Update Site (from NASA)
Explore NASA’s Image and Video Library.
Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.
Sign in to suggest a Marvel.
Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.
NASA image records
KSC · 2022-03-17 · KSC-20220317-PH-KLS01_0026
Artemis I WDR Pre-Rollout Activities - Beauty Shots
In this view looking down in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the Artemis I Space Launch System (SLS)…
Inspect NASA record
In this view looking down in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the Artemis I Space Launch System (SLS) and Orion spacecraft can be seen without any work platforms surrounding them on March 17, 2022. The Artemis I stack atop the mobile launcher will roll out to Launch Complex 39B atop the crawler-transporter 2 for a wet dress rehearsal ahead of launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220317-PH-KLS01_0026
- NASA center
- KSC
- Date
- 2022-03-17
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis, Artemis I, EGS, KSC, ML, Orion, SLS, VAB, WDR, rollout, wet dress rehearsal
KSC · 2022-03-24 · KSC-20220324-PH-JBS01_0050
Artemis I at Pad 39B - Sunrise
A view of the Artemis I Space Launch System (SLS) and Orion spacecraft on Launch Pad 39B during sunrise at NASA’s Kennedy Space Center in Florida on March…
Inspect NASA record
A view of the Artemis I Space Launch System (SLS) and Orion spacecraft on Launch Pad 39B during sunrise at NASA’s Kennedy Space Center in Florida on March 24, 2022. The SLS and Orion atop the mobile launcher were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220324-PH-JBS01_0050
- NASA center
- KSC
- Date
- 2022-03-24
- Credit
- NASA/Ben Smegelsky
- Keywords
- Kennedy Space Center, Artemis I, rollout, VAB, pad 39B, wet dress rehearsal
KSC · 2022-04-21 · KSC-20220421-PH-JBS01_0107
Artemis I at Pad 39B
A view of the Artemis I Space Launch System (SLS) and Orion spacecraft on Launch Pad 39B at NASA’s Kennedy Space Center in Florida on April 21, 2022.…
Inspect NASA record
A view of the Artemis I Space Launch System (SLS) and Orion spacecraft on Launch Pad 39B at NASA’s Kennedy Space Center in Florida on April 21, 2022. Also in view is one of three lightning protection towers. The SLS and Orion atop the mobile launcher were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In future Artemis missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220421-PH-JBS01_0107
- NASA center
- KSC
- Date
- 2022-04-21
- Credit
- NASA/Ben Smegelsky
- Keywords
- Artemis, Artemis I, KSC, Kennedy Space Center, Launch Complex 39B, Launch Pad 39B, Moon to Mars, Orion, Pad 39B, SLS, Space Launch System
KSC · 2022-04-21 · KSC-20220421-PH-JBS01_0174
Artemis I at Pad 39B
A view of the Artemis I Space Launch System (SLS) and Orion spacecraft atop the mobile launcher on Launch Pad 39B at NASA’s Kennedy Space Center in Florida…
Inspect NASA record
A view of the Artemis I Space Launch System (SLS) and Orion spacecraft atop the mobile launcher on Launch Pad 39B at NASA’s Kennedy Space Center in Florida on April 21, 2022. Also in view are the three lightning protection towers and water tower. The SLS and Orion atop the mobile launcher were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In future Artemis missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220421-PH-JBS01_0174
- NASA center
- KSC
- Date
- 2022-04-21
- Credit
- NASA/Ben Smegelsky
- Keywords
- Artemis, Artemis I, KSC, Kennedy Space Center, Launch Complex 39B, Launch Pad 39B, Moon to Mars, Orion, Pad 39B, SLS, Space Launch System
KSC · 2026-09-02 · KSC-20260902-PH-KLS01_0023
Artemis III Crew Visit to KSC, VAB, Prototype Lab, IOZ
NASA astronaut Randy Bresnik (left) and ESA (European Space Agency) astronaut Luca Parmitano view progress on the solid rocket booster integration in High Bay 3 inside the Vehicle…
Inspect NASA record
NASA astronaut Randy Bresnik (left) and ESA (European Space Agency) astronaut Luca Parmitano view progress on the solid rocket booster integration in High Bay 3 inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida on Wednesday, Sept. 2, 2026. Bresnik, Parmitano, as well as NASA astronauts Andre Douglas, Frank Rubio, and Bob Hines made the first visit to Kennedy by the entire crew and backup crew members of Artemis III. The mission will launch four crew members aboard the Orion spacecraft to carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.
