Interstellar Minds

‹ Interstellar Minds

Update Site (from NASA)

Explore NASA’s Image and Video Library.

Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.

Sign in to suggest a Marvel.

Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.

NASA image records

ESM-3 Arrival at KSC

KSC · 2024-09-03 · KSC-20240903-PH-JBS01_0017

ESM-3 Arrival at KSC

The transport carrier containing the European Service Module 3 for NASA’s Artemis III mission arrives at Port Canaveral on Tuesday, Sept. 3, 2024, awaiting transportation to NASA’s Kennedy…

Inspect NASA record

The transport carrier containing the European Service Module 3 for NASA’s Artemis III mission arrives at Port Canaveral on Tuesday, Sept. 3, 2024, awaiting transportation to NASA’s Kennedy Space Center in Florida. The European Service Module 3, which is assembled by Airbus in Bremen, Germany, traveled 10 days across the Atlantic Ocean via the Canopee ship. The European Service Module 3 provides the spacecraft’s propulsion, thermal control, electrical power, and life support systems. Artemis III will send four astronauts to the lunar orbit where two crew members will spend a week near the South Pole of the Moon conducting new science. 

Record ID
KSC-20240903-PH-JBS01_0017
NASA center
KSC
Date
2024-09-03
Credit
NASA/Ben Smegelsky
Keywords
John. F. Kennedy Space Center, ¿Kennedy, Kennedy Space Center, KSC, Spaceport, Cape Canaveral, NASA, rocket ranch, Florida, multi-user spaceport, premier spaceport, space coast
Crawler Transporter 2 Roll to VAB for Artemis I WDR Rollout

KSC · 2022-06-01 · KSC-20220601-PH-KLS01_0033

Crawler Transporter 2 Roll to VAB for Artemis I WDR Rollout

Engineers and technicians drive crawler-transporter 2 along the crawlerway toward the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on June 1, 2022. The crawler…

Inspect NASA record

Engineers and technicians drive crawler-transporter 2 along the crawlerway toward the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on June 1, 2022. The crawler will go inside the VAB, where it will slide under the Artemis I Space Launch System with the Orion spacecraft atop on the mobile launcher and carry it to Launch Complex 39B for a wet dress rehearsal test ahead of the Artemis I launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220601-PH-KLS01_0033
NASA center
KSC
Date
2022-06-01
Credit
NASA/Kim Shiflett
Keywords
Artemis, Artemis I, CT-2, Crawler-Transporter 2, KSC, Orion, SLS, VAB, Vehicle Assembly Building
Crawler Transporter 2 Roll into VAB for Artemis I WDR Rollout &

KSC · 2022-06-03 · KSC-20220603-PH-GEB01_0018

Crawler Transporter 2 Roll into VAB for Artemis I WDR Rollout &

The crawler-transporter, driven by engineers, approaches the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on June 1, 2022. The crawler will go inside the…

Inspect NASA record

The crawler-transporter, driven by engineers, approaches the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on June 1, 2022. The crawler will go inside the VAB, where it will slide under the Artemis I Space Launch System with the Orion spacecraft atop on the mobile launcher and carry it to Launch Complex 39B for a wet dress rehearsal test ahead of the Artemis I launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220603-PH-GEB01_0018
NASA center
KSC
Date
2022-06-03
Credit
NASA/Glenn Benson
Keywords
Artemis, Artemis I, EGS, Exploration Ground System, KSC, Kennedy Space Center, Orion, Pad B, SLS, Space Launch System, VAB, rollout
Recovery - Apollo 9

JSC · 1969-03-13 · S69-27746

Recovery - Apollo 9

S69-27746 (13 March 1969) --- The Apollo 9 crew awaits the arrival of a recovery helicopter from the USS Guadalcanal, prime recovery ship for the Apollo 9 10-day…

Inspect NASA record

S69-27746 (13 March 1969) --- The Apollo 9 crew awaits the arrival of a recovery helicopter from the USS Guadalcanal, prime recovery ship for the Apollo 9 10-day Earth-orbital space mission. Astronaut James A. McDivitt, commander, stands in hatch of spacecraft. Already in life raft are astronauts Russell L. Schweickart (foreground), lunar module pilot, and David R. Scott, command module pilot. Scott is taking a picture of McDivitt. Splashdown occurred at 12:00:53 p.m. (EST), March 13, 1969, only 4.5 nautical miles from the USS Guadalcanal. U.S. Navy underwater demolition team swimmers assist in the recovery operations.

