, Artemis I, EGS, Exploration Ground System, KSC, Kennedy Space Center, Orion, Pad B, SLS, Space Launch System, VAB, rollout
KSC · 2012-05-23 · KSC-2012-2974
KSC-2012-2974
CAPE CANAVERAL, Fla. - At NASA’s Kennedy Space Center Visitor Complex in Florida, Kennedy Space Center’s Deputy Director Janet Petro speaks during the opening ceremony for NASA’s Lunabotics…
Inspect NASA record
CAPE CANAVERAL, Fla. - At NASA’s Kennedy Space Center Visitor Complex in Florida, Kennedy Space Center’s Deputy Director Janet Petro speaks during the opening ceremony for NASA’s Lunabotics Mining Competition. The mining competition is sponsored by NASA Kennedy Space Center’s Education Office for the agency’s Exploration Systems Mission Directorate. Undergraduate and graduate students from more than 50 universities and colleges in the U.S. and other countries use their remote-controlled Lunabots to maneuver and dig in a supersized sandbox filled with a crushed material that has characteristics similar to lunar soil. For more information, visit www.nasa.gov/lunabotics. Photo credit: NASA/Frankie Martin
- Record ID
- KSC-2012-2974
- NASA center
- KSC
- Date
- 2012-05-23
- Keywords
- Lunabotics, mining, lunar, soil
KSC · 2018-01-11 · KSC-20180111-PH_FWM01_0025
KSC All Hands
Mic Woltman, chief of the Fleet Systems Integration Branch of NASA's Launch Services Program, speaks to Kennedy Space Center employees about plans for the coming year. The event…
Inspect NASA record
Mic Woltman, chief of the Fleet Systems Integration Branch of NASA's Launch Services Program, speaks to Kennedy Space Center employees about plans for the coming year. The event took place in the Lunar Theater at the Kennedy Space Center Visitor Complex’s Apollo Saturn V Center. The year will be highlighted with NASA's partners preparing test flights for crewed missions to the International Space Station as part of the agency's Commercial Crew Program and six launches by the Launch Services Program. Exploration Ground Systems will be completing facilities to support the Space Launch System rocket and Orion spacecraft. Exploration Research and Technology Programs will continue to provide supplies to the space station launched as part of the Commercial Resupply Services effort.
- Record ID
- KSC-20180111-PH_FWM01_0025
- NASA center
- KSC
- Date
- 2018-01-11
- Credit
- NASA/ Frank Michaux
- Keywords
- Kennedy Space Center, Center Director, Launch Services Program, LSP, Commercial Crew Program, CCP, Exploration Ground Systems, EGS, Exploration Research and Technology
KSC · 2026-06-10 · KSC-20260610-PH-GEB01_0206
Artemis III Launch Simulation #2 - Cryo Sim
Artemis III launch team members participate in a cryogenic propellant loading simulation on Wednesday, June 10, 2026, inside Firing Room 1 and 2 of the Rocco A. Petrone…
Inspect NASA record
Artemis III launch team members participate in a cryogenic propellant loading simulation on Wednesday, June 10, 2026, inside Firing Room 1 and 2 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. Members of NASA’s Exploration Ground Systems team rehearse the steps to load the super-cooled liquid hydrogen and liquid oxygen into the SLS (Space Launch System) rocket core stage, a process that starts several hours before liftoff for the Artemis III mission. Artemis III will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.
- Record ID
- KSC-20260610-PH-GEB01_0206
- NASA center
- KSC
- Date
- 2026-06-10
- Credit
- NASA/Glenn Benson
- Keywords
- Artemis, Artemis launch team, Artemis 3, Artemis III, Kennedy Space Center, LCC, Launch Control Center, Firing Room 1 and 2
KSC · 2021-08-12 · KSC-20210812-PH-KLS02_0018
OSA STA and Umbilicals
Seen here is a close-up view of the Orion stage adapter (OSA) structural test article atop the Space Launch System (SLS) rocket inside the Vehicle Assembly Building (VAB)…
Inspect NASA record
Seen here is a close-up view of the Orion stage adapter (OSA) structural test article atop the Space Launch System (SLS) rocket inside the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on Aug. 12, 2021. The test article, representing the mass and weight of the actual flight hardware, is being used for various tests inside the VAB ahead of OSA stacking operations. The first in an increasingly complex set of missions, Artemis I will test SLS and the Orion spacecraft as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will send the first woman and the first person of color to the lunar surface, as well as establish a sustainable presence on and around the Moon.
- Record ID
- KSC-20210812-PH-KLS02_0018
- NASA center
- KSC
- Date
- 2021-08-12
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis, Artemis I, OSA, Orion, SLS, STA, VAB
KSC · 2022-11-22 · KSC-20221122-PH-CSH01_0026
MSolo PRIME-1 Mass Properties Test
Engineers conduct a mass properties test on the Mass Spectrometer Observing Lunar Operations (MSolo) instrument inside Kennedy Space Center’s Space Station Processing Facility in Florida on Nov. 22,…
Inspect NASA record
Engineers conduct a mass properties test on the Mass Spectrometer Observing Lunar Operations (MSolo) instrument inside Kennedy Space Center’s Space Station Processing Facility in Florida on Nov. 22, 2022. Mass properties determines the mass and center of gravity of the flight unit. The lander uses this information, from all payloads, to improve stability and performance of the lander – and to a lesser degree, the stability and performance of the rocket. This marks the end of testing at Kennedy for the Polar Resources Ice Mining Experiment-1 (PRIME-1) MSolo instrument. It will soon be shipped to Intuitive Machines in Houston for integration on the NOVA-C landing platform. Launching in 2023, the PRIME-1 mission will be the first in-situ resource utilization demonstration on the Moon.
