Interstellar Minds

‹ Interstellar Minds

Update Site (from NASA)

Explore NASA’s Image and Video Library.

Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.

Sign in to suggest a Marvel.

Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.

NASA image records

Artemis III Orion Crew Module Mate to Service Module Mate

KSC · 2026-07-30 · KSC-20260730-PH-ALS01_0001

Artemis III Orion Crew Module Mate to Service Module Mate

Engineers prepare to connect the Orion crew and service modules for the Artemis III mission on Thursday, July 30, 2026, inside the Neil A. Armstrong Operations and Checkout…

Inspect NASA record

Engineers prepare to connect the Orion crew and service modules for the Artemis III mission on Thursday, July 30, 2026, inside the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida. With the crew and service modules integrated, the team will power up the combined crew and service module for the first time then begin altitude chamber testing, which will put the spacecraft through conditions as close as possible to the environment it will experience in low Earth orbit. Artemis III and the four-person crew will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.

Record ID
KSC-20260730-PH-ALS01_0001
NASA center
KSC
Date
2026-07-30
Credit
NASA/Amanda Stevenson
Keywords
John. F. Kennedy Space Center,  Kennedy, Kennedy Space Center, KSC, Spaceport, Cape Canaveral, NASA, rocket ranch, Florida, multi-user spaceport, premier spaceport, space coast
KSC-99pp0933

KSC · 1999-07-16 · KSC-99pp0933

KSC-99pp0933

KENNEDY SPACE CENTER, FLA. -- Former Apollo astronauts Edwin "Buzz" Aldrin (left) and Gene Cernan share stories about their missions for an audience attending an anniversary banquet honoring…

Inspect NASA record

KENNEDY SPACE CENTER, FLA. -- Former Apollo astronauts Edwin "Buzz" Aldrin (left) and Gene Cernan share stories about their missions for an audience attending an anniversary banquet honoring the Apollo program team, the people who made the entire lunar landing program possible. The banquet was held in the Apollo/Saturn V Center, part of the KSC Visitor Complex. This is the 30th anniversary of the Apollo 11 launch and moon landing, July 16 and July 20, 1969. Other guests at the banquet were astronauts Wally Schirra, Gene Cernan and Walt Cunningham. Neil Armstrong was the first man to walk on the moon; Gene Cernan was the last

Record ID
KSC-99pp0933
NASA center
KSC
Date
1999-07-16
Apollo 9 Crewmen - Arrival - USS Guadalcanal

JSC · 1969-03-13 · S69-20060

Apollo 9 Crewmen - Arrival - USS Guadalcanal

S69-20060 (13 March 1969) --- The Apollo 9 crewmen arrive aboard the USS Guadalcanal as they step from a helicopter to receive a red-carpet welcome. Two of the…

Inspect NASA record

S69-20060 (13 March 1969) --- The Apollo 9 crewmen arrive aboard the USS Guadalcanal as they step from a helicopter to receive a red-carpet welcome. Two of the crewmen salute the crowd of newsmen, Navy and NASA personnel gathered to greet them. Left to right, are astronauts Russell L. Schweickart, lunar module pilot; David R. Scott (in back), command module pilot; and James A. McDivitt, commander. Splashdown occurred at 12:00:53 p.m. (EST), March 13, 1969, only 4.5 nautical miles from the USS Guadalcanal, prime recovery ship, to conclude a successful 10-day Earth-orbital space mission.

Record ID
S69-20060
NASA center
JSC
Date
1969-03-13
Artemis I Rollout Astronaut Interviews

KSC · 2022-08-16 · KSC-20220816-PH-ILW01_0001

Artemis I Rollout Astronaut Interviews

NASA astronaut Stan Love visits the Kennedy Space Center Press Site on Tuesday, Aug. 16, 2022. Later in the day, NASA’s Space Launch System rocket, with the agency’s…

Inspect NASA record

NASA astronaut Stan Love visits the Kennedy Space Center Press Site on Tuesday, Aug. 16, 2022. Later in the day, NASA’s Space Launch System rocket, with the agency’s Orion spacecraft atop, will roll out from the Florida spaceport’s Vehicle assembly Building to Launch Complex 39B in preparation for the Artemis I launch – targeted for no earlier than Aug. 29. Artemis I will be the first integrated test of the SLS and Orion. In later missions, NASA will land the first woman and the first person of color on the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220816-PH-ILW01_0001
NASA center
KSC
Date
2022-08-16
Credit
NASA/Isaac Watson
Keywords
Artemis, Artemis I, Astronaut, EGS, Exploration Ground System, KSC, Kennedy Space Center, NASA, Pad 39B, SLS, Space Launch System, VAB
ksc-01pp-1175

