Interstellar Minds

‹ Interstellar Minds

Update Site (from NASA)

Explore NASA’s Image and Video Library.

Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.

Sign in to suggest a Marvel.

Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.

NASA image records

Moon to Mars Fiscal Year 2020 Budget Proposal

KSC · 2019-03-11 · KSC-20190311-PH_KLS01_0106

Moon to Mars Fiscal Year 2020 Budget Proposal

NASA Administrator Jim Bridenstine, at the podium up front, speaks to NASA workers across the nation and members of the news media, during a Moon to Mars event…

Inspect NASA record

NASA Administrator Jim Bridenstine, at the podium up front, speaks to NASA workers across the nation and members of the news media, during a Moon to Mars event in the Neil Armstrong Operations and Checkout Building high bay on March 11, 2019. Behind him is the Orion crew module for Exploration Mission-2. The event followed the delivery of President Trump’s fiscal year 2020 budget proposal to U.S. Congress, which includes funding for the agency’s Moon to Mars initiative and Gateway lunar outpost. Bridenstine presented a closer look at America’s work to return astronauts to the Moon in a sustainable way and continue exploration to Mars.

Record ID
KSC-20190311-PH_KLS01_0106
NASA center
KSC
Date
2019-03-11
Credit
NASA/Kim Shiflett
Keywords
Moon to Mars, Exploration, Gateway, O&C, Neil Armstrong Operations and Checkout Building, Orion, NASA 2020 Budget
KSC-2013-3239

KSC · 2013-08-09 · KSC-2013-3239

KSC-2013-3239

CAPE CANAVERAL, Fla. – As seen on Google Maps, the massive F-1 engines of the Saturn V's first stage on display inside the Apollo/Saturn V Center at the…

Inspect NASA record

CAPE CANAVERAL, Fla. – As seen on Google Maps, the massive F-1 engines of the Saturn V's first stage on display inside the Apollo/Saturn V Center at the Kennedy Space Center Visitor Complex. Each engine stands 19 feet tall with a diameter of more than 12 feet. The five engines on the first stage produced 7.5 million pounds of thrust at liftoff. The Saturn V was used to launch NASA's Apollo missions to the moon which saw 12 astronauts land and work on the lunar surface. Google precisely mapped Kennedy Space Center and some of its historical facilities for the company's map page. Photo credit: Google/Wendy Wang

Record ID
KSC-2013-3239
NASA center
KSC
Date
2013-08-09
Keywords
Google, space shuttle
KSC-2012-2949

KSC · 2012-05-22 · KSC-2012-2949

KSC-2012-2949

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center Visitor Complex in Florida, college students prepare their custom lunabot for NASA’s Lunabotics Mining Competition. The mining competition is…

Inspect NASA record

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center Visitor Complex in Florida, college students prepare their custom lunabot for NASA’s Lunabotics Mining Competition. The mining competition is sponsored by NASA Kennedy Space Center’s Education Office for the agency’s Exploration Systems Mission Directorate. Undergraduate and graduate students from more than 50 universities and colleges in the U.S. and other countries use their remote-controlled Lunabots to maneuver and dig in a supersized sandbox filled with a crushed material that has characteristics similar to lunar soil. Photo credit: NASA/Frankie Martin

Record ID
KSC-2012-2949
NASA center
KSC
Date
2012-05-22
Keywords
lunabotics, mining, lunar, soil
Artemis I WDR Pre-Rollout Activities - Beauty Shots, All Platfor

KSC · 2022-03-16 · KSC-20220316-PH-GEB01_0078

Artemis I WDR Pre-Rollout Activities - Beauty Shots, All Platfor

In this view looking up in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, all of the work platforms that surround…

Inspect NASA record

In this view looking up in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, all of the work platforms that surround the Artemis I Space Launch System (SLS) and Orion spacecraft are fully retracted on March 16, 2022. The Artemis I stack atop the mobile launcher will roll out to Launch Complex 39B atop the crawler-transporter 2 for a wet dress rehearsal ahead of launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220316-PH-GEB01_0078
NASA center
KSC
Date
2022-03-16
Credit
NASA/Glenn Benson
Keywords
Artemis, Artemis I, EGS, KSC, ML, Orion, SLS, VAB, WDR, rollout, wet dress rehearsal
Artemis I WDR Pre-Rollout Activities - NASA Worm on SRBs

