Update Site (from NASA)
Explore NASA’s Image and Video Library.
Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.
Sign in to suggest a Marvel.
Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.
NASA image records
HQ · 2024-04-09 · NHQ202404090001
NASA, Japan Sign Agreement for Artemis Pressurized Rover
NASA Administrator Bill Nelson, left, and Japan’s Minister of Education, Culture, Sports, Science and Technology Masahito Moriyama, pose for a photograph prior to signing an historic agreement between…
Inspect NASA record
NASA Administrator Bill Nelson, left, and Japan’s Minister of Education, Culture, Sports, Science and Technology Masahito Moriyama, pose for a photograph prior to signing an historic agreement between the United States and Japan to advance sustainable human exploration of the Moon, Tuesday, April 9, 2024, at the NASA Headquarters Mary W. Jackson Building in Washington. Under the agreement, Japan will design, develop, and operate a pressurized rover for crewed and uncrewed exploration on the Moon. NASA will provide the launch and delivery of the rover to the Moon as well as two Japanese astronaut missions to the lunar surface. Photo Credit: (NASA/Bill Ingalls)
- Record ID
- NHQ202404090001
- NASA center
- HQ
- Date
- 2024-04-09
- Credit
- NASA/Bill Ingalls
- Keywords
- Bill Nelson, DC, Mary W. Jackson NASA Headquarters, Masahito Moriyama, NASA Administrator, Washington
KSC · 2022-04-21 · KSC-20220421-PH-JBS01_0058
Artemis I at Pad 39B
A view of the Artemis I Space Launch System (SLS) and Orion spacecraft on Launch Pad 39B at NASA’s Kennedy Space Center in Florida on April 21, 2022.…
Inspect NASA record
A view of the Artemis I Space Launch System (SLS) and Orion spacecraft on Launch Pad 39B at NASA’s Kennedy Space Center in Florida on April 21, 2022. Also in view are two of the three lightning protection towers and the water tower. The SLS and Orion atop the mobile launcher were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In future Artemis missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220421-PH-JBS01_0058
- NASA center
- KSC
- Date
- 2022-04-21
- Credit
- NASA/Ben Smegelsky
- Keywords
- Artemis, Artemis I, KSC, Kennedy Space Center, Launch Complex 39B, Launch Pad 39B, Moon to Mars, Orion, Pad 39B, SLS, Space Launch System
KSC · 2023-08-07 · KSC-20230807-PH-KLS01_0278
Artemis II Crew with EGS
Artemis launch team members listen to Artemis II astronauts during their visit to Firing Room 1 in the Launch Control Center at NASA’s Kennedy Space Center in Florida…
Inspect NASA record
Artemis launch team members listen to Artemis II astronauts during their visit to Firing Room 1 in the Launch Control Center at NASA’s Kennedy Space Center in Florida on Aug. 7, 2023. Artemis II NASA astronauts Victor Glover, Christina Koch, and Reid Wiseman, and CSA (Canadian Space Agency) astronaut Jeremy Hansen are at the center to greet workers and tour facilities. The approximately 10-day Artemis II flight will test NASA’s foundational human deep space exploration capabilities, the Space Launch System rocket and Orion spacecraft, for the first time with astronauts and will pave the way for lunar surface missions, including landing the first woman and the first person of color on the Moon.
- Record ID
- KSC-20230807-PH-KLS01_0278
- NASA center
- KSC
- Date
- 2023-08-07
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis II, Artemis II crew, Astronauts, EGS, Exploration Ground Systems, KSC, Kennedy Space Center
KSC · 2022-01-10 · KSC-20220110-PH-CSH01_0039
Employees working on Artemis I SLS Flight Hardware
A close-up view of the Artemis I Space Launch System rocket inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on…
Inspect NASA record
A close-up view of the Artemis I Space Launch System rocket inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Jan. 10, 2022. In view are the left and right boosters. Artemis I will be the first integrated test of NASA’s deep space exploration systems: the Orion spacecraft, Space Launch System (SLS) rocket and the ground systems at Kennedy.. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220110-PH-CSH01_0039
- NASA center
- KSC
- Date
- 2022-01-10
- Credit
- NASA/Cory Huston
- Keywords
- Artemis, Artemis I, Orion, Space Launch System, SLS, Vehicle Assembly Building, VAB, High Bay 3, Kennedy Space Center, KSC
KSC · 2018-01-11 · KSC-20180111-PH_FWM01_0205
KSC All Hands
Kennedy Space Center Director Bob Cabana speaks to employees at the Florida spaceport about plans for the coming year. The event took place in the Lunar Theater at…
Inspect NASA record
Kennedy Space Center Director Bob Cabana speaks to employees at the Florida spaceport about plans for the coming year. The event took place in the Lunar Theater at the Kennedy Space Center Visitor Complex’s Apollo Saturn V Center. The year will be highlighted with NASA's partners preparing test flights for crewed missions to the International Space Station as part of the agency's Commercial Crew Program and six launches by the Launch Services Program. Exploration Ground Systems will be completing facilities to support the Space Launch System rocket and Orion spacecraft. Exploration Research and Technology Programs will continue to provide supplies to the space station launched as part of the Commercial Resupply Services effort.