KSC · 2001-06-19 · 01pp1175

ksc-01pp-1175

KENNEDY SPACE CENTER, Fla. -- At Launch Complex 17-B, Cape Canaveral Air Force Station, workers place a cover over the Microwave Anisotropy Probe (MAP) spacecraft. Launch of MAP…

Inspect NASA record

KENNEDY SPACE CENTER, Fla. -- At Launch Complex 17-B, Cape Canaveral Air Force Station, workers place a cover over the Microwave Anisotropy Probe (MAP) spacecraft. Launch of MAP via a Boeing Delta II rocket is scheduled for June 30. The launch will place MAP into a lunar-assisted trajectory to the Sun-Earth for a 27-month mission. The probe will measure small fluctuations in the temperature of the cosmic microwave background radiation to an accuracy of one millionth of a degree. These measurements should reveal the size, matter content, age, geometry and fate of the universe. They will also reveal the primordial structure that grew to form galaxies and will test ideas about the origins of these primordial structures

Record ID
01pp1175
NASA center
KSC
Date
2001-06-19
Credit
NASA or National Aeronautics and Space Administration
KSC-01pd-1176

KSC · 2001-06-19 · 01pd1176

KSC-01pd-1176

KENNEDY SPACE CENTER, Fla. -- Workers at Launch Complex 17-B, Cape Canaveral Air Force Station, place protective covers around the Microwave Anisotropy Probe (MAP) spacecraft. Launch of MAP…

Inspect NASA record

KENNEDY SPACE CENTER, Fla. -- Workers at Launch Complex 17-B, Cape Canaveral Air Force Station, place protective covers around the Microwave Anisotropy Probe (MAP) spacecraft. Launch of MAP via a Boeing Delta II rocket is scheduled for June 30. The launch will place MAP into a lunar-assisted trajectory to the Sun-Earth for a 27-month mission. The probe will measure small fluctuations in the temperature of the cosmic microwave background radiation to an accuracy of one millionth of a degree. These measurements should reveal the size, matter content, age, geometry and fate of the universe. They will also reveal the primordial structure that grew to form galaxies and will test ideas about the origins of these primordial structures

Record ID
01pd1176
NASA center
KSC
Date
2001-06-19
Credit
NASA or National Aeronautics and Space Administration
KSC-68PC-302

KSC · 1968-12-18 · KSC-68PC-302

KSC-68PC-302

CAPE CANAVERAL, Fla. – Apollo 9 astronauts, left to right, James McDivitt, David Scott and Russell Schweickart pause in front of the Apollo/Saturn V space vehicle that will…

Inspect NASA record

CAPE CANAVERAL, Fla. – Apollo 9 astronauts, left to right, James McDivitt, David Scott and Russell Schweickart pause in front of the Apollo/Saturn V space vehicle that will launch Apollo 8 space pilots Frank Borman, James Lovell and William Anders on a planned lunar orbital mission. The 363-foot-high space vehicle will lift off from the Kennedy Space Center's Launch Complex 39A. Gaseous liquid oxygen is venting from the vehicle's first stage during recent Countdown Demonstration Test. Photo credit: NASA

Record ID
KSC-68PC-302
NASA center
KSC
Date
1968-12-18
Artemis III Cryo Sim in LCC Firing Rooms 1 and 2

KSC · 2026-10-14 · KSC-20261014-PH-JLS01_0115

Artemis III Cryo Sim in LCC Firing Rooms 1 and 2

Charlie Blackwell-Thompson, Artemis launch director, participates in a cryogenic propellant loading simulation on Wednesday, Oct. 14, 2026, inside Firing Room 1 of the Rocco A. Petrone Launch Control…

Inspect NASA record

Charlie Blackwell-Thompson, Artemis launch director, participates in a cryogenic propellant loading simulation on Wednesday, Oct. 14, 2026, inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. Members of NASA’s Exploration Ground Systems team rehearse the steps to load the super-cooled liquid hydrogen and liquid oxygen into the SLS (Space Launch System) rocket core stage, a process that starts several hours before liftoff for the Artemis III mission. Artemis III will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.

