Interstellar Minds

‹ Interstellar Minds

Update Site (from NASA)

Explore NASA’s Image and Video Library.

Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.

Sign in to suggest a Marvel.

Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.

NASA image records

Orion Transport to VAB

KSC · 2021-10-19 · KSC-20211019-PH-ILW01_0043

Orion Transport to VAB

The Orion spacecraft for NASA’s Artemis I mission, fully assembled with its launch abort system, begins the move out of the Launch Abort System Facility at Kennedy Space…

Inspect NASA record

The Orion spacecraft for NASA’s Artemis I mission, fully assembled with its launch abort system, begins the move out of the Launch Abort System Facility at Kennedy Space Center in Florida on Oct. 19, 2021. Orion will be transported to the Vehicle Assembly Building where it will join the already stacked flight hardware and be raised into position atop the Space Launch System rocket in High Bay 3. Launching in 2021, Artemis I will be an uncrewed test flight of the Orion spacecraft and Space Launch System rocket as an integrated system ahead of crewed flights to the Moon. Under Artemis, NASA aims to land the first woman and first person of color on the Moon and establish sustainable lunar exploration.

Record ID
KSC-20211019-PH-ILW01_0043
NASA center
KSC
Date
2021-10-19
Credit
NASA/Isaac Watson
Keywords
Artemis, Artemis I, EGS, Exploration Ground System, KSC, Kennedy Space Center, LASF, Launch Abort System Facility, Moon to Mars, NASA, Orion, SLS
Artemis I at Pad 39B

KSC · 2022-04-21 · KSC-20220421-PH-JBS01_0008

Artemis I at Pad 39B

A view of the Artemis I Space Launch System (SLS) and Orion spacecraft on Launch Pad 39B at NASA’s Kennedy Space Center in Florida on April 21, 2022.…

Inspect NASA record

A view of the Artemis I Space Launch System (SLS) and Orion spacecraft on Launch Pad 39B at NASA’s Kennedy Space Center in Florida on April 21, 2022. The SLS and Orion atop the mobile launcher were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In future Artemis missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220421-PH-JBS01_0008
NASA center
KSC
Date
2022-04-21
Credit
NASA/Ben Smegelsky
Keywords
Artemis, Artemis I, KSC, Kennedy Space Center, Launch Complex 39B, Launch Pad 39B, Moon to Mars, Orion, Pad 39B, SLS, Space Launch System
Artemis III November Launch Sim

KSC · 2026-11-11 · KSC-20261110-PH-JLS01_0042

Artemis III November Launch Sim

Artemis launch team members participate in a launch countdown simulation for Artemis III on Tuesday, Nov. 10, 2026, inside Firing Room 1 of the Rocco A. Petrone Launch…

Inspect NASA record

Artemis launch team members participate in a launch countdown simulation for Artemis III on Tuesday, Nov. 10, 2026, inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. This marked the first long day simulation for the Artemis III mission where teams combined the cryogenic propellant loading and terminal count portions of the countdown. Artemis III will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.

Record ID
KSC-20261110-PH-JLS01_0042
NASA center
KSC
Date
2026-11-11
Credit
NASA/Jonathan Shaban
Keywords
Artemis 3, Artemis III, Artemis launch team, Firing Room 1, Firing Room 2, KSC, Kennedy Space Center, LCC, Launch Control Center, launch simulation
Space Symposium Media Briefing

HQ · 2021-08-23 · NHQ202108230023

Space Symposium Media Briefing

Justin Cyrus, CEO, Lunar Outpost of Golden, Colorado, left, Bradley Cheetham, CEO and president, Advanced Space of Westminster, Colorado, center, and Dr. Luis Zea, implementation project manager, BioServe…

Inspect NASA record

Justin Cyrus, CEO, Lunar Outpost of Golden, Colorado, left, Bradley Cheetham, CEO and president, Advanced Space of Westminster, Colorado, center, and Dr. Luis Zea, implementation project manager, BioServe Space Technologies, Smead Aerospace Engineering Sciences, University of Colorado Boulder, Monday, are seen during a media briefing where NASA Administrator Bill Nelson introduced the three local Colorado companies and university partners that help make NASA’s missions possible, Aug. 23, 2021, during the 36th Space Symposium in Colorado Springs, Colorado. Photo Credit: (NASA/Bill Ingalls)

