Update Site (from NASA)
Explore NASA’s Image and Video Library.
Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.
Sign in to suggest a Marvel.
Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.
NASA image records
HQ · 2013-09-06 · 201309060001HQ
LADEE/Minotaur V Rocket
The doors of the gantry support structure are opened to reveal the Minotaur V rocket on Pad 0B at the Mid-Atlantic Regional Spaceport (MARS) at NASA's Wallops Flight…
Inspect NASA record
The doors of the gantry support structure are opened to reveal the Minotaur V rocket on Pad 0B at the Mid-Atlantic Regional Spaceport (MARS) at NASA's Wallops Flight Facility, Friday, Sept. 6, 2013 in Virginia. The Minotaur V will launch NASA's Lunar Atmosphere and Dust Environment Explorer (LADEE). LADEE is a robotic mission that will orbit the moon where it will provide unprecedented information about the environment around the moon and give scientists a better understanding of other planetary bodies in our solar system and beyond. LADEE is scheduled to launch at 11:27 p.m. Friday, Sept. 6, from NASA's Wallops Flight Facility. Photo Credit: (NASA/Carla Cioffi)
- Record ID
- 201309060001HQ
- NASA center
- HQ
- Date
- 2013-09-06
- Credit
- NASA/Carla Cioffi
- Keywords
- Launch Pad 0B, Mid-Atlantic Regional Spaceport (MARS), Minotaur V, NASA Wallops Flight Facility (WFF), Wallops Island
KSC · 2026-10-23 · KSC-20261023-PH--CSH02--0031
Artemis Acceleration Press Conference
From left to right; NASA Administrator Jared Isaacman; NASA Deputy Press Secretary George Alderman; NASA Associate Administrator Amit Kshatriya participate, in a news conference on Friday, Oct. 23,…
Inspect NASA record
From left to right; NASA Administrator Jared Isaacman; NASA Deputy Press Secretary George Alderman; NASA Associate Administrator Amit Kshatriya participate, in a news conference on Friday, Oct. 23, 2026, at the agency’s Kennedy Space Center in Florida. The briefing reviewed plans for NASA’s Artemis III mission that will send four astronauts to low Earth orbit in 2027 to test critical systems needed for future lunar landings and updated the plans to return American astronauts to the Moon by 2028. In a monitor next to Isaacman is a view of Artemis III’s core stage of the SLS (Space Launch System) rocket in the transfer aisle of the Vehicle Assemble Building at NASA Kennedy.
- Record ID
- KSC-20261023-PH--CSH02--0031
- NASA center
- KSC
- Date
- 2026-10-23
- Credit
- NASA/Cory S Huston
- Keywords
- Acceleration, Artemis, Artemis III, Artemis IV, Kennedy Space Center, Moon, SLS, Space Launch System
HQ · 2018-08-23 · NHQ201808230009
VP Pence visits Johnson Space Center
Vice President Mike Pence, center, views Sample 15014, which was collected during Apollo 15 with NASA's Apollo Sample Curator Ryan Zeigler, left, and Apollo 17 astronaut and geologist…
Inspect NASA record
Vice President Mike Pence, center, views Sample 15014, which was collected during Apollo 15 with NASA's Apollo Sample Curator Ryan Zeigler, left, and Apollo 17 astronaut and geologist Dr. Harrison Schmitt, right, in Lunar Curation Laboratory at NASA's Johnson Space Center, Thursday, Aug. 23, 2018 in Houston, Texas. Sample 15014 is one of nine samples out of the 2,196 collected during the Apollo missions that was sealed inside its container on the Moon and still containes gasses from the Moon. Photo Credit: (NASA/Joel Kowsky)
- Record ID
- NHQ201808230009
- NASA center
- HQ
- Date
- 2018-08-23
- Credit
- NASA/Joel Kowsky
- Keywords
- Astromaterials Curation Laboratory, Harrison Schmitt, Houston, Johnson Space Center (JSC), Mike Pence, Texas
KSC · 2007-11-27 · KSC-07PD-3481
Constellation crew exploration vehicle, or CEV, is being prepare
In Hangar N at NASA's Kennedy Space Center, a heat shield for the Constellation crew exploration vehicle, or CEV, is being prepared for a demonstration. A developmental heat…
Inspect NASA record
In Hangar N at NASA's Kennedy Space Center, a heat shield for the Constellation crew exploration vehicle, or CEV, is being prepared for a demonstration. A developmental heat shield for the Orion spacecraft is being tested and evaluated at Kennedy. The shield was designed and assembled by the Boeing Company in Huntington Beach, Calif., for NASA's Constellation Program. The thermal protection system manufacturing demonstration unit is designed to protect astronauts from extreme heat during re-entry to Earth's atmosphere from low Earth orbit and lunar missions. The CEV will be used to dock and gain access to the International Space Station, travel to the moon in the 2018 timeframe and play a crucial role in exploring Mars.
