Update Site (from NASA)
Explore NASA’s Image and Video Library.
Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.
Sign in to suggest a Marvel.
Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.
NASA image records
KSC · 2024-09-03 · KSC-20240903-PH-JBS01_0017
ESM-3 Arrival at KSC
The transport carrier containing the European Service Module 3 for NASA’s Artemis III mission arrives at Port Canaveral on Tuesday, Sept. 3, 2024, awaiting transportation to NASA’s Kennedy…
Inspect NASA record
The transport carrier containing the European Service Module 3 for NASA’s Artemis III mission arrives at Port Canaveral on Tuesday, Sept. 3, 2024, awaiting transportation to NASA’s Kennedy Space Center in Florida. The European Service Module 3, which is assembled by Airbus in Bremen, Germany, traveled 10 days across the Atlantic Ocean via the Canopee ship. The European Service Module 3 provides the spacecraft’s propulsion, thermal control, electrical power, and life support systems. Artemis III will send four astronauts to the lunar orbit where two crew members will spend a week near the South Pole of the Moon conducting new science.
- Record ID
- KSC-20240903-PH-JBS01_0017
- NASA center
- KSC
- Date
- 2024-09-03
- Credit
- NASA/Ben Smegelsky
- Keywords
- John. F. Kennedy Space Center, ¿Kennedy, Kennedy Space Center, KSC, Spaceport, Cape Canaveral, NASA, rocket ranch, Florida, multi-user spaceport, premier spaceport, space coast
KSC · 2022-06-01 · KSC-20220601-PH-KLS01_0033
Crawler Transporter 2 Roll to VAB for Artemis I WDR Rollout
Engineers and technicians drive crawler-transporter 2 along the crawlerway toward the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on June 1, 2022. The crawler…
Inspect NASA record
Engineers and technicians drive crawler-transporter 2 along the crawlerway toward the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on June 1, 2022. The crawler will go inside the VAB, where it will slide under the Artemis I Space Launch System with the Orion spacecraft atop on the mobile launcher and carry it to Launch Complex 39B for a wet dress rehearsal test ahead of the Artemis I launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220601-PH-KLS01_0033
- NASA center
- KSC
- Date
- 2022-06-01
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis, Artemis I, CT-2, Crawler-Transporter 2, KSC, Orion, SLS, VAB, Vehicle Assembly Building
KSC · 2022-06-03 · KSC-20220603-PH-GEB01_0018
Crawler Transporter 2 Roll into VAB for Artemis I WDR Rollout &
The crawler-transporter, driven by engineers, approaches the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on June 1, 2022. The crawler will go inside the…
Inspect NASA record
The crawler-transporter, driven by engineers, approaches the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on June 1, 2022. The crawler will go inside the VAB, where it will slide under the Artemis I Space Launch System with the Orion spacecraft atop on the mobile launcher and carry it to Launch Complex 39B for a wet dress rehearsal test ahead of the Artemis I launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220603-PH-GEB01_0018
- NASA center
- KSC
- Date
- 2022-06-03
- Credit
- NASA/Glenn Benson
- Keywords
- Artemis, Artemis I, EGS, Exploration Ground System, KSC, Kennedy Space Center, Orion, Pad B, SLS, Space Launch System, VAB, rollout
JSC · 1969-03-13 · S69-27746
Recovery - Apollo 9
S69-27746 (13 March 1969) --- The Apollo 9 crew awaits the arrival of a recovery helicopter from the USS Guadalcanal, prime recovery ship for the Apollo 9 10-day…
Inspect NASA record
S69-27746 (13 March 1969) --- The Apollo 9 crew awaits the arrival of a recovery helicopter from the USS Guadalcanal, prime recovery ship for the Apollo 9 10-day Earth-orbital space mission. Astronaut James A. McDivitt, commander, stands in hatch of spacecraft. Already in life raft are astronauts Russell L. Schweickart (foreground), lunar module pilot, and David R. Scott, command module pilot. Scott is taking a picture of McDivitt. Splashdown occurred at 12:00:53 p.m. (EST), March 13, 1969, only 4.5 nautical miles from the USS Guadalcanal. U.S. Navy underwater demolition team swimmers assist in the recovery operations.
