Interstellar Minds

‹ Interstellar Minds

Update Site (from NASA)

Explore NASA’s Image and Video Library.

Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.

Sign in to suggest a Marvel.

Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.

NASA image records

Modal Tap Testing

KSC · 2021-08-16 · KSC-20210816-PH-ILW01_0089

Modal Tap Testing

A view of one of the RS-25 engines on the Space Launch System rocket as seen from the zero deck of the mobile launcher inside the Vehicle Assembly…

Inspect NASA record

A view of one of the RS-25 engines on the Space Launch System rocket as seen from the zero deck of the mobile launcher inside the Vehicle Assembly Building on Aug. 16, 2021. Four RS-25 engines will fire for over eight minutes at liftoff of the Artemis I mission to help get the Orion spacecraft to orbit. Artemis I will be an uncrewed test of the Orion spacecraft and SLS rocket as an integrated system ahead of crewed flights to the Moon. Under Artemis, NASA aims to land the first woman and first person of color on the Moon and establish sustainable lunar exploration.

Record ID
KSC-20210816-PH-ILW01_0089
NASA center
KSC
Date
2021-08-16
Credit
NASA/Isaac Watson
Keywords
Artemis, Artemis I, Modal Testing, SLS, Space Launch System, VAB, Vehicle Assembly Building
ESM-3 Arrival at KSC

KSC · 2024-09-03 · KSC-20240903-PH-JBS01_0010

ESM-3 Arrival at KSC

The transport carrier containing the European Service Module 3 for NASA’s Artemis III mission arrives at Port Canaveral on Tuesday, Sept. 3, 2024, awaiting transportation to NASA’s Kennedy…

Inspect NASA record

The transport carrier containing the European Service Module 3 for NASA’s Artemis III mission arrives at Port Canaveral on Tuesday, Sept. 3, 2024, awaiting transportation to NASA’s Kennedy Space Center in Florida. The European Service Module 3, which is assembled by Airbus in Bremen, Germany, traveled 10 days across the Atlantic Ocean via the Canopee ship. The European Service Module 3 provides the spacecraft’s propulsion, thermal control, electrical power, and life support systems. Artemis III will send four astronauts to the lunar orbit where two crew members will spend a week near the South Pole of the Moon conducting new science. 

Record ID
KSC-20240903-PH-JBS01_0010
NASA center
KSC
Date
2024-09-03
Credit
NASA/Ben Smegelsky
Keywords
John. F. Kennedy Space Center, ¿Kennedy, Kennedy Space Center, KSC, Spaceport, Cape Canaveral, NASA, rocket ranch, Florida, multi-user spaceport, premier spaceport, space coast
Coverage of NASA Administrator Visit

KSC · 2021-07-28 · KSC-20210728-PH-KLS01_0173

Coverage of NASA Administrator Visit

Jeremy Graeber, left, chief of the Test, Launch, and Recovery Operations Branch within the agency’s Exploration Ground Systems Program, speaks with NASA Administrator Bill Nelson inside the Launch…

Inspect NASA record

Jeremy Graeber, left, chief of the Test, Launch, and Recovery Operations Branch within the agency’s Exploration Ground Systems Program, speaks with NASA Administrator Bill Nelson inside the Launch Control Center (LCC) at the agency’s Kennedy Space Center in Florida on July 28, 2021. During Nelson’s visit to Kennedy, he had the opportunity to tour the LCC and learn about the launch team as preparations for Artemis I continue. The first in an increasingly complex set of missions, Artemis I will test SLS and Orion as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will land the first woman and first person of color on the lunar surface, as well as establish a sustainable presence on and around the Moon.

Record ID
KSC-20210728-PH-KLS01_0173
NASA center
KSC
Date
2021-07-28
Credit
NASA/Kim Shiflett
Keywords
Administrator, Administrator Bill Nelson, Bill Nelson, Bob Cabana, KSC, Kennedy Space Center, Pam Melroy, Tour, Visit
Artemis I at Pad 39B

KSC · 2022-04-21 · KSC-20220421-PH-JBS01_0115

Artemis I at Pad 39B

A view of the Artemis I Space Launch System (SLS) and Orion spacecraft atop the mobile launcher (ML) on Launch Pad 39B at NASA’s Kennedy Space Center in…

Inspect NASA record

A view of the Artemis I Space Launch System (SLS) and Orion spacecraft atop the mobile launcher (ML) on Launch Pad 39B at NASA’s Kennedy Space Center in Florida on April 21, 2022. Also in view are several of the umbilical connections from the ML to the rocket. The SLS and Orion atop the mobile launcher were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In future Artemis missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220421-PH-JBS01_0115
NASA center
KSC
Date
2022-04-21
Credit
NASA/Ben Smegelsky
Keywords
Artemis, Artemis I, KSC, Kennedy Space Center, Launch Complex 39B, Launch Pad 39B, Moon to Mars, Orion, Pad 39B, SLS, Space Launch System
LADEE/Minotaur V Rocket