- Record ID
- KSC-07PD-3481
- NASA center
- KSC
- Date
- 2007-11-27
- Credit
- NASA
- Keywords
- CEV, heat shield
KSC · 2022-04-21 · KSC-20220421-PH-JBS01_0028
Artemis I at Pad 39B
A view of the Artemis I Space Launch System (SLS) and Orion spacecraft on Launch Pad 39B at NASA’s Kennedy Space Center in Florida on April 21, 2022.…
Inspect NASA record
A view of the Artemis I Space Launch System (SLS) and Orion spacecraft on Launch Pad 39B at NASA’s Kennedy Space Center in Florida on April 21, 2022. Also in view are the three lightning protection towers and water tower. The SLS and Orion atop the mobile launcher were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In future Artemis missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220421-PH-JBS01_0028
- NASA center
- KSC
- Date
- 2022-04-21
- Credit
- NASA/Ben Smegelsky
- Keywords
- Artemis, Artemis I, KSC, Kennedy Space Center, Launch Complex 39B, Launch Pad 39B, Moon to Mars, Orion, Pad 39B, SLS, Space Launch System
KSC · 2026-10-14 · KSC-20261014-PH-JLS01_0097
Artemis III Cryo Sim in LCC Firing Rooms 1 and 2
Jeremy Graeber, Artemis assistant launch director, participates in a cryogenic propellant loading simulation on Wednesday, Oct. 14, 2026, inside Firing Room 1 of the Rocco A. Petrone Launch…
Inspect NASA record
Jeremy Graeber, Artemis assistant launch director, participates in a cryogenic propellant loading simulation on Wednesday, Oct. 14, 2026, inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. Members of NASA’s Exploration Ground Systems team rehearse the steps to load the super-cooled liquid hydrogen and liquid oxygen into the SLS (Space Launch System) rocket core stage, a process that starts several hours before liftoff for the Artemis III mission. Artemis III will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.
- Record ID
- KSC-20261014-PH-JLS01_0097
- NASA center
- KSC
- Date
- 2026-10-14
- Credit
- NASA/Jonathan Shaban
- Keywords
- Artemis, Artemis 3, Artemis III, Firing Room 1, Firing Room 2, Launch Control Center, LCC, Kennedy Space Center, EGS, Exploration Ground Systems, Artemis launch team, launch simulations
KSC · 2023-08-07 · KSC-20230807-PH-KLS01_0068
Artemis II Crew with EGS
Artemis II astronauts visit NASA’s Kennedy Space Center in Florida on Aug. 7, 2023. In front, from left, are NASA astronauts Victor Glover and Reid Wiseman, and CSA…
Inspect NASA record
Artemis II astronauts visit NASA’s Kennedy Space Center in Florida on Aug. 7, 2023. In front, from left, are NASA astronauts Victor Glover and Reid Wiseman, and CSA (Canadian Space Agency) astronaut Jeremy Hansen with the Exploration Ground Systems team beneath the mobile launcher 1. The approximately 10-day Artemis II flight will test NASA’s foundational human deep space exploration capabilities, the Space Launch System rocket and Orion spacecraft, for the first time with astronauts and will pave the way for lunar surface missions, including landing the first woman and the first person of color on the Moon.