Record ID
S69-27746
NASA center
JSC
Date
1969-03-13
Orion Transport to VAB

KSC · 2021-10-19 · KSC-20211019-PH-ILW01_0097

Orion Transport to VAB

The Orion spacecraft for NASA’s Artemis I mission, fully assembled with its launch abort system, moves out of the Launch Abort System Facility at Kennedy Space Center in…

Inspect NASA record

The Orion spacecraft for NASA’s Artemis I mission, fully assembled with its launch abort system, moves out of the Launch Abort System Facility at Kennedy Space Center in Florida on Oct. 19, 2021. Orion will be transported to the Vehicle Assembly Building where it will join the already stacked flight hardware and be raised into position atop the Space Launch System rocket in High Bay 3. Launching in 2021, Artemis I will be an uncrewed test flight of the Orion spacecraft and Space Launch System rocket as an integrated system ahead of crewed flights to the Moon. Under Artemis, NASA aims to land the first woman and first person of color on the Moon and establish sustainable lunar exploration.

Record ID
KSC-20211019-PH-ILW01_0097
NASA center
KSC
Date
2021-10-19
Credit
NASA/Isaac Watson
Keywords
Artemis, Artemis I, EGS, Exploration Ground System, KSC, Kennedy Space Center, LASF, Launch Abort System Facility, Moon to Mars, NASA, Orion, SLS
Recovery - Apollo 10

JSC · 1969-05-26 · Maura_test_s69-36593

Recovery - Apollo 10

S69-36593 (26 May 1969) --- The Apollo 10 astronauts Thomas P. Stafford (center), John W. Young (left) and Eugene A. Cernan (waving) are greeted by Donald E. Stullken…

Inspect NASA record

S69-36593 (26 May 1969) --- The Apollo 10 astronauts Thomas P. Stafford (center), John W. Young (left) and Eugene A. Cernan (waving) are greeted by Donald E. Stullken (lower left) of the Manned Space Center's (MSC) recovery operations team. The Apollo 10 crew splashed down in the South Pacific recovery area to conclude a successful eight-day lunar orbit mission. Splashdown occurred at 11:53 a.m. (CDT), May 26, 1969, about 400 miles east of American Samoa and about four miles from the prime recovery ship, USS Princeton.

Record ID
Maura_test_s69-36593
NASA center
JSC
Date
1969-05-26
Keywords
Apollo, Apollo 10, Recovery
LADEE/Minotaur V Rocket

HQ · 2013-09-06 · 201309060002HQ

LADEE/Minotaur V Rocket

The doors of the gantry support structure are opened to reveal the Minotaur V rocket on Pad 0B at the Mid-Atlantic Regional Spaceport (MARS) at NASA's Wallops Flight…

Inspect NASA record

The doors of the gantry support structure are opened to reveal the Minotaur V rocket on Pad 0B at the Mid-Atlantic Regional Spaceport (MARS) at NASA's Wallops Flight Facility, Friday, Sept. 6, 2013 in Virginia. The Minotaur V will launch NASA's Lunar Atmosphere and Dust Environment Explorer (LADEE). LADEE is a robotic mission that will orbit the moon where it will provide unprecedented information about the environment around the moon and give scientists a better understanding of other planetary bodies in our solar system and beyond. LADEE is scheduled to launch at 11:27 p.m. Friday, Sept. 6, from NASA's Wallops Flight Facility. Photo Credit: (NASA/Carla Cioffi)

Record ID
201309060002HQ
NASA center
HQ
Date
2013-09-06
Credit
NASA/Carla Cioffi
Keywords
Launch Pad 0B, Mid-Atlantic Regional Spaceport (MARS), Minotaur V, NASA Wallops Flight Facility (WFF), Wallops Island
Summer Interns Display NASA Stennis Work

SSC · 2024-08-07 · SSC-20240807-s00816

Summer Interns Display NASA Stennis Work

NASA Stennis summer intern Madison Godbold, right, shares about her work of inspiring the Artemis Generation through ASTRO Camp activities during an Aug. 7 event hosted by the…

Inspect NASA record

NASA Stennis summer intern Madison Godbold, right, shares about her work of inspiring the Artemis Generation through ASTRO Camp activities during an Aug. 7 event hosted by the Office of STEM Engagement. Godbold, a student at The University of Southern Mississippi in Hattiesburg, worked with the NASA Stennis Office of STEM Engagement. The poster symposium highlighted research topics, including propulsion test operations, lunar robotics, autonomous systems, STEM education, and more. NASA’s Office of STEM Engagement paid internships allow high school and college-level students to contribute to the agency’s mission to advance science, technology, aeronautics, and space exploration.