- Record ID
- KSC-20260902-PH-KLS01_0023
- NASA center
- KSC
- Date
- 2026-09-02
- Credit
- NASA/Kim Shiflett
- Keywords
- John. F. Kennedy Space Center, Kennedy, Kennedy Space Center, KSC, Spaceport, Cape Canaveral, NASA, rocket ranch, Florida, multi-user spaceport, premier spaceport, space coast
KSC · 2022-08-03 · KSC-20220803-PH-FMX01_0031
Moonikin "Campos" in Artemis I Crew Module
A view of Moonikin “Campos” secured in a seat inside the Artemis I Orion crew module atop the Space Launch System rocket in High Bay 3 of the…
Inspect NASA record
A view of Moonikin “Campos” secured in a seat inside the Artemis I Orion crew module atop the Space Launch System rocket in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Aug. 3, 2022. Artemis I will provide a foundation for human deep space exploration and demonstrate NASA’s capability to extend human present to the Moon and beyond. The primary goal of Artemis I is to thoroughly test the Space Launch System rocket and Orion spacecraft’s integrated systems before crewed missions. Under Artemis, NASA aims to land the first woman and first person of color on the Moon and establish sustainable lunar exploration.
- Record ID
- KSC-20220803-PH-FMX01_0031
- NASA center
- KSC
- Date
- 2022-08-03
- Credit
- NASA/Frank Michaux
- Keywords
- Artemis, Artemis I, DLR, MARES, Moonikin, Orion, SLS, Space Launch System, crew module
KSC · 2018-01-11 · KSC-20180111-PH_FWM01_0188
KSC All Hands
Kennedy Space Center Director Bob Cabana speaks to employees at the Florida spaceport about plans for the coming year. The event took place in the Lunar Theater at…
Inspect NASA record
Kennedy Space Center Director Bob Cabana speaks to employees at the Florida spaceport about plans for the coming year. The event took place in the Lunar Theater at the Kennedy Space Center Visitor Complex’s Apollo Saturn V Center. The year will be highlighted with NASA's partners preparing test flights for crewed missions to the International Space Station as part of the agency's Commercial Crew Program and six launches by the Launch Services Program. Exploration Ground Systems will be completing facilities to support the Space Launch System rocket and Orion spacecraft. Exploration Research and Technology Programs will continue to provide supplies to the space station launched as part of the Commercial Resupply Services effort.
- Record ID
- KSC-20180111-PH_FWM01_0188
- NASA center
- KSC
- Date
- 2018-01-11
- Credit
- NASA/ Frank Michaux
- Keywords
- Kennedy Space Center, Center Director, Launch Services Program, LSP, Commercial Crew Program, CCP, Exploration Ground Systems, EGS, Exploration Research and Technology
KSC · 2018-05-30 · KSC-20180530-PH_JBS01_0044
Wreath Laying Ceremony for Alan Bean
Members of the news media assemble to cover a ceremony on Wednesday, May 30, 2018, during which a memorial wreath is placed in the Apollo-Saturn V Center of…
Inspect NASA record
Members of the news media assemble to cover a ceremony on Wednesday, May 30, 2018, during which a memorial wreath is placed in the Apollo-Saturn V Center of the Kennedy Space Center Visitor Complex honoring former NASA astronaut Alan Bean. In the background is a large mural of a painting by Alan Bean who became an accomplished artist after leaving NASA. Bean was the fourth person to walk on the Moon as lunar module pilot on Apollo 12 in November 1969. He went on to command the 59-day Skylab 3 mission in 1973. He died in Houston on May 26, 2018, at the age of 86.