Record ID
KSC-20261014-PH-JLS01_0115
NASA center
KSC
Date
2026-10-14
Credit
NASA/Jonathan Shaban
Keywords
Artemis, Artemis 3, Artemis III, Firing Room 1, Firing Room 2, Launch Control Center, LCC, Kennedy Space Center, EGS, Exploration Ground Systems, Artemis launch team, launch simulations
Crawler Transporter 2 Roll into VAB for Artemis I WDR Rollout &

KSC · 2022-06-03 · KSC-20220603-PH-GEB01_0045

Crawler Transporter 2 Roll into VAB for Artemis I WDR Rollout &

The crawler-transporter, driven by engineers, approaches the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on June 1, 2022. The crawler will go inside the…

Inspect NASA record

The crawler-transporter, driven by engineers, approaches the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on June 1, 2022. The crawler will go inside the VAB, where it will slide under the Artemis I Space Launch System with the Orion spacecraft atop on the mobile launcher and carry it to Launch Complex 39B for a wet dress rehearsal test ahead of the Artemis I launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220603-PH-GEB01_0045
NASA center
KSC
Date
2022-06-03
Credit
NASA/Glenn Benson
Keywords
Artemis, Artemis I, EGS, Exploration Ground System, KSC, Kennedy Space Center, Orion, Pad B, SLS, Space Launch System, VAB, rollout
Artemis III Launch Simulation #2 - Cryo Sim

KSC · 2026-06-10 · KSC-20260610-PH-GEB01_0118

Artemis III Launch Simulation #2 - Cryo Sim

Artemis III launch team members participate in a cryogenic propellant loading simulation on Wednesday, June 10, 2026, inside Firing Room 1 and 2 of the Rocco A. Petrone…

Inspect NASA record

Artemis III launch team members participate in a cryogenic propellant loading simulation on Wednesday, June 10, 2026, inside Firing Room 1 and 2 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. Members of NASA’s Exploration Ground Systems team rehearse the steps to load the super-cooled liquid hydrogen and liquid oxygen into the SLS (Space Launch System) rocket core stage, a process that starts several hours before liftoff for the Artemis III mission. Artemis III will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.

Record ID
KSC-20260610-PH-GEB01_0118
NASA center
KSC
Date
2026-06-10
Credit
NASA/Glenn Benson
Keywords
Artemis, Artemis launch team, Artemis 3, Artemis III, Kennedy Space Center, LCC, Launch Control Center, Firing Room 1 and 2
KSC-2012-3009

KSC · 2012-05-23 · KSC-2012-3009

KSC-2012-3009

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center Visitor Complex in Florida, Lunabotics UAM Team students from the Universidad Autonoma Metropolitano in Mexico transport their lunabot to…

Inspect NASA record

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center Visitor Complex in Florida, Lunabotics UAM Team students from the Universidad Autonoma Metropolitano in Mexico transport their lunabot to the Lunarena during NASA’s Lunabotics Mining Competition. The mining competition is sponsored by NASA Kennedy Space Center’s Education Office for the agency’s Exploration Systems Mission Directorate. Undergraduate and graduate students from more than 50 universities and colleges in the U.S. and other countries use their remote-controlled Lunabots to maneuver and dig in a supersized sandbox filled with a crushed material that has characteristics similar to lunar soil. For more information, visit www.nasa.gov/lunabotics. Photo credit: NASA/Frankie Martin

Record ID
KSC-2012-3009
NASA center
KSC
Date
2012-05-23
Keywords
Lunabotics, mining, lunar, soil
Artemis I WDR Rollout #2 - ML Elevator Shot

KSC · 2022-06-03 · KSC-20220603-PH-FMX01_0016

Artemis I WDR Rollout #2 - ML Elevator Shot

The crawler-transporter, driven by engineers, has moved underneath the Artemis I Space Launch System with the Orion spacecraft atop on the mobile launcher inside the Vehicle Assembly Building…

Inspect NASA record

The crawler-transporter, driven by engineers, has moved underneath the Artemis I Space Launch System with the Orion spacecraft atop on the mobile launcher inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on June 3, 2022. The crawler will carry the Artemis I stack to Launch Complex 39B for a wet dress rehearsal test ahead of the Artemis I launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220603-PH-FMX01_0016
NASA center
KSC
Date
2022-06-03
Credit
NASA/Frank Michaux
Keywords
Artemis, Artemis I, EGS, Exploration Ground Systems, KSC, Kennedy Space Center, NASA, Orion, Pad B, SLS, Space Launch System, VAB