Interstellar Minds

‹ Interstellar Minds

Update Site (from NASA)

Explore NASA’s Image and Video Library.

Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.

Sign in to suggest a Marvel.

Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.

NASA image records

Saturn Apollo Program

MSFC · 1963-12-01 · 6335341

Saturn Apollo Program

The test laboratory of the Marshall Space Flight Center (MSFC) tested the F-1 engine, the most powerful rocket engine ever fired at MSFC. The engine was tested on…

Inspect NASA record

The test laboratory of the Marshall Space Flight Center (MSFC) tested the F-1 engine, the most powerful rocket engine ever fired at MSFC. The engine was tested on the newly modified Saturn IB static test stand that had been used for three years to test the Saturn I eight-engine booster, S-I (first) stage. In 1961, the test stand was modified to permit static firing of the S-I/S-IB stage and the name of the stand was then changed to the S-IB Static Test Stand. Producing a combined thrust of 7,500,000 pounds, five F-1 engines powered the S-IC (first) stage of the Saturn V vehicle for the marned lunar mission.

Record ID
6335341
NASA center
MSFC
Date
1963-12-01
Keywords
F-1 Engine, S-IB Static Test Stand
Artemis I WDR Pre-Rollout Activities - Beauty Shots

KSC · 2022-03-17 · KSC-20220317-PH-KLS01_0051

Artemis I WDR Pre-Rollout Activities - Beauty Shots

In this view looking down in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the Artemis I Space Launch System (SLS)…

Inspect NASA record

In this view looking down in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the Artemis I Space Launch System (SLS) and Orion spacecraft can be seen without any work platforms surrounding them on March 17, 2022. The Artemis I stack atop the mobile launcher will roll out to Launch Complex 39B atop the crawler-transporter 2 for a wet dress rehearsal ahead of launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220317-PH-KLS01_0051
NASA center
KSC
Date
2022-03-17
Credit
NASA/Kim Shiflett
Keywords
Artemis, Artemis I, EGS, KSC, ML, Orion, SLS, VAB, WDR, rollout, wet dress rehearsal
Moonikin "Campos" in Artemis I Crew Module

KSC · 2022-08-03 · KSC-20220803-PH-FMX01_0044

Moonikin "Campos" in Artemis I Crew Module

A close-up view of Moonikin “Campos” secured in a seat inside the Artemis I Orion crew module atop the Space Launch System rocket in High Bay 3 of…

Inspect NASA record

A close-up view of Moonikin “Campos” secured in a seat inside the Artemis I Orion crew module atop the Space Launch System rocket in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Aug. 3, 2022. Artemis I will provide a foundation for human deep space exploration and demonstrate NASA’s capability to extend human present to the Moon and beyond. The primary goal of Artemis I is to thoroughly test the Space Launch System rocket and Orion spacecraft’s integrated systems before crewed missions. Under Artemis, NASA aims to land the first woman and first person of color on the Moon and establish sustainable lunar exploration.

Record ID
KSC-20220803-PH-FMX01_0044
NASA center
KSC
Date
2022-08-03
Credit
NASA/Frank Michaux
Keywords
Artemis, Artemis I, DLR, MARES, Moonikin, Orion, SLS, Space Launch System, crew module
Artemis III Cryo Sim in LCC Firing Rooms 1 and 2

KSC · 2026-10-14 · KSC-20261014-PH-JLS01_0171

Artemis III Cryo Sim in LCC Firing Rooms 1 and 2

Artemis III launch team members participate in a cryogenic propellant loading simulation on Wednesday, Oct. 14, 2026, inside Firing Rooms 1 and 2 of the Rocco A. Petrone…

Inspect NASA record

Artemis III launch team members participate in a cryogenic propellant loading simulation on Wednesday, Oct. 14, 2026, inside Firing Rooms 1 and 2 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. Members of NASA’s Exploration Ground Systems team rehearse the steps to load the super-cooled liquid hydrogen and liquid oxygen into the SLS (Space Launch System) rocket core stage, a process that starts several hours before liftoff for the Artemis III mission. Artemis III will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.