Record ID
SSC-20240807-s00816
NASA center
SSC
Date
2024-08-07
Credit
Danny Nowlin
Constellation crew exploration vehicle, or CEV, is being prepare

KSC · 2007-11-27 · KSC-07PD-3480

Constellation crew exploration vehicle, or CEV, is being prepare

In Hangar N at NASA's Kennedy Space Center, a heat shield for the Constellation crew exploration vehicle, or CEV, is being prepared for a demonstration. A developmental heat…

Inspect NASA record

In Hangar N at NASA's Kennedy Space Center, a heat shield for the Constellation crew exploration vehicle, or CEV, is being prepared for a demonstration. A developmental heat shield for the Orion spacecraft is being tested and evaluated at Kennedy. The shield was designed and assembled by the Boeing Company in Huntington Beach, Calif., for NASA's Constellation Program. The thermal protection system manufacturing demonstration unit is designed to protect astronauts from extreme heat during re-entry to Earth's atmosphere from low Earth orbit and lunar missions. The CEV will be used to dock and gain access to the International Space Station, travel to the moon in the 2018 timeframe and play a crucial role in exploring Mars.

Record ID
KSC-07PD-3480
NASA center
KSC
Date
2007-11-27
Credit
NASA
Keywords
CEV, heat shield
NASA, Japan Sign Agreement for Artemis Pressurized Rover

HQ · 2024-04-09 · NHQ202404090002

NASA, Japan Sign Agreement for Artemis Pressurized Rover

Japan’s Minister of Education, Culture, Sports, Science and Technology Masahito Moriyama, left, NASA Administrator Bill Nelson, and Japan Aerospace Exploration Agency (JAXA) President Hiroshi Yamakawa, right, pose for…

Inspect NASA record

Japan’s Minister of Education, Culture, Sports, Science and Technology Masahito Moriyama, left, NASA Administrator Bill Nelson, and Japan Aerospace Exploration Agency (JAXA) President Hiroshi Yamakawa, right, pose for a photograph prior to the signing an historic agreement between the United States and Japan to advance sustainable human exploration of the Moon, Tuesday, April 9, 2024, at the NASA Headquarters Mary W. Jackson Building in Washington. Under the agreement, Japan will design, develop, and operate a pressurized rover for crewed and uncrewed exploration on the Moon. NASA will provide the launch and delivery of the rover to the Moon as well as two Japanese astronaut missions to the lunar surface. Photo Credit: (NASA/Bill Ingalls)

Record ID
NHQ202404090002
NASA center
HQ
Date
2024-04-09
Credit
NASA/Bill Ingalls
Keywords
Bill Nelson, DC, Hiroshi Yamakawa, Mary W. Jackson NASA Headquarters, Masahito Moriyama, NASA Administrator, Washington
Artemis I WDR Pre-Rollout Activities - NASA Worm on SRBs

KSC · 2022-03-14 · KSC-20220314-PH-KLS01_0009

Artemis I WDR Pre-Rollout Activities - NASA Worm on SRBs

Inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, application of the NASA worm logo is complete on the first of…

Inspect NASA record

Inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, application of the NASA worm logo is complete on the first of two solid rocket boosters for the Artemis I Space Launch System on March 14, 2022. The SLS and Orion spacecraft are stacked in the high bay and ready for rollout to Launch Complex 39B for a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220314-PH-KLS01_0009
NASA center
KSC
Date
2022-03-14
Credit
NASA/Kim Shiflett
Keywords
Artemis, Artemis I, EGS, KSC, ML, Orion, Rollout, SLS, VAB, WDR, Wet Dress Rehearsal
Saturn Apollo Program

MSFC · 1965-01-01 · 6517245

Saturn Apollo Program

S-IB-200D, a dynamic test version of the Saturn IB launch vehicle's first stage (S-IB), makes its way to the Marshall Space Flight Center (MSFC) East Test Area on…

Inspect NASA record

S-IB-200D, a dynamic test version of the Saturn IB launch vehicle's first stage (S-IB), makes its way to the Marshall Space Flight Center (MSFC) East Test Area on January 4, 1965. Test Laboratory persornel assembled a complete Saturn IB to test the structural soundness of the launch vehicle in the Dynamic Test Stand. Developed by the MSFC as an interim vehicle in MSFC's "building block" approach to the Saturn rocket development, the Saturn IB utilized Saturn I technology to further develop and refine the larger boosters and the Apollo spacecraft capabilities required for the manned lunar missions.

Record ID
6517245
NASA center
MSFC
Date
1965-01-01
Keywords
Saturn IB, S-IB-200D, Dynamic Test Stand, MSFC