KSC · 2022-03-14 · KSC-20220314-PH-KLS01_0010

Artemis I WDR Pre-Rollout Activities - NASA Worm on SRBs

Inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, application of the NASA worm logo is complete on the second of…

Inspect NASA record

Inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, application of the NASA worm logo is complete on the second of two solid rocket boosters for the Artemis I Space Launch System on March 14, 2022. The SLS and Orion spacecraft are stacked in the high bay and ready for rollout to Launch Complex 39B for a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220314-PH-KLS01_0010
NASA center
KSC
Date
2022-03-14
Credit
NASA/Kim Shiflett
Keywords
Artemis, Artemis I, EGS, KSC, ML, Orion, Rollout, SLS, VAB, WDR, Wet Dress Rehearsal
Crawler Transporter 2 Roll to VAB for Artemis I WDR Rollout

KSC · 2022-06-01 · KSC-20220601-PH-KLS01_0070

Crawler Transporter 2 Roll to VAB for Artemis I WDR Rollout

Technicians check equipment on crawler-transporter 2 during its trip to the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on June 1, 2022. The crawler…

Inspect NASA record

Technicians check equipment on crawler-transporter 2 during its trip to the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on June 1, 2022. The crawler will go inside the VAB, where it will slide under the Artemis I Space Launch System with the Orion spacecraft atop on the mobile launcher and carry it to Launch Complex 39B for a wet dress rehearsal test ahead of the Artemis I launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220601-PH-KLS01_0070
NASA center
KSC
Date
2022-06-01
Credit
NASA/Kim Shiflett
Keywords
Artemis, Artemis I, CT-2, Crawler-Transporter 2, KSC, Orion, SLS, VAB, Vehicle Assembly Building
Moonikin "Campos" in Artemis I Crew Module

KSC · 2022-08-03 · KSC-20220803-PH-FMX01_0032

Moonikin "Campos" in Artemis I Crew Module

A view of Moonikin “Campos” secured in a seat inside the Artemis I Orion crew module atop the Space Launch System rocket in High Bay 3 of the…

Inspect NASA record

A view of Moonikin “Campos” secured in a seat inside the Artemis I Orion crew module atop the Space Launch System rocket in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Aug. 3, 2022. Artemis I will provide a foundation for human deep space exploration and demonstrate NASA’s capability to extend human present to the Moon and beyond. The primary goal of Artemis I is to thoroughly test the Space Launch System rocket and Orion spacecraft’s integrated systems before crewed missions. Under Artemis, NASA aims to land the first woman and first person of color on the Moon and establish sustainable lunar exploration.

Record ID
KSC-20220803-PH-FMX01_0032
NASA center
KSC
Date
2022-08-03
Credit
NASA/Frank Michaux
Keywords
Artemis, Artemis I, DLR, MARES, Moonikin, Orion, SLS, Space Launch System, crew module
Artemis I WDR Rollout #2 - ML Elevator Shot

KSC · 2022-06-03 · KSC-20220603-PH-FMX01_0021

Artemis I WDR Rollout #2 - ML Elevator Shot

The Artemis I Space Launch System with the Orion spacecraft atop are in view inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center…

Inspect NASA record

The Artemis I Space Launch System with the Orion spacecraft atop are in view inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on June 3, 2022. The crawler-transporter, driven by engineers, is positioned underneath the Artemis I stack atop the mobile launcher. The crawler will carry the stack to Launch Complex 39B for a wet dress rehearsal test ahead of the Artemis I launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220603-PH-FMX01_0021
NASA center
KSC
Date
2022-06-03
Credit
NASA/Frank Michaux
Keywords
Artemis, Artemis I, EGS, Exploration Ground Systems, KSC, Kennedy Space Center, NASA, Orion, Pad B, SLS, Space Launch System, VAB
KSC01pd1176

KSC · 2001-06-19 · KSC01pd1176

KSC01pd1176

KENNEDY SPACE CENTER, Fla. -- Workers at Launch Complex 17-B, Cape Canaveral Air Force Station, place protective covers around the Microwave Anisotropy Probe (MAP) spacecraft. Launch of MAP…