Record ID
KSC-20261014-PH-JLS01_0171
NASA center
KSC
Date
2026-10-14
Credit
NASA/Jonathan Shaban
Keywords
Artemis, Artemis 3, Artemis III, Firing Room 1, Firing Room 2, Launch Control Center, LCC, Kennedy Space Center, EGS, Exploration Ground Systems, Artemis launch team, launch simulations
Artemis I at Pad 39B

KSC · 2022-04-21 · KSC-20220421-PH-JBS01_0155

Artemis I at Pad 39B

A view of the Artemis I Space Launch System (SLS) and Orion spacecraft atop the mobile launcher on Launch Pad 39B at NASA’s Kennedy Space Center in Florida…

Inspect NASA record

A view of the Artemis I Space Launch System (SLS) and Orion spacecraft atop the mobile launcher on Launch Pad 39B at NASA’s Kennedy Space Center in Florida on April 21, 2022. Also in view are the three lightning protection towers. The SLS and Orion atop the mobile launcher were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In future Artemis missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220421-PH-JBS01_0155
NASA center
KSC
Date
2022-04-21
Credit
NASA/Ben Smegelsky
Keywords
Artemis, Artemis I, KSC, Kennedy Space Center, Launch Complex 39B, Launch Pad 39B, Moon to Mars, Orion, Pad 39B, SLS, Space Launch System
Moon to Mars Fiscal Year 2020 Budget Proposal

KSC · 2019-03-11 · KSC-20190311-PH_KLS01_0162

Moon to Mars Fiscal Year 2020 Budget Proposal

NASA Administrator Jim Bridenstine speaks to NASA workers across the nation and members of the news media, during a Moon to Mars event in the Neil Armstrong Operations…

Inspect NASA record

NASA Administrator Jim Bridenstine speaks to NASA workers across the nation and members of the news media, during a Moon to Mars event in the Neil Armstrong Operations and Checkout Building high bay on March 11, 2019. Behind him is the Orion crew module for Exploration Mission-2. The event followed the delivery of President Trump’s fiscal year 2020 budget proposal to U.S. Congress, which includes funding for the agency’s Moon to Mars initiative and Gateway lunar outpost. Bridenstine presented a closer look at America’s work to return astronauts to the Moon in a sustainable way and continue exploration to Mars.

Record ID
KSC-20190311-PH_KLS01_0162
NASA center
KSC
Date
2019-03-11
Credit
NASA/Kim Shiflett
Keywords
Moon to Mars, Exploration, Gateway, O&C, Neil Armstrong Operations and Checkout Building, Orion, NASA 2020 Budget
Orion Transport to VAB

KSC · 2021-10-19 · KSC-20211019-PH-ILW01_0212

Orion Transport to VAB

The Orion spacecraft for NASA’s Artemis I mission, fully assembled with its launch abort system, is moved into the transfer aisle of the Vehicle Assembly Building (VAB) at…

Inspect NASA record

The Orion spacecraft for NASA’s Artemis I mission, fully assembled with its launch abort system, is moved into the transfer aisle of the Vehicle Assembly Building (VAB) at Kennedy Space Center in Florida on Oct. 19, 2021. In the VAB, Orion will join the already stacked flight hardware and be raised into position atop the Space Launch System rocket in High Bay 3. Launching in 2021, Artemis I will be an uncrewed test flight of the Orion spacecraft and Space Launch System rocket as an integrated system ahead of crewed flights to the Moon. Under Artemis, NASA aims to land the first woman and first person of color on the Moon and establish sustainable lunar exploration.

Record ID
KSC-20211019-PH-ILW01_0212
NASA center
KSC
Date
2021-10-19
Credit
NASA/Isaac Watson
Keywords
Artemis, Artemis I, EGS, Exploration Ground System, KSC, Kennedy Space Center, LASF, Launch Abort System Facility, Moon to Mars, NASA, Orion, SLS
Crawler Transporter 2 Roll to VAB for Artemis I WDR Rollout

KSC · 2022-06-01 · KSC-20220601-PH-KLS01_0019

Crawler Transporter 2 Roll to VAB for Artemis I WDR Rollout

Engineers and technicians drive crawler-transporter 2 along the crawlerway toward the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on June 1, 2022. The crawler…