- Record ID
- KSC-20230807-PH-KLS01_0068
- NASA center
- KSC
- Date
- 2023-08-07
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis II, Artemis II crew, Astronauts, EGS, Exploration Ground Systems, KSC, Kennedy Space Center
KSC · 2022-03-16 · KSC-20220316-PH-GEB01_0038
Artemis I WDR Pre-Rollout Activities - Beauty Shots, All Platfor
In this view looking up in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, all of the work platforms that surround…
Inspect NASA record
In this view looking up in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, all of the work platforms that surround the Artemis I Space Launch System (SLS) and Orion spacecraft are fully retracted on March 16, 2022. The Artemis I stack atop the mobile launcher will roll out to Launch Complex 39B atop the crawler-transporter 2 for a wet dress rehearsal ahead of launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220316-PH-GEB01_0038
- NASA center
- KSC
- Date
- 2022-03-16
- Credit
- NASA/Glenn Benson
- Keywords
- Artemis, Artemis I, EGS, KSC, ML, Orion, SLS, VAB, WDR, rollout, wet dress rehearsal
KSC · 2012-05-23 · KSC-2012-3011
KSC-2012-3011
CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center Visitor Complex in Florida, two judges monitor the progress of two Lunabots inside the Lunarena during NASA’s Lunabotics Mining…
Inspect NASA record
CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center Visitor Complex in Florida, two judges monitor the progress of two Lunabots inside the Lunarena during NASA’s Lunabotics Mining Competition. The mining competition is sponsored by NASA Kennedy Space Center’s Education Office for the agency’s Exploration Systems Mission Directorate. Undergraduate and graduate students from more than 50 universities and colleges in the U.S. and other countries use their remote-controlled Lunabots to maneuver and dig in a supersized sandbox filled with a crushed material that has characteristics similar to lunar soil. For more information, visit www.nasa.gov/lunabotics. Photo credit: NASA/Frankie Martin
- Record ID
- KSC-2012-3011
- NASA center
- KSC
- Date
- 2012-05-23
- Keywords
- Lunabotics, mining, lunar, soil
KSC · 2019-03-11 · KSC-20190311-PH_KLS01_0104
Moon to Mars Fiscal Year 2020 Budget Proposal
NASA Administrator Jim Bridenstine speaks to NASA workers across the nation and members of the news media, during a Moon to Mars event in the Neil Armstrong Operations…
Inspect NASA record
NASA Administrator Jim Bridenstine speaks to NASA workers across the nation and members of the news media, during a Moon to Mars event in the Neil Armstrong Operations and Checkout Building high bay on March 11, 2019. Behind him is the Orion crew module for Exploration Mission-2. The event followed the delivery of President Trump’s fiscal year 2020 budget proposal to U.S. Congress, which includes funding for the agency’s Moon to Mars initiative and Gateway lunar outpost. Bridenstine presented a closer look at America’s work to return astronauts to the Moon in a sustainable way and continue exploration to Mars.
- Record ID
- KSC-20190311-PH_KLS01_0104
- NASA center
- KSC
- Date
- 2019-03-11
- Credit
- NASA/Kim Shiflett
- Keywords
- Moon to Mars, Exploration, Gateway, O&C, Neil Armstrong Operations and Checkout Building, Orion, NASA 2020 Budget
KSC · 2022-04-21 · KSC-20220421-PH-JBS01_0073
Artemis I at Pad 39B
Wildflowers frame a view of the Artemis I Space Launch System (SLS) and Orion spacecraft on Launch Pad 39B at NASA’s Kennedy Space Center in Florida on April…
Inspect NASA record
Wildflowers frame a view of the Artemis I Space Launch System (SLS) and Orion spacecraft on Launch Pad 39B at NASA’s Kennedy Space Center in Florida on April 21, 2022. Also in view are two of the three lightning protection towers and the water tower. The SLS and Orion atop the mobile launcher were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In future Artemis missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220421-PH-JBS01_0073
- NASA center
- KSC
- Date
- 2022-04-21
- Credit
- NASA/Ben Smegelsky
- Keywords
- Artemis, Artemis I, KSC, Kennedy Space Center, Launch Complex 39B, Launch Pad 39B, Moon to Mars, Orion, Pad 39B, SLS, Space Launch System
KSC · 2022-03-15 · KSC-20220315-PH-KLS01_0094
Artemis I WDR Pre-Rollout Activities - Crawler Transporter Rolls
Driven by engineers and technicians, the crawler-transporter 2 slides under the Artemis I Space Launch System (SLS) with the Orion spacecraft atop on the mobile launcher inside the…
Inspect NASA record
Driven by engineers and technicians, the crawler-transporter 2 slides under the Artemis I Space Launch System (SLS) with the Orion spacecraft atop on the mobile launcher inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on March 15, 2022. The crawler will carry the Artemis I stack to Launch Complex 39B for a wet dress rehearsal test ahead of launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220315-PH-KLS01_0094
- NASA center
- KSC
- Date
- 2022-03-15
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis, Artemis I, EGS, KSC, ML, Orion, SLS, VAB, WDR, rollout, wet dress rehearsal