Interstellar Minds

‹ Interstellar Minds

Update Site (from NASA)

Explore NASA’s Image and Video Library.

Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.

Sign in to suggest a Marvel.

Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.

NASA image records

Constellation crew exploration vehicle, or CEV, is being prepare

KSC · 2007-11-27 · KSC-07PD-3479

Constellation crew exploration vehicle, or CEV, is being prepare

In Hangar N at NASA's Kennedy Space Center, a heat shield for the Constellation crew exploration vehicle, or CEV, is being prepared for a demonstration. A developmental heat…

Inspect NASA record

In Hangar N at NASA's Kennedy Space Center, a heat shield for the Constellation crew exploration vehicle, or CEV, is being prepared for a demonstration. A developmental heat shield for the Orion spacecraft is being tested and evaluated at Kennedy. The shield was designed and assembled by the Boeing Company in Huntington Beach, Calif., for NASA's Constellation Program. The thermal protection system manufacturing demonstration unit is designed to protect astronauts from extreme heat during re-entry to Earth's atmosphere from low Earth orbit and lunar missions. The CEV will be used to dock and gain access to the International Space Station, travel to the moon in the 2018 timeframe and play a crucial role in exploring Mars.

Record ID
KSC-07PD-3479
NASA center
KSC
Date
2007-11-27
Credit
NASA
Keywords
CEV, heat shield
Recovery- Apollo 9

JSC · 1969-03-13 · S69-27468

Recovery- Apollo 9

S69-27468 (13 March 1969) --- U.S. Navy underwater demolition team swimmers assist the Apollo 9 crew during recovery operations just after splashdown. They have already attached a flotation…

Inspect NASA record

S69-27468 (13 March 1969) --- U.S. Navy underwater demolition team swimmers assist the Apollo 9 crew during recovery operations just after splashdown. They have already attached a flotation collar to the Command Module (CM). Astronaut Russell L. Schweickart, lunar module pilot, is about to climb into raft. In background is astronaut David R. Scott, command module pilot. Still inside the spacecraft is astronaut James A. McDivitt, commander. Splashdown occurred at 12:00:53 p.m. (EST), March 13, 1969, only 4.5 nautical miles from the prime recovery ship, USS Guadalcanal, to conclude a successful 10-day Earth-orbital mission in space.

Record ID
S69-27468
NASA center
JSC
Date
1969-03-13
Crawler Transporter Roll to VAB for Artemis I WDR Rollout

KSC · 2022-03-11 · KSC-20220311-PH-KLS01_0131

Crawler Transporter Roll to VAB for Artemis I WDR Rollout

Engineers and technicians drive the crawler-transporter 2 along the crawlerway toward the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on March 11, 2022. The…

Inspect NASA record

Engineers and technicians drive the crawler-transporter 2 along the crawlerway toward the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on March 11, 2022. The crawler will go inside the VAB, where it will slide under the Artemis I Space Launch System with the Orion spacecraft atop on the mobile launcher and carry it to Launch Complex 39B for a wet dress rehearsal test ahead of the Artemis I launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220311-PH-KLS01_0131
NASA center
KSC
Date
2022-03-11
Credit
NASA/Kim Shiflett
Keywords
Artemis, Artemis I, EGS, KSC, ML, Orion, Rollout, SLS, VAB, WDR, Wet Dress Rehearsal
Artemis I Rocket Beauty Shots

KSC · 2022-06-29 · KSC-20220630-PH-KLS01_0025

Artemis I Rocket Beauty Shots

A view of the Artemis I Space Launch System (SLS) and Orion spacecraft atop the mobile launcher at Launch Pad 39B at NASA’s Kennedy Space Center in Florida…

Inspect NASA record

A view of the Artemis I Space Launch System (SLS) and Orion spacecraft atop the mobile launcher at Launch Pad 39B at NASA’s Kennedy Space Center in Florida on June 30, 2022. The SLS and Orion were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220630-PH-KLS01_0025
NASA center
KSC
Date
2022-06-29
Credit
NASA/Kim Shiflett
Keywords
Artemis, Orion, SLS, Space Launch System, EGS, Exploration Ground System, Artemis I, Pad B, Pad 39B, Wet Dress Rehearsal, WDR
Constellation crew exploration vehicle, or CEV, is being prepare