- Record ID
- KSC-20221122-PH-CSH01_0026
- NASA center
- KSC
- Date
- 2022-11-22
- Credit
- NASA/Cory Huston
- Keywords
- CLPS, IM-2, MLI, Moon to Mars, Msolo, NASA Tech, PRIME-1
KSC · 2023-08-07 · KSC-20230807-PH-KLS01_0325
Artemis II Crew with EGS
Artemis II NASA astronaut Christina Koch greets members of the Artemis launch team inside Firing Room 1 in the Launch Control at NASA’s Kennedy Space Center in Florida…
Inspect NASA record
Artemis II NASA astronaut Christina Koch greets members of the Artemis launch team inside Firing Room 1 in the Launch Control at NASA’s Kennedy Space Center in Florida on Aug. 7, 2023. Koch and fellow Artemis II astronauts Victor Glover, Reid Wiseman, and CSA (Canadian Space Agency) astronaut Jeremy Hansen are at the center to meet workers and tour facilities. The approximately 10-day Artemis II flight will test NASA’s foundational human deep space exploration capabilities, the Space Launch System rocket and Orion spacecraft, for the first time with astronauts and will pave the way for lunar surface missions, including landing the first woman and the first person of color on the Moon.
- Record ID
- KSC-20230807-PH-KLS01_0325
- NASA center
- KSC
- Date
- 2023-08-07
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis II, Artemis II crew, Astronauts, EGS, Exploration Ground Systems, KSC, Kennedy Space Center
KSC · 2022-03-21 · KSC-20220321-PH-JBS01_0085
Artemis I at Pad 39B - Sunrise
A sunrise view of the Artemis I Space Launch System (SLS) and Orion spacecraft at Launch Pad 39B at NASA’s Kennedy Space Center in Florida on March 21,…
Inspect NASA record
A sunrise view of the Artemis I Space Launch System (SLS) and Orion spacecraft at Launch Pad 39B at NASA’s Kennedy Space Center in Florida on March 21, 2022. The SLS and Orion atop the mobile launcher were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220321-PH-JBS01_0085
- NASA center
- KSC
- Date
- 2022-03-21
- Credit
- NASA/Ben Smegelsky
- Keywords
- Artemis I, Kennedy Space Center, Pad 39B, Rollout, VAB, Wet Dress Rehearsal
KSC · 2010-05-27 · 2010-3613
KSC-2010-3613
CAPE CANAVERAL, Fla. - University students gather for the opening ceremony of NASA's first Lunabotics Mining Competition at the Kennedy Space Center Visitor Complex's Astronaut Hall of Fame.…
Inspect NASA record
CAPE CANAVERAL, Fla. - University students gather for the opening ceremony of NASA's first Lunabotics Mining Competition at the Kennedy Space Center Visitor Complex's Astronaut Hall of Fame. Twenty-two teams from around the country will maneuver their remote controlled or autonomous excavators, called lunabots, in about 60 tons of ultra-fine simulated lunar soil, called BP-1. The competition is an Exploration Systems Mission Directorate project managed by Kennedy's Education Division. The purpose is to engage and retain students in science, technology, engineering and mathematics, or STEM, fields. It also provides a competitive environment that could result in innovative ideas and solutions for NASA's future excavation of the moon. Photo credit: NASA_Dimitri Gerondidakis
- Record ID
- 2010-3613
- NASA center
- KSC
- Date
- 2010-05-27
- Credit
- NASA_Dimitri Gerondidakis
- Keywords
- ESMD
KSC · 2026-06-11 · KSC-20260611-PH-GEB01_0040
Artemis III Launch Simulation, Terminal Count Sim
Artemis Launch Director Charlie Blackwell-Thompson smiles for a photograph inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida…
Inspect NASA record
Artemis Launch Director Charlie Blackwell-Thompson smiles for a photograph inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida on Thursday, June 11, 2026, during a terminal countdown simulation for the Artemis III mission. The terminal count simulation conducted by NASA’s Exploration Ground Systems team runs through the final five hours of launch countdown, including terminal count - the remaining 10 minutes of the countdown. Artemis III will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.
- Record ID
- KSC-20260611-PH-GEB01_0040
- NASA center
- KSC
- Date
- 2026-06-11
- Credit
- NASA/Glenn Benson
- Keywords
- Artemis, Artemis 3, Artemis III, Artemis launch team, EGS, Exploration Ground Systems, Firing Room 1, Firing Room 2, LCC, Launch Control Center, launch simulation, John. F. Kennedy Space Center
KSC · 2022-01-10 · KSC-20220110-PH-CSH01_0063
Employees working on Artemis I SLS Flight Hardware
In view high up in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, is the Artemis I Orion spacecraft enclosed in…
Inspect NASA record
In view high up in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, is the Artemis I Orion spacecraft enclosed in its launch abort system atop the Space Launch System on Jan 10, 2022. A work platform has been extended around Orion. Artemis I will be the first integrated test of NASA’s deep space exploration systems: the Orion spacecraft, Space Launch System (SLS) rocket and the ground systems at Kennedy. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220110-PH-CSH01_0063
- NASA center
- KSC
- Date
- 2022-01-10
- Credit
- NASA/Cory Huston
- Keywords
- Artemis, Artemis I, Orion, Space Launch System, SLS, Vehicle Assembly Building, VAB, High Bay 3, Kennedy Space Center, KSC