- Record ID
- S69-27746
- NASA center
- JSC
- Date
- 1969-03-13
KSC · 2021-10-19 · KSC-20211019-PH-ILW01_0097
Orion Transport to VAB
The Orion spacecraft for NASA’s Artemis I mission, fully assembled with its launch abort system, moves out of the Launch Abort System Facility at Kennedy Space Center in…
Inspect NASA record
The Orion spacecraft for NASA’s Artemis I mission, fully assembled with its launch abort system, moves out of the Launch Abort System Facility at Kennedy Space Center in Florida on Oct. 19, 2021. Orion will be transported to the Vehicle Assembly Building where it will join the already stacked flight hardware and be raised into position atop the Space Launch System rocket in High Bay 3. Launching in 2021, Artemis I will be an uncrewed test flight of the Orion spacecraft and Space Launch System rocket as an integrated system ahead of crewed flights to the Moon. Under Artemis, NASA aims to land the first woman and first person of color on the Moon and establish sustainable lunar exploration.
- Record ID
- KSC-20211019-PH-ILW01_0097
- NASA center
- KSC
- Date
- 2021-10-19
- Credit
- NASA/Isaac Watson
- Keywords
- Artemis, Artemis I, EGS, Exploration Ground System, KSC, Kennedy Space Center, LASF, Launch Abort System Facility, Moon to Mars, NASA, Orion, SLS
JSC · 1969-05-26 · Maura_test_s69-36593
Recovery - Apollo 10
S69-36593 (26 May 1969) --- The Apollo 10 astronauts Thomas P. Stafford (center), John W. Young (left) and Eugene A. Cernan (waving) are greeted by Donald E. Stullken…
Inspect NASA record
S69-36593 (26 May 1969) --- The Apollo 10 astronauts Thomas P. Stafford (center), John W. Young (left) and Eugene A. Cernan (waving) are greeted by Donald E. Stullken (lower left) of the Manned Space Center's (MSC) recovery operations team. The Apollo 10 crew splashed down in the South Pacific recovery area to conclude a successful eight-day lunar orbit mission. Splashdown occurred at 11:53 a.m. (CDT), May 26, 1969, about 400 miles east of American Samoa and about four miles from the prime recovery ship, USS Princeton.
- Record ID
- Maura_test_s69-36593
- NASA center
- JSC
- Date
- 1969-05-26
- Keywords
- Apollo, Apollo 10, Recovery
HQ · 2013-09-06 · 201309060002HQ
LADEE/Minotaur V Rocket
The doors of the gantry support structure are opened to reveal the Minotaur V rocket on Pad 0B at the Mid-Atlantic Regional Spaceport (MARS) at NASA's Wallops Flight…
Inspect NASA record
The doors of the gantry support structure are opened to reveal the Minotaur V rocket on Pad 0B at the Mid-Atlantic Regional Spaceport (MARS) at NASA's Wallops Flight Facility, Friday, Sept. 6, 2013 in Virginia. The Minotaur V will launch NASA's Lunar Atmosphere and Dust Environment Explorer (LADEE). LADEE is a robotic mission that will orbit the moon where it will provide unprecedented information about the environment around the moon and give scientists a better understanding of other planetary bodies in our solar system and beyond. LADEE is scheduled to launch at 11:27 p.m. Friday, Sept. 6, from NASA's Wallops Flight Facility. Photo Credit: (NASA/Carla Cioffi)
- Record ID
- 201309060002HQ
- NASA center
- HQ
- Date
- 2013-09-06
- Credit
- NASA/Carla Cioffi
- Keywords
- Launch Pad 0B, Mid-Atlantic Regional Spaceport (MARS), Minotaur V, NASA Wallops Flight Facility (WFF), Wallops Island
SSC · 2024-08-07 · SSC-20240807-s00816
Summer Interns Display NASA Stennis Work
NASA Stennis summer intern Madison Godbold, right, shares about her work of inspiring the Artemis Generation through ASTRO Camp activities during an Aug. 7 event hosted by the…
Inspect NASA record
NASA Stennis summer intern Madison Godbold, right, shares about her work of inspiring the Artemis Generation through ASTRO Camp activities during an Aug. 7 event hosted by the Office of STEM Engagement. Godbold, a student at The University of Southern Mississippi in Hattiesburg, worked with the NASA Stennis Office of STEM Engagement. The poster symposium highlighted research topics, including propulsion test operations, lunar robotics, autonomous systems, STEM education, and more. NASA’s Office of STEM Engagement paid internships allow high school and college-level students to contribute to the agency’s mission to advance science, technology, aeronautics, and space exploration.