KSC · 2007-11-27 · KSC-07PD-3477

Constellation crew exploration vehicle, or CEV, is being prepare

In Hangar N at NASA's Kennedy Space Center, a heat shield for the Constellation crew exploration vehicle, or CEV, is being prepared for a demonstration. A developmental heat…

Inspect NASA record

In Hangar N at NASA's Kennedy Space Center, a heat shield for the Constellation crew exploration vehicle, or CEV, is being prepared for a demonstration. A developmental heat shield for the Orion spacecraft is being tested and evaluated at Kennedy. The shield was designed and assembled by the Boeing Company in Huntington Beach, Calif., for NASA's Constellation Program. The thermal protection system manufacturing demonstration unit is designed to protect astronauts from extreme heat during re-entry to Earth's atmosphere from low Earth orbit and lunar missions. The CEV will be used to dock and gain access to the International Space Station, travel to the moon in the 2018 timeframe and play a crucial role in exploring Mars.

Record ID
KSC-07PD-3477
NASA center
KSC
Date
2007-11-27
Credit
NASA
Keywords
CEV, heat shield
LADEE/Minotaur V Rocket

HQ · 2013-09-06 · 201309060006HQ

LADEE/Minotaur V Rocket

The doors of the gantry support structure are opened to reveal the Minotaur V rocket on Pad 0B at the Mid-Atlantic Regional Spaceport (MARS) at NASA's Wallops Flight…

Inspect NASA record

The doors of the gantry support structure are opened to reveal the Minotaur V rocket on Pad 0B at the Mid-Atlantic Regional Spaceport (MARS) at NASA's Wallops Flight Facility, Friday, Sept. 6, 2013 in Virginia. The Minotaur V will launch NASA's Lunar Atmosphere and Dust Environment Explorer (LADEE). LADEE is a robotic mission that will orbit the moon where it will provide unprecedented information about the environment around the moon and give scientists a better understanding of other planetary bodies in our solar system and beyond. LADEE is scheduled to launch at 11:27 p.m. Friday, Sept. 6, from NASA's Wallops Flight Facility. Photo Credit: (NASA/Carla Cioffi)

Record ID
201309060006HQ
NASA center
HQ
Date
2013-09-06
Credit
NASA/Carla Cioffi
Keywords
Launch Pad 0B, Mid-Atlantic Regional Spaceport (MARS), Minotaur V, NASA Wallops Flight Facility (WFF), Wallops Island
Artemis I at Pad 39B - Sunrise

KSC · 2022-03-24 · KSC-20220324-PH-JBS01_0021

Artemis I at Pad 39B - Sunrise

A view of the Artemis I Space Launch System (SLS) and Orion spacecraft on Launch Pad 39B during sunrise at NASA’s Kennedy Space Center in Florida on March…

Inspect NASA record

A view of the Artemis I Space Launch System (SLS) and Orion spacecraft on Launch Pad 39B during sunrise at NASA’s Kennedy Space Center in Florida on March 24, 2022. The SLS and Orion atop the mobile launcher were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220324-PH-JBS01_0021
NASA center
KSC
Date
2022-03-24
Credit
NASA/Ben Smegelsky
Keywords
Kennedy Space Center, Artemis I, rollout, VAB, pad 39B, wet dress rehearsal
LADEE NASA Social

HQ · 2013-09-05 · 201309050007HQ

LADEE NASA Social

NASA Lunar Atmosphere and Dust Environment Explorer (LADEE) Program Scientist Sarah Noble talks during a NASA Social about the LADEE mission at NASA Wallops Flight Facility, Thursday, Sept.…

Inspect NASA record

NASA Lunar Atmosphere and Dust Environment Explorer (LADEE) Program Scientist Sarah Noble talks during a NASA Social about the LADEE mission at NASA Wallops Flight Facility, Thursday, Sept. 5, 2013 on Wallops Island, VA. Fifty of NASA's social media followers are attending a two-day event in support of the LADEE launch. Data from LADEE will provide unprecedented information about the environment around the moon and give scientists a better understanding of other planetary bodies in our solar system and beyond. LADEE is scheduled to launch at 11:27 p.m. Friday, Sept. 6, from NASA's Wallops Flight Facility. Photo Credit: (NASA/Carla Cioffi)

Record ID
201309050007HQ
NASA center
HQ
Date
2013-09-05
Credit
NASA/Carla Cioffi
Keywords
NASA Social, NASA Wallops Flight Facility (WFF), Sarah Noble, Virginia, Wallops Island
Rainbow over Pad 39B