Record ID
NHQ202108230023
NASA center
HQ
Date
2021-08-23
Credit
NASA/Bill Ingalls
Keywords
Bradley Cheetham, Broadmoor Hotel, Colorado, Colorado Springs, Justin Cyrus, Luis Zea, Space Symposium
Artemis I WDR Pre-Rollout Activities - Crawler Transporter Rolls

KSC · 2022-03-15 · KSC-20220315-PH-KLS01_0086

Artemis I WDR Pre-Rollout Activities - Crawler Transporter Rolls

Engineers and technicians drive the crawler-transporter 2 under the Artemis I Space Launch System (SLS) with the Orion spacecraft atop on the mobile launcher inside the Vehicle Assembly…

Inspect NASA record

Engineers and technicians drive the crawler-transporter 2 under the Artemis I Space Launch System (SLS) with the Orion spacecraft atop on the mobile launcher inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on March 15, 2022. The crawler will carry the Artemis I stack to Launch Complex 39B for a wet dress rehearsal test ahead of launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220315-PH-KLS01_0086
NASA center
KSC
Date
2022-03-15
Credit
NASA/Kim Shiflett
Keywords
Artemis, Artemis I, EGS, KSC, ML, Orion, SLS, VAB, WDR, rollout, wet dress rehearsal
Artemis I WDR Pre-Rollout Activities - Beauty Shots, All Platfor

KSC · 2022-03-16 · KSC-20220316-PH-GEB01_0038_

Artemis I WDR Pre-Rollout Activities - Beauty Shots, All Platfor

In this view looking up in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, all of the work platforms that surround…

Inspect NASA record

In this view looking up in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, all of the work platforms that surround the Artemis I Space Launch System (SLS) and Orion spacecraft are fully retracted on March 16, 2022. The Artemis I stack atop the mobile launcher will roll out to Launch Complex 39B atop the crawler-transporter 2 for a wet dress rehearsal ahead of launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220316-PH-GEB01_0038_
NASA center
KSC
Date
2022-03-16
Credit
NASA/Glenn Benson
Keywords
Artemis, Artemis I, EGS, KSC, ML, Orion, SLS, VAB, WDR, rollout, wet dress rehearsal
Artemis I at Pad 39B - Moon Visible

KSC · 2022-03-21 · KSC-20220321-PH-JBS01_0142

Artemis I at Pad 39B - Moon Visible

The Moon serves as a background for the Artemis I Space Launch System (SLS) and Orion spacecraft at Launch Pad 39B at NASA’s Kennedy Space Center in Florida…

Inspect NASA record

The Moon serves as a background for the Artemis I Space Launch System (SLS) and Orion spacecraft at Launch Pad 39B at NASA’s Kennedy Space Center in Florida on March 21, 2022. The SLS and Orion atop the mobile launcher were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220321-PH-JBS01_0142
NASA center
KSC
Date
2022-03-21
Credit
NASA/Ben Smegelsky
Keywords
Artemis I, Kennedy Space Center, Pad 39B, Rollout, VAB, Wet Dress Rehearsal
Artemis II Crew with EGS

KSC · 2023-08-07 · KSC-20230807-PH-KLS01_0208

Artemis II Crew with EGS

Artemis II astronauts visit NASA’s Kennedy Space Center in Florida on Aug. 7, 2023. In front, from left, are NASA astronauts Reid Wiseman and Christina Koch, CSA (Canadian…

Inspect NASA record

Artemis II astronauts visit NASA’s Kennedy Space Center in Florida on Aug. 7, 2023. In front, from left, are NASA astronauts Reid Wiseman and Christina Koch, CSA (Canadian Space Agency) astronaut Jeremy Hansen, and NASA astronaut Victor Glover in the transfer aisle of the Vehicle Assembly Building. Behind them are Exploration Ground Systems team members. The approximately 10-day Artemis II flight will test NASA’s foundational human deep space exploration capabilities, the Space Launch System rocket and Orion spacecraft, for the first time with astronauts and will pave the way for lunar surface missions, including landing the first woman and the first person of color on the Moon.

