Update Site (from NASA)
Explore NASA’s Image and Video Library.
Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.
Sign in to suggest a Marvel.
Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.
NASA image records
KSC · 2022-11-22 · KSC-20221122-PH-CSH01_0018
MSolo PRIME-1 Mass Properties Test
Engineers conduct a mass properties test on the Mass Spectrometer Observing Lunar Operations (MSolo) instrument inside Kennedy Space Center’s Space Station Processing Facility in Florida on Nov. 22,…
Inspect NASA record
Engineers conduct a mass properties test on the Mass Spectrometer Observing Lunar Operations (MSolo) instrument inside Kennedy Space Center’s Space Station Processing Facility in Florida on Nov. 22, 2022. Mass properties determines the mass and center of gravity of the flight unit. The lander uses this information, from all payloads, to improve stability and performance of the lander – and to a lesser degree, the stability and performance of the rocket. This marks the end of testing at Kennedy for the Polar Resources Ice Mining Experiment-1 (PRIME-1) MSolo instrument. It will soon be shipped to Intuitive Machines in Houston for integration on the NOVA-C landing platform. Launching in 2023, the PRIME-1 mission will be the first in-situ resource utilization demonstration on the Moon.
- Record ID
- KSC-20221122-PH-CSH01_0018
- NASA center
- KSC
- Date
- 2022-11-22
- Credit
- NASA/Cory Huston
- Keywords
- CLPS, IM-2, MLI, Moon to Mars, Msolo, NASA Tech, PRIME-1
KSC · 2022-06-03 · KSC-20220603-PH-GEB01_0243
Crawler Transporter 2 Roll into VAB for Artemis I WDR Rollout &
NASA’s Space Launch System and Orion spacecraft atop the mobile launcher are in view in High Bay 3 of the Vehicle Assembly Building at the agency’s Kennedy Space…
Inspect NASA record
NASA’s Space Launch System and Orion spacecraft atop the mobile launcher are in view in High Bay 3 of the Vehicle Assembly Building at the agency’s Kennedy Space Center in Florida on June 3, 2022. All of the work platforms have been retracted. The crawler-transporter, driven by engineers, is under the Artemis I stack atop the mobile launcher and will carry it to Launch Complex 39B for a wet dress rehearsal test ahead of the Artemis I launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220603-PH-GEB01_0243
- NASA center
- KSC
- Date
- 2022-06-03
- Credit
- NASA/Glenn Benson
- Keywords
- Artemis, Artemis I, EGS, Exploration Ground System, KSC, Kennedy Space Center, Orion, Pad B, SLS, Space Launch System, VAB, rollout
KSC · 2021-07-28 · KSC-20210728-PH-KLS01_0037
Coverage of NASA Administrator Visit
NASA Administrator Bill Nelson participates in an interview inside the Vehicle Assembly Building during a tour and visit to the agency’s Kennedy Space Center in Florida on July…
Inspect NASA record
NASA Administrator Bill Nelson participates in an interview inside the Vehicle Assembly Building during a tour and visit to the agency’s Kennedy Space Center in Florida on July 28, 2021. In view in the background is the massive core stage of the Space Launch System (SLS) rocket. The next components to be stacked on top of the rocket are the Orion stage adapter and the spacecraft as preparations for Artemis I continue. The first in an increasingly complex set of missions, Artemis I will test SLS and Orion as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will land the first woman and first person of color on the lunar surface, as well as establish a sustainable presence on and around the Moon.