KSC · 2022-06-12 · KSC-20220612-PH-JBS01_0008

Rainbow over Pad 39B

A full rainbow is in view over the Launch Complex 39B area at NASA’s Kennedy Space Center in Florida on June 12, 2022. The Artemis I Space Launch…

Inspect NASA record

A full rainbow is in view over the Launch Complex 39B area at NASA’s Kennedy Space Center in Florida on June 12, 2022. The Artemis I Space Launch System and Orion spacecraft atop the mobile launcher were moved to Pad 39B atop the crawler-transport 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220612-PH-JBS01_0008
NASA center
KSC
Date
2022-06-12
Credit
NASA/Ben Smegelsky
Keywords
KSC, Kennedy Space Center, Pad 39B, Rainbow
Max Power Support - SLF AirDot Show Main Stage

KSC · 2026-11-07 · KSC-20261107-PH-KLS01_0019

Max Power Support - SLF AirDot Show Main Stage

From left, NASA astronauts Frank Rubio, Artemis III mission specialist, and NASA astronaut Bob Hines, Artemis III backup crew member, greet a crowd during the agency’s MAX POWER…

Inspect NASA record

From left, NASA astronauts Frank Rubio, Artemis III mission specialist, and NASA astronaut Bob Hines, Artemis III backup crew member, greet a crowd during the agency’s MAX POWER expo and air show on Saturday, Nov. 7, 2026, at the agency’s Kennedy Space Center in Florida. MAX POWER is an aerospace festival celebrating the past, present, and future of flight and space exploration. Artemis III will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.

Record ID
KSC-20261107-PH-KLS01_0019
NASA center
KSC
Date
2026-11-07
Credit
NASA/Kim Shiflett
Keywords
John. F. Kennedy Space Center, Kennedy, Kennedy Space Center, KSC, Spaceport, Cape Canaveral, NASA, rocket ranch, Florida, multi-user spaceport, premier spaceport, space coast
Crawler Transporter 2 Roll into VAB for Artemis I WDR Rollout &

KSC · 2022-06-03 · KSC-20220603-PH-GEB01_0198

Crawler Transporter 2 Roll into VAB for Artemis I WDR Rollout &

With all of the work platforms retracted, NASA’s Space Launch System and Orion spacecraft atop the mobile launcher are in view in High Bay 3 of the Vehicle…

Inspect NASA record

With all of the work platforms retracted, NASA’s Space Launch System and Orion spacecraft atop the mobile launcher are in view in High Bay 3 of the Vehicle Assembly Building at the agency’s Kennedy Space Center in Florida on June 3, 2022. The crawler-transporter, driven by engineers, will slide under the Artemis I stack atop the mobile launcher and carry it to Launch Complex 39B for a wet dress rehearsal test ahead of the Artemis I launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220603-PH-GEB01_0198
NASA center
KSC
Date
2022-06-03
Credit
NASA/Glenn Benson
Keywords
Artemis, Artemis I, EGS, Exploration Ground System, KSC, Kennedy Space Center, Orion, Pad B, SLS, Space Launch System, VAB, rollout
NASA HQ New A-Suite Visit

KSC · 2021-04-19 · KSC-20210419-PH-KLS01_0134

NASA HQ New A-Suite Visit

Senior leaders with Kennedy Space Center in Florida, familiarize newly appointed officials from NASA Headquarters with the center’s facilities during a tour on April 19, 2021. The group…

Inspect NASA record

Senior leaders with Kennedy Space Center in Florida, familiarize newly appointed officials from NASA Headquarters with the center’s facilities during a tour on April 19, 2021. The group is inside the Neil Armstrong Operations and Checkout Building signing an Artemis banner. Artemis I will be the first integrated test of SLS and Orion and will pave the way for landing the first woman and first person of color on the lunar surface. It will be a proving ground for deep space exploration, leading the agency’s efforts under the Artemis program for a sustainable presence on the Moon and preparing for human missions to Mars.

Record ID
KSC-20210419-PH-KLS01_0134
NASA center
KSC
Date
2021-04-19
Credit
NASA/Kim Shiflett
Keywords
Artemis, Artemis I, EGS, HQ, ICPS, KSC, LVSA, MPPF, Mobile Launcher, NASA, Orion, SLS