Record ID
KSC-20230807-PH-KLS01_0208
NASA center
KSC
Date
2023-08-07
Credit
NASA/Kim Shiflett
Keywords
Artemis II, Artemis II crew, Astronauts, EGS, Exploration Ground Systems, KSC, Kennedy Space Center
Constellation crew exploration vehicle, or CEV, is being prepare

KSC · 2007-11-27 · KSC-07PD-3478

Constellation crew exploration vehicle, or CEV, is being prepare

In Hangar N at NASA's Kennedy Space Center, a heat shield for the Constellation crew exploration vehicle, or CEV, is being prepared for a demonstration. A developmental heat…

Inspect NASA record

In Hangar N at NASA's Kennedy Space Center, a heat shield for the Constellation crew exploration vehicle, or CEV, is being prepared for a demonstration. A developmental heat shield for the Orion spacecraft is being tested and evaluated at Kennedy. The shield was designed and assembled by the Boeing Company in Huntington Beach, Calif., for NASA's Constellation Program. The thermal protection system manufacturing demonstration unit is designed to protect astronauts from extreme heat during re-entry to Earth's atmosphere from low Earth orbit and lunar missions. The CEV will be used to dock and gain access to the International Space Station, travel to the moon in the 2018 timeframe and play a crucial role in exploring Mars.

Record ID
KSC-07PD-3478
NASA center
KSC
Date
2007-11-27
Credit
NASA
Keywords
CEV, heat shield
Employees working on Artemis I SLS Flight Hardware

KSC · 2022-01-10 · KSC-20220110-PH-CSH01_0059

Employees working on Artemis I SLS Flight Hardware

In view are Artemis I Space Launch System main engines in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Jan.…

Inspect NASA record

In view are Artemis I Space Launch System main engines in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Jan. 10, 2022. The engines will be gimbled, or moved in unison in different directions, during processing and checkout. Artemis I will be the first integrated test of NASA’s deep space exploration systems: the Orion spacecraft, Space Launch System (SLS) rocket and the ground systems at Kennedy. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220110-PH-CSH01_0059
NASA center
KSC
Date
2022-01-10
Credit
NASA/Cory Huston
Keywords
Artemis, Artemis I, Orion, Space Launch System, SLS, Vehicle Assembly Building, VAB, High Bay 3, Kennedy Space Center, KSC
KSC-68p-417

KSC · 1968-10-11 · 68p-417

KSC-68p-417

KENNEDY SPACE CENTER, FLA. -- Apollo 7 astronauts Donn F. Eisele, foreground, and Walter Cunningham, rear, undergo spacesuit checks today prior to their Earth orbital mission with Walter…

Inspect NASA record

KENNEDY SPACE CENTER, FLA. -- Apollo 7 astronauts Donn F. Eisele, foreground, and Walter Cunningham, rear, undergo spacesuit checks today prior to their Earth orbital mission with Walter M. Schirra Jr., not shown. The three space pilots lifted off atop a Saturn 1B space vehicle from Cape Kennedy's Launch Complex 34 at 11:03 a.m. EDT, Oct. 11, 1968. The National Aeronautics and Space Administration's first manned Apollo flight is designed to verify spacecraft systems for future lunar voyages.

Record ID
68p-417
NASA center
KSC
Date
1968-10-11
Credit
NASA or National Aeronautics and Space Administration
Crawler Transporter Roll to VAB for Artemis I WDR Rollout

KSC · 2022-03-11 · KSC-20220311-PH-KLS01_0061

Crawler Transporter Roll to VAB for Artemis I WDR Rollout

Engineers and technicians drive the crawler-transporter 2 along the crawlerway toward the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on March 11, 2022. The…

Inspect NASA record

Engineers and technicians drive the crawler-transporter 2 along the crawlerway toward the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on March 11, 2022. The crawler will go inside the VAB, where it will slide under the Artemis I Space Launch System with the Orion spacecraft atop on the mobile launcher and carry it to Launch Complex 39B for a wet dress rehearsal test ahead of the Artemis I launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220311-PH-KLS01_0061
NASA center
KSC
Date
2022-03-11
Credit
NASA/Kim Shiflett
Keywords
Artemis, Artemis I, EGS, KSC, ML, Orion, Rollout, SLS, VAB, WDR, Wet Dress Rehearsal