- Record ID
- KSC-20210728-PH-KLS01_0037
- NASA center
- KSC
- Date
- 2021-07-28
- Credit
- NASA/Kim Shiflett
- Keywords
- Administrator, Administrator Bill Nelson, Bill Nelson, Bob Cabana, KSC, Kennedy Space Center, Pam Melroy, Tour, Visit
KSC · 2022-03-21 · KSC-20220321-PH-JBS01_0160
Artemis I at Pad 39B - Moon Visible
The Moon serves as a background for the Artemis I Space Launch System (SLS) and Orion spacecraft at Launch Pad 39B at NASA’s Kennedy Space Center in Florida…
Inspect NASA record
The Moon serves as a background for the Artemis I Space Launch System (SLS) and Orion spacecraft at Launch Pad 39B at NASA’s Kennedy Space Center in Florida on March 21, 2022. The SLS and Orion atop the mobile launcher were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220321-PH-JBS01_0160
- NASA center
- KSC
- Date
- 2022-03-21
- Credit
- NASA/Ben Smegelsky
- Keywords
- Artemis I, Kennedy Space Center, Pad 39B, Rollout, VAB, Wet Dress Rehearsal
KSC · 2012-05-23 · KSC-2012-2969
KSC-2012-2969
CAPE CANAVERAL, Fla. - At NASA’s Kennedy Space Center Visitor Complex in Florida, college students from California State University in Chico, prepare their custom lunabot, BEAR, for NASA’s…
Inspect NASA record
CAPE CANAVERAL, Fla. - At NASA’s Kennedy Space Center Visitor Complex in Florida, college students from California State University in Chico, prepare their custom lunabot, BEAR, for NASA’s Lunabotics Mining Competition. The mining competition is sponsored by NASA Kennedy Space Center’s Education Office for the agency’s Exploration Systems Mission Directorate. Undergraduate and graduate students from more than 50 universities and colleges in the U.S. and other countries use their remote-controlled Lunabots to maneuver and dig in a supersized sandbox filled with a crushed material that has characteristics similar to lunar soil. For more information, visit www.nasa.gov/lunabotics. Photo credit: NASA/Frankie Martin
- Record ID
- KSC-2012-2969
- NASA center
- KSC
- Date
- 2012-05-23
- Keywords
- Lunabotics, mining, lunar, soil
KSC · 2024-09-03 · KSC-20240903-PH-JBS01_0039
ESM-3 Arrival at KSC
The European Service Module 3 for NASA’s Artemis III mission arrives at Port Canaveral on Tuesday, Sept. 3, 2024, awaiting transportation to NASA’s Kennedy Space Center in Florida.…
Inspect NASA record
The European Service Module 3 for NASA’s Artemis III mission arrives at Port Canaveral on Tuesday, Sept. 3, 2024, awaiting transportation to NASA’s Kennedy Space Center in Florida. The European Service Module 3, which is assembled by Airbus in Bremen, Germany, traveled across the Atlantic Ocean by the ESA (European Space Agency) aboard the Canopee ship. The European Service Module 3 provides the spacecraft’s propulsion, thermal control, electrical power, and life support systems. Artemis III will send four astronauts to the lunar orbit where two crew members will spend a week near the South Pole of the Moon conducting new science.
- Record ID
- KSC-20240903-PH-JBS01_0039
- NASA center
- KSC
- Date
- 2024-09-03
- Credit
- NASA/Ben Smegelsky
- Keywords
- John. F. Kennedy Space Center, ¿Kennedy, Kennedy Space Center, KSC, Spaceport, Cape Canaveral, NASA, rocket ranch, Florida, multi-user spaceport, premier spaceport, space coast
KSC · 2023-08-07 · KSC-20230807-PH-KLS01_0305
Artemis II Crew with EGS
Artemis II astronauts visit the Artemis launch team inside Firing Room 1 in the Launch Control Center at NASA’s Kennedy Space Center in Florida on Aug. 7, 2023.…
Inspect NASA record
Artemis II astronauts visit the Artemis launch team inside Firing Room 1 in the Launch Control Center at NASA’s Kennedy Space Center in Florida on Aug. 7, 2023. In front, from left are NASA astronauts Victor Glover (partially hidden), Christina Koch, and Reid Wiseman, and CSA (Canadian Space Agency) astronaut Jeremy Hansen. The approximately 10-day Artemis II flight will test NASA’s foundational human deep space exploration capabilities, the Space Launch System rocket and Orion spacecraft, for the first time with astronauts and will pave the way for lunar surface missions, including landing the first woman and the first person of color on the Moon.