Inspect NASA record

Engineers and technicians drive crawler-transporter 2 along the crawlerway toward the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on June 1, 2022. The crawler will go inside the VAB, where it will slide under the Artemis I Space Launch System with the Orion spacecraft atop on the mobile launcher and carry it to Launch Complex 39B for a wet dress rehearsal test ahead of the Artemis I launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220601-PH-KLS01_0019
NASA center
KSC
Date
2022-06-01
Credit
NASA/Kim Shiflett
Keywords
Artemis, Artemis I, CT-2, Crawler-Transporter 2, KSC, Orion, SLS, VAB, Vehicle Assembly Building
Crawler Transporter 2 Roll to VAB for Artemis I WDR Rollout

KSC · 2022-06-01 · KSC-20220601-PH-KLS01_0165

Crawler Transporter 2 Roll to VAB for Artemis I WDR Rollout

The crawler-transporter, driven by engineers, approaches the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on June 1, 2022. The crawler will go inside the…

Inspect NASA record

The crawler-transporter, driven by engineers, approaches the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on June 1, 2022. The crawler will go inside the VAB, where it will slide under the Artemis I Space Launch System with the Orion spacecraft atop on the mobile launcher and carry it to Launch Complex 39B for a wet dress rehearsal test ahead of the Artemis I launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220601-PH-KLS01_0165
NASA center
KSC
Date
2022-06-01
Credit
NASA/Kim Shiflett
Keywords
Artemis, Artemis I, CT-2, Crawler-Transporter 2, KSC, Orion, SLS, VAB, Vehicle Assembly Building
Biopolymer Research for In-Situ Capabilities

JSC · 2022-02-03 · jsc2022e042479

Biopolymer Research for In-Situ Capabilities

jsc2022e042479 (2/3/2022) --- This image shows three modules of flight hardware for the Biopolymer Research for In-Situ Capabilities investigation, launching aboard SpaceX’s 25th commercial resupply services mission to…

Inspect NASA record

jsc2022e042479 (2/3/2022) --- This image shows three modules of flight hardware for the Biopolymer Research for In-Situ Capabilities investigation, launching aboard SpaceX’s 25th commercial resupply services mission to the International Space Station. The hardware is 3D printed in gray PLA, a desiccant packet is epoxied in the center of the module, and a pressure and humidity sensor is fastened to the left. Each module makes two bricks, for a total of six bricks that will be made in space. This investigation studies how microgravity affects the process of creating biopolymer soil composite (BSC), a concrete alternative that could be made with on-site material such as lunar or Martian dust. Image curtsey of James Wall.

Record ID
jsc2022e042479
NASA center
JSC
Date
2022-02-03
Credit
James Wall
Crawler Transporter Roll to VAB for Artemis I WDR Rollout

KSC · 2022-03-11 · KSC-20220311-PH-KLS01_0209

Crawler Transporter Roll to VAB for Artemis I WDR Rollout

The crawler-transporter 2, driven by engineers and technicians, approaches the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on March 11, 2022. The crawler will…

Inspect NASA record

The crawler-transporter 2, driven by engineers and technicians, approaches the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on March 11, 2022. The crawler will go inside the VAB, where it will slide under the Artemis I Space Launch System with the Orion spacecraft atop on the mobile launcher and carry it to Launch Complex 39B for a wet dress rehearsal test ahead of the Artemis I launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars

Record ID
KSC-20220311-PH-KLS01_0209
NASA center
KSC
Date
2022-03-11
Credit
NASA/Kim Shiflett
Keywords
Artemis, Artemis I, EGS, KSC, ML, Orion, Rollout, SLS, VAB, WDR, Wet Dress Rehearsal
Crawler Transporter 2 Roll to VAB for Artemis I WDR Rollout

KSC · 2022-06-01 · KSC-20220601-PH-KLS01_0034

Crawler Transporter 2 Roll to VAB for Artemis I WDR Rollout

The sun reflects off the cab as engineers and technicians drive crawler-transporter 2 along the crawlerway toward the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in…

Inspect NASA record

The sun reflects off the cab as engineers and technicians drive crawler-transporter 2 along the crawlerway toward the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on June 1, 2022. The crawler will go inside the VAB, where it will slide under the Artemis I Space Launch System with the Orion spacecraft atop on the mobile launcher and carry it to Launch Complex 39B for a wet dress rehearsal test ahead of the Artemis I launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220601-PH-KLS01_0034
NASA center
KSC
Date
2022-06-01
Credit
NASA/Kim Shiflett
Keywords
Artemis, Artemis I, CT-2, Crawler-Transporter 2, KSC, Orion, SLS, VAB, Vehicle Assembly Building