- Record ID
- KSC-20180530-PH_JBS01_0044
- NASA center
- KSC
- Date
- 2018-05-30
- Credit
- NASA/Ben Smegelsky
- Keywords
- Alan Bean, Astronauts, Apollo, Skylab, Kennedy Space Center, KSC, Apollo-Saturn V Center
KSC · 2022-08-03 · KSC-20220803-PH-FMX01_0051
Moonikin "Campos" in Artemis I Crew Module
A close-up view of Moonikin “Campos” secured in a seat inside the Artemis I Orion crew module atop the Space Launch System rocket in High Bay 3 of…
Inspect NASA record
A close-up view of Moonikin “Campos” secured in a seat inside the Artemis I Orion crew module atop the Space Launch System rocket in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Aug. 3, 2022. Artemis I will provide a foundation for human deep space exploration and demonstrate NASA’s capability to extend human present to the Moon and beyond. The primary goal of Artemis I is to thoroughly test the Space Launch System rocket and Orion spacecraft’s integrated systems before crewed missions. Under Artemis, NASA aims to land the first woman and first person of color on the Moon and establish sustainable lunar exploration.
- Record ID
- KSC-20220803-PH-FMX01_0051
- NASA center
- KSC
- Date
- 2022-08-03
- Credit
- NASA/Frank Michaux
- Keywords
- Artemis, Artemis I, DLR, MARES, Moonikin, Orion, SLS, Space Launch System, crew module
KSC · 2022-03-15 · KSC-20220315-PH-KLS01_0071
Artemis I WDR Pre-Rollout Activities - Crawler Transporter Rolls
Engineers and technicians drive the crawler-transporter 2 under the Artemis I Space Launch System (SLS) with the Orion spacecraft atop on the mobile launcher inside the Vehicle Assembly…
Inspect NASA record
Engineers and technicians drive the crawler-transporter 2 under the Artemis I Space Launch System (SLS) with the Orion spacecraft atop on the mobile launcher inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on March 15, 2022. The crawler will carry the Artemis I stack to Launch Complex 39B for a wet dress rehearsal test ahead of launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220315-PH-KLS01_0071
- NASA center
- KSC
- Date
- 2022-03-15
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis, Artemis I, EGS, KSC, ML, Orion, SLS, VAB, WDR, rollout, wet dress rehearsal
KSC · 2022-06-03 · KSC-20220603-PH-GEB01_0219
Crawler Transporter 2 Roll into VAB for Artemis I WDR Rollout &
NASA’s Space Launch System and Orion spacecraft atop the mobile launcher are in view in High Bay 3 of the Vehicle Assembly Building at the agency’s Kennedy Space…
Inspect NASA record
NASA’s Space Launch System and Orion spacecraft atop the mobile launcher are in view in High Bay 3 of the Vehicle Assembly Building at the agency’s Kennedy Space Center in Florida on June 3, 2022. All of the work platforms have been retracted. The crawler-transporter, driven by engineers, is under the Artemis I stack atop the mobile launcher and will carry it to Launch Complex 39B for a wet dress rehearsal test ahead of the Artemis I launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220603-PH-GEB01_0219
- NASA center
- KSC
- Date
- 2022-06-03
- Credit
- NASA/Glenn Benson
- Keywords
- Artemis, Artemis I, EGS, Exploration Ground System, KSC, Kennedy Space Center, Orion, Pad B, SLS, Space Launch System, VAB, rollout
SSC · 2024-08-07 · SSC-20240807-s00810
Summer Interns Display NASA Stennis Work
NASA Stennis summer intern Jordan Thomas is shown with his presentation on the 2024 Sustainability Report for NASA Stennis during an Aug. 7 event hosted by the Office…
Inspect NASA record
NASA Stennis summer intern Jordan Thomas is shown with his presentation on the 2024 Sustainability Report for NASA Stennis during an Aug. 7 event hosted by the Office of STEM Engagement. Thomas, a student at the University of South Alabama in Mobile, worked with the NASA Stennis Center Operations Directorate. The poster symposium highlighted research topics, including propulsion test operations, lunar robotics, autonomous systems, STEM education, and more. NASA’s Office of STEM Engagement paid internships allow high school and college-level students to contribute to the agency’s mission to advance science, technology, aeronautics, and space exploration.
- Record ID
- SSC-20240807-s00810
- NASA center
- SSC
- Date
- 2024-08-07
- Credit
- Danny Nowlin