- Record ID
- KSC-20180111-PH_FWM01_0205
- NASA center
- KSC
- Date
- 2018-01-11
- Credit
- NASA/ Frank Michaux
- Keywords
- Kennedy Space Center, Center Director, Launch Services Program, LSP, Commercial Crew Program, CCP, Exploration Ground Systems, EGS, Exploration Research and Technology
KSC · 2021-07-15 · KSC-20210715-PH-KLS02_0028
Victor Glover Tours VAB
NASA astronaut Victor Glover greets Kenneth McElroy, Launch Vehicle Processing Technician with Jacobs, inside Kennedy Space Center’s Vehicle Assembly Building on July 15, 2021. Glover got a close…
Inspect NASA record
NASA astronaut Victor Glover greets Kenneth McElroy, Launch Vehicle Processing Technician with Jacobs, inside Kennedy Space Center’s Vehicle Assembly Building on July 15, 2021. Glover got a close look at NASA’s Space Launch System (SLS) rocket that will power the Orion spacecraft on the Artemis I mission later this year. Artemis I will be a test of Orion and SLS as an integrated system ahead of crewed flights to the Moon. Under Artemis, NASA aims to land the first woman and first person of color on the Moon and establish long-term lunar exploration.
- Record ID
- KSC-20210715-PH-KLS02_0028
- NASA center
- KSC
- Date
- 2021-07-15
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis, O&C, Operations and Checkout Building, SLS, Space Launch System, VAB, Vehicle Assembly Building, Victor Glover
KSC · 2022-06-29 · KSC-20220630-PH-KLS01_0045
Artemis I Rocket Beauty Shots
A close-up view of the Artemis I Space Launch System (SLS) and Orion spacecraft atop the mobile launcher at Launch Pad 39B at NASA’s Kennedy Space Center in…
Inspect NASA record
A close-up view of the Artemis I Space Launch System (SLS) and Orion spacecraft atop the mobile launcher at Launch Pad 39B at NASA’s Kennedy Space Center in Florida on June 30, 2022. The SLS and Orion were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220630-PH-KLS01_0045
- NASA center
- KSC
- Date
- 2022-06-29
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis, Orion, SLS, Space Launch System, EGS, Exploration Ground System, Artemis I, Pad B, Pad 39B, Wet Dress Rehearsal, WDR
KSC · 2022-03-11 · KSC-20220311-PH-KLS01_0196
Crawler Transporter Roll to VAB for Artemis I WDR Rollout
In this aerial view, the crawler-transporter 2, driven by engineers and technicians, approaches the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on March 11,…
Inspect NASA record
In this aerial view, the crawler-transporter 2, driven by engineers and technicians, approaches the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on March 11, 2022. The crawler will go inside the VAB, where it will slide under the Artemis I Space Launch System with the Orion spacecraft atop on the mobile launcher and carry it to Launch Complex 39B for a wet dress rehearsal test ahead of the Artemis I launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220311-PH-KLS01_0196
- NASA center
- KSC
- Date
- 2022-03-11
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis, Artemis I, EGS, KSC, ML, Orion, Rollout, SLS, VAB, WDR, Wet Dress Rehearsal
KSC · 2026-10-14 · KSC-20261014-PH-JLS01_0012
Artemis III Cryo Sim in LCC Firing Rooms 1 and 2
Artemis III launch team members participate in a cryogenic propellant loading simulation on Wednesday, Oct. 14, 2026, inside Firing Rooms 1 and 2 of the Rocco A. Petrone…
Inspect NASA record
Artemis III launch team members participate in a cryogenic propellant loading simulation on Wednesday, Oct. 14, 2026, inside Firing Rooms 1 and 2 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. Members of NASA’s Exploration Ground Systems team rehearse the steps to load the super-cooled liquid hydrogen and liquid oxygen into the SLS (Space Launch System) rocket core stage, a process that starts several hours before liftoff for the Artemis III mission. Artemis III will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.