- Record ID
- SSC-20240807-s00816
- NASA center
- SSC
- Date
- 2024-08-07
- Credit
- Danny Nowlin
KSC · 2007-11-27 · KSC-07PD-3480
Constellation crew exploration vehicle, or CEV, is being prepare
In Hangar N at NASA's Kennedy Space Center, a heat shield for the Constellation crew exploration vehicle, or CEV, is being prepared for a demonstration. A developmental heat…
Inspect NASA record
In Hangar N at NASA's Kennedy Space Center, a heat shield for the Constellation crew exploration vehicle, or CEV, is being prepared for a demonstration. A developmental heat shield for the Orion spacecraft is being tested and evaluated at Kennedy. The shield was designed and assembled by the Boeing Company in Huntington Beach, Calif., for NASA's Constellation Program. The thermal protection system manufacturing demonstration unit is designed to protect astronauts from extreme heat during re-entry to Earth's atmosphere from low Earth orbit and lunar missions. The CEV will be used to dock and gain access to the International Space Station, travel to the moon in the 2018 timeframe and play a crucial role in exploring Mars.
- Record ID
- KSC-07PD-3480
- NASA center
- KSC
- Date
- 2007-11-27
- Credit
- NASA
- Keywords
- CEV, heat shield
HQ · 2024-04-09 · NHQ202404090002
NASA, Japan Sign Agreement for Artemis Pressurized Rover
Japan’s Minister of Education, Culture, Sports, Science and Technology Masahito Moriyama, left, NASA Administrator Bill Nelson, and Japan Aerospace Exploration Agency (JAXA) President Hiroshi Yamakawa, right, pose for…
Inspect NASA record
Japan’s Minister of Education, Culture, Sports, Science and Technology Masahito Moriyama, left, NASA Administrator Bill Nelson, and Japan Aerospace Exploration Agency (JAXA) President Hiroshi Yamakawa, right, pose for a photograph prior to the signing an historic agreement between the United States and Japan to advance sustainable human exploration of the Moon, Tuesday, April 9, 2024, at the NASA Headquarters Mary W. Jackson Building in Washington. Under the agreement, Japan will design, develop, and operate a pressurized rover for crewed and uncrewed exploration on the Moon. NASA will provide the launch and delivery of the rover to the Moon as well as two Japanese astronaut missions to the lunar surface. Photo Credit: (NASA/Bill Ingalls)
- Record ID
- NHQ202404090002
- NASA center
- HQ
- Date
- 2024-04-09
- Credit
- NASA/Bill Ingalls
- Keywords
- Bill Nelson, DC, Hiroshi Yamakawa, Mary W. Jackson NASA Headquarters, Masahito Moriyama, NASA Administrator, Washington
KSC · 2022-03-14 · KSC-20220314-PH-KLS01_0009
Artemis I WDR Pre-Rollout Activities - NASA Worm on SRBs
Inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, application of the NASA worm logo is complete on the first of…
Inspect NASA record
Inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, application of the NASA worm logo is complete on the first of two solid rocket boosters for the Artemis I Space Launch System on March 14, 2022. The SLS and Orion spacecraft are stacked in the high bay and ready for rollout to Launch Complex 39B for a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220314-PH-KLS01_0009
- NASA center
- KSC
- Date
- 2022-03-14
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis, Artemis I, EGS, KSC, ML, Orion, Rollout, SLS, VAB, WDR, Wet Dress Rehearsal
MSFC · 1965-01-01 · 6517245
Saturn Apollo Program
S-IB-200D, a dynamic test version of the Saturn IB launch vehicle's first stage (S-IB), makes its way to the Marshall Space Flight Center (MSFC) East Test Area on…
Inspect NASA record
S-IB-200D, a dynamic test version of the Saturn IB launch vehicle's first stage (S-IB), makes its way to the Marshall Space Flight Center (MSFC) East Test Area on January 4, 1965. Test Laboratory persornel assembled a complete Saturn IB to test the structural soundness of the launch vehicle in the Dynamic Test Stand. Developed by the MSFC as an interim vehicle in MSFC's "building block" approach to the Saturn rocket development, the Saturn IB utilized Saturn I technology to further develop and refine the larger boosters and the Apollo spacecraft capabilities required for the manned lunar missions.
- Record ID
- 6517245
- NASA center
- MSFC
- Date
- 1965-01-01
- Keywords
- Saturn IB, S-IB-200D, Dynamic Test Stand, MSFC