Inspect NASA record

KENNEDY SPACE CENTER, Fla. -- Workers at Launch Complex 17-B, Cape Canaveral Air Force Station, place protective covers around the Microwave Anisotropy Probe (MAP) spacecraft. Launch of MAP via a Boeing Delta II rocket is scheduled for June 30. The launch will place MAP into a lunar-assisted trajectory to the Sun-Earth for a 27-month mission. The probe will measure small fluctuations in the temperature of the cosmic microwave background radiation to an accuracy of one millionth of a degree. These measurements should reveal the size, matter content, age, geometry and fate of the universe. They will also reveal the primordial structure that grew to form galaxies and will test ideas about the origins of these primordial structures

Record ID
KSC01pd1176
NASA center
KSC
Date
2001-06-19
Apollo 9 Mission image - Command Module

JSC · 1969-03-03 · as09-24-3657

Apollo 9 Mission image - Command Module

High Oblique photograph (taken over New Mexico) of the Apollo 9 Command/Service Modules taken from the Lunar Module,"Spider",on the fifth day of the Apollo 9 earth-orbital mission. Docking…

Inspect NASA record

High Oblique photograph (taken over New Mexico) of the Apollo 9 Command/Service Modules taken from the Lunar Module,"Spider",on the fifth day of the Apollo 9 earth-orbital mission. Docking mechanism is visible in nose of the Command Module,"Gumdrop". Object jutting out from the Service Module aft bulkhead is the high-gain S-Band antenna. Film magazine was F, film type was SO-368 Ektachrome with 0.460 - 0.710 micrometers film / filter transmittance response and haze filter,80mm lens. Cloud cover over the Earth is 70%.

Record ID
as09-24-3657
NASA center
JSC
Date
1969-03-03
Keywords
Apollo, Apollo 9, Command Module, Apollo Spacecraft
Employees working on Artemis I SLS Flight Hardware

KSC · 2022-01-10 · KSC-20220110-PH-CSH01_0052

Employees working on Artemis I SLS Flight Hardware

A close-up view of the aft segment of one of the boosters for the Artemis I Space Launch System rocket inside High Bay 3 of the Vehicle Assembly…

Inspect NASA record

A close-up view of the aft segment of one of the boosters for the Artemis I Space Launch System rocket inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Jan. 10, 2022. Artemis I will be the first integrated test of NASA’s deep space exploration systems: the Orion spacecraft, Space Launch System (SLS) rocket and the ground systems at Kennedy.. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220110-PH-CSH01_0052
NASA center
KSC
Date
2022-01-10
Credit
NASA/Cory Huston
Keywords
Artemis, Artemis I, Orion, Space Launch System, SLS, Vehicle Assembly Building, VAB, High Bay 3, Kennedy Space Center, KSC
Apollo 13 crew recovery after splashdown

JSC · 1970-04-17 · S70-35645

Apollo 13 crew recovery after splashdown

S70-35645 (17 April 1970) --- Astronaut James A. Lovell Jr., commander, is hoisted aboard a helicopter from the USS Iwo Jima, prime recovery vessel for the mission. Lovell…

Inspect NASA record

S70-35645 (17 April 1970) --- Astronaut James A. Lovell Jr., commander, is hoisted aboard a helicopter from the USS Iwo Jima, prime recovery vessel for the mission. Lovell was the last of the three Apollo 13 crewmembers to egress the Command Module (CM) and the last to be lifted aboard the helicopter. He was preceded by astronauts John L. Swigert Jr., command module pilot; and Fred W. Haise Jr., lunar module pilot. The CM and a U.S. Navy underwater demolition team swimmer can be seen in the ocean background. Apollo 13 splashed down at 12:07:44 p.m. (CST), April 17, 1970.

Record ID
S70-35645
NASA center
JSC
Date
1970-04-17
Keywords
APOLLO 13, APOLLO PROJECT, APOLLO SPACECRAFT, ASTRONAUTS, COMMAND MODULES, DIVERS, EGRESS, LIFE RAFTS, NAVY, NETS, PACIFIC OCEAN, RECOVERY RESCUE OPERATIONS