- Record ID
- KSC-20261014-PH-JLS01_0012
- NASA center
- KSC
- Date
- 2026-10-14
- Credit
- NASA/Jonathan Shaban
- Keywords
- Artemis, Artemis 3, Artemis III, Firing Room 1, Firing Room 2, Launch Control Center, LCC, Kennedy Space Center, EGS, Exploration Ground Systems, Artemis launch team, launch simulations
KSC · 2022-11-22 · KSC-20221122-PH-CSH01_0010
MSolo PRIME-1 Mass Properties Test
Engineers conduct a mass properties test on the Mass Spectrometer Observing Lunar Operations (MSolo) instrument inside Kennedy Space Center’s Space Station Processing Facility in Florida on Nov. 22,…
Inspect NASA record
Engineers conduct a mass properties test on the Mass Spectrometer Observing Lunar Operations (MSolo) instrument inside Kennedy Space Center’s Space Station Processing Facility in Florida on Nov. 22, 2022. Mass properties determines the mass and center of gravity of the flight unit. The lander uses this information, from all payloads, to improve stability and performance of the lander – and to a lesser degree, the stability and performance of the rocket. This marks the end of testing at Kennedy for the Polar Resources Ice Mining Experiment-1 (PRIME-1) MSolo instrument. It will soon be shipped to Intuitive Machines in Houston for integration on the NOVA-C landing platform. Launching in 2023, the PRIME-1 mission will be the first in-situ resource utilization demonstration on the Moon.
- Record ID
- KSC-20221122-PH-CSH01_0010
- NASA center
- KSC
- Date
- 2022-11-22
- Credit
- NASA/Cory Huston
- Keywords
- CLPS, IM-2, MLI, Moon to Mars, Msolo, NASA Tech, PRIME-1
KSC · 2026-10-23 · KSC-20261023-PH--CSH02--0014
Artemis Acceleration Press Conference
From left to right, NASA Deputy Press Secretary George Alderman; NASA Administrator Jared Isaacman; NASA Associate Administrator Amit Kshatriya; Jeremy Parsons, NASA’s Artemis program manager, participate in a…
Inspect NASA record
From left to right, NASA Deputy Press Secretary George Alderman; NASA Administrator Jared Isaacman; NASA Associate Administrator Amit Kshatriya; Jeremy Parsons, NASA’s Artemis program manager, participate in a news conference on Friday, Oct. 23, 2026, at the agency’s Kennedy Space Center in Florida. The briefing was to update media about NASA’s Artemis III mission that will send four astronauts to low Earth orbit in 2027 to test critical systems needed for future lunar landings, and how plans to return American astronauts to the Moon by 2028 are progressing.
- Record ID
- KSC-20261023-PH--CSH02--0014
- NASA center
- KSC
- Date
- 2026-10-23
- Credit
- NASA/Cory S Huston
- Keywords
- Acceleration, Artemis, Artemis III, Artemis IV, Kennedy Space Center, Moon, SLS, Space Launch System
KSC · 2022-04-21 · KSC-20220421-PH-JBS01_0104
Artemis I at Pad 39B
Crawler-transporter 2 (CT-2) makes its way along the crawlerway to Launch Complex 39B at NASA’s Kennedy Space Center in Florida on April 21, 2022. In view atop the…
Inspect NASA record
Crawler-transporter 2 (CT-2) makes its way along the crawlerway to Launch Complex 39B at NASA’s Kennedy Space Center in Florida on April 21, 2022. In view atop the mobile launcher on the pad are the Artemis I Space Launch System (SLS) and Orion spacecraft. The SLS and Orion atop the mobile launcher were transported to the pad on CT-2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In future Artemis missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220421-PH-JBS01_0104
- NASA center
- KSC
- Date
- 2022-04-21
- Credit
- NASA/Ben Smegelsky
- Keywords
- Artemis, Artemis I, KSC, Kennedy Space Center, Launch Complex 39B, Launch Pad 39B, Moon to Mars, Orion, Pad 39B, SLS, Space Launch System