- Record ID
- KSC-20230807-PH-KLS01_0305
- NASA center
- KSC
- Date
- 2023-08-07
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis II, Artemis II crew, Astronauts, EGS, Exploration Ground Systems, KSC, Kennedy Space Center
KSC · 2022-04-21 · KSC-20220421-PH-JBS01_0123
Artemis I at Pad 39B
A close-up view of the Artemis I Orion spacecraft, secured inside the Launch Abort System atop the Space Launch System (SLS) on Launch Pad 39B at NASA’s Kennedy…
Inspect NASA record
A close-up view of the Artemis I Orion spacecraft, secured inside the Launch Abort System atop the Space Launch System (SLS) on Launch Pad 39B at NASA’s Kennedy Space Center in Florida on April 21, 2022. A portion of the mobile launcher and the crew access arm also is in view. The SLS and Orion atop the mobile launcher were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In future Artemis missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220421-PH-JBS01_0123
- NASA center
- KSC
- Date
- 2022-04-21
- Credit
- NASA/Ben Smegelsky
- Keywords
- Artemis, Artemis I, KSC, Kennedy Space Center, Launch Complex 39B, Launch Pad 39B, Moon to Mars, Orion, Pad 39B, SLS, Space Launch System
KSC · 2019-03-11 · KSC-20190311-PH_KLS01_0071
Moon to Mars Fiscal Year 2020 Budget Proposal
NASA Administrator Jim Bridenstine speaks to NASA workers across the nation and members of the news media, during a Moon to Mars event in the Neil Armstrong Operations…
Inspect NASA record
NASA Administrator Jim Bridenstine speaks to NASA workers across the nation and members of the news media, during a Moon to Mars event in the Neil Armstrong Operations and Checkout Building high bay on March 11, 2019. Behind him is the Orion crew module for Exploration Mission-2. The event followed the delivery of President Trump’s fiscal year 2020 budget proposal to U.S. Congress, which includes funding for the agency’s Moon to Mars initiative and Gateway lunar outpost. Bridenstine presented a closer look at America’s work to return astronauts to the Moon in a sustainable way and continue exploration to Mars.
- Record ID
- KSC-20190311-PH_KLS01_0071
- NASA center
- KSC
- Date
- 2019-03-11
- Credit
- NASA/Kim Shiflett
- Keywords
- Moon to Mars, Exploration, Gateway, O&C, Neil Armstrong Operations and Checkout Building, Orion, NASA 2020 Budget
KSC · 2026-06-10 · KSC-20260610-PH-GEB01_0200
Artemis III Launch Simulation #2 - Cryo Sim
Artemis III launch team members participate in a cryogenic propellant loading simulation on Wednesday, June 10, 2026, inside Firing Room 1 and 2 of the Rocco A. Petrone…
Inspect NASA record
Artemis III launch team members participate in a cryogenic propellant loading simulation on Wednesday, June 10, 2026, inside Firing Room 1 and 2 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. Members of NASA’s Exploration Ground Systems team rehearse the steps to load the super-cooled liquid hydrogen and liquid oxygen into the SLS (Space Launch System) rocket core stage, a process that starts several hours before liftoff for the Artemis III mission. Artemis III will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.
- Record ID
- KSC-20260610-PH-GEB01_0200
- NASA center
- KSC
- Date
- 2026-06-10
- Credit
- NASA/Glenn Benson
- Keywords
- Artemis, Artemis launch team, Artemis 3, Artemis III, Kennedy Space Center, LCC, Launch Control Center, Firing Room 1 and 2
KSC · 2022-03-16 · KSC-20220316-PH-GEB01_0030
Artemis I WDR Pre-Rollout Activities - Beauty Shots, All Platfor
In this view looking up in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, all of the work platforms that surround…
Inspect NASA record
In this view looking up in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, all of the work platforms that surround the Artemis I Space Launch System (SLS) and Orion spacecraft are fully retracted on March 16, 2022. The Artemis I stack atop the mobile launcher will roll out to Launch Complex 39B atop the crawler-transporter 2 for a wet dress rehearsal ahead of launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220316-PH-GEB01_0030
- NASA center
- KSC
- Date
- 2022-03-16
- Credit
- NASA/Glenn Benson
- Keywords
- Artemis, Artemis I, EGS, KSC, ML, Orion, SLS, VAB, WDR, rollout, wet dress rehearsal
JSC · 1969-05-26 · S69-21036
Navy Helicopter - Arrival - Recovery - Apollo X Astronauts - South Pacific Ocean
S69-21036 (26 May 1969) --- A Navy helicopter arrives to recover the Apollo 10 astronauts, seen entering a life raft, as their spacecraft floats in the South Pacific…
Inspect NASA record
S69-21036 (26 May 1969) --- A Navy helicopter arrives to recover the Apollo 10 astronauts, seen entering a life raft, as their spacecraft floats in the South Pacific immediately after touchdown. U.S. Navy underwater demolition team swimmers assist in the recovery operations. Already in the life raft are astronauts Thomas P. Stafford (left), commander, and John W. Young (right), command module pilot. Splashdown occurred at 11:53 a.m., May 26, 1969, about 400 miles east of American Samoa and about four miles from the recovery ship to conclude a successful eight-day lunar orbit mission. Note that in this photo the divers have attached a flotation collar to the spacecraft.
- Record ID
- S69-21036
- NASA center
- JSC
- Date
- 1969-05-26