HQ · 2013-09-06 · 201309060004HQ

LADEE/Minotaur V Rocket

The doors of the gantry support structure are opened to reveal the Minotaur V rocket on Pad 0B at the Mid-Atlantic Regional Spaceport (MARS) at NASA's Wallops Flight…

Inspect NASA record

The doors of the gantry support structure are opened to reveal the Minotaur V rocket on Pad 0B at the Mid-Atlantic Regional Spaceport (MARS) at NASA's Wallops Flight Facility, Friday, Sept. 6, 2013 in Virginia. The Minotaur V will launch NASA's Lunar Atmosphere and Dust Environment Explorer (LADEE). LADEE is a robotic mission that will orbit the moon where it will provide unprecedented information about the environment around the moon and give scientists a better understanding of other planetary bodies in our solar system and beyond. LADEE is scheduled to launch at 11:27 p.m. Friday, Sept. 6, from NASA's Wallops Flight Facility. Photo Credit: (NASA/Carla Cioffi)

Record ID
201309060004HQ
NASA center
HQ
Date
2013-09-06
Credit
NASA/Carla Cioffi
Keywords
Launch Pad 0B, Mid-Atlantic Regional Spaceport (MARS), Minotaur V, NASA Wallops Flight Facility (WFF), Wallops Island
Artemis III November Launch Sim

KSC · 2026-11-11 · KSC-20261110-PH-JLS01_0087

Artemis III November Launch Sim

Jeremy Graeber, Artemis assistant launch director, participates in a launch countdown simulation for Artemis III on Tuesday, Nov. 10, 2026, inside Firing Room 1 of the Rocco A.…

Inspect NASA record

Jeremy Graeber, Artemis assistant launch director, participates in a launch countdown simulation for Artemis III on Tuesday, Nov. 10, 2026, inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. This marked the first long day simulation for the Artemis III mission where teams combined the cryogenic propellant loading and terminal count portions of the countdown. Artemis III will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.

Record ID
KSC-20261110-PH-JLS01_0087
NASA center
KSC
Date
2026-11-11
Credit
NASA/Jonathan Shaban
Keywords
Artemis 3, Artemis III, Artemis launch team, Firing Room 1, Firing Room 2, KSC, Kennedy Space Center, LCC, Launch Control Center, launch simulation
Orion Transport to VAB

KSC · 2021-10-19 · KSC-20211019-PH-ILW01_0209

Orion Transport to VAB

The Orion spacecraft for NASA’s Artemis I mission, fully assembled with its launch abort system, is moved into the transfer aisle of the Vehicle Assembly Building (VAB) at…

Inspect NASA record

The Orion spacecraft for NASA’s Artemis I mission, fully assembled with its launch abort system, is moved into the transfer aisle of the Vehicle Assembly Building (VAB) at Kennedy Space Center in Florida on Oct. 19, 2021. In the VAB, Orion will join the already stacked flight hardware and be raised into position atop the Space Launch System rocket in High Bay 3. Launching in 2021, Artemis I will be an uncrewed test flight of the Orion spacecraft and Space Launch System rocket as an integrated system ahead of crewed flights to the Moon. Under Artemis, NASA aims to land the first woman and first person of color on the Moon and establish sustainable lunar exploration.

Record ID
KSC-20211019-PH-ILW01_0209
NASA center
KSC
Date
2021-10-19
Credit
NASA/Isaac Watson
Keywords
Artemis, Artemis I, EGS, Exploration Ground System, KSC, Kennedy Space Center, LASF, Launch Abort System Facility, Moon to Mars, NASA, Orion, SLS
Coverage of NASA Administrator Visit

KSC · 2021-07-27 · KSC-20210727-PH-KLS01_0053

Coverage of NASA Administrator Visit

NASA Administrator Bill Nelson, second from left, tours the Launch Abort System Facility during a visit to the agency’s Kennedy Space Center in Florida on July 27, 2021.…

Inspect NASA record

NASA Administrator Bill Nelson, second from left, tours the Launch Abort System Facility during a visit to the agency’s Kennedy Space Center in Florida on July 27, 2021. In view is the Orion spacecraft with the newly integrated launch abort system atop as preparations for Artemis I continue. The first in an increasingly complex set of missions, Artemis I will test the Space Launch System rocket and Orion spacecraft as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will land the first woman and first person of color on the lunar surface, as well as establish a sustainable presence on and around the Moon.

Record ID
KSC-20210727-PH-KLS01_0053
NASA center
KSC
Date
2021-07-27
Credit
NASA/Kim Shiflett
Keywords
Administrator, Administrator Bill Nelson, Bill Nelson, Bob Cabana, KSC, Kennedy Space Center, Pam Melroy, Tour, Visit
Artemis I WDR Pre-Rollout Activities - Crawler Transporter Rolls

KSC · 2022-03-15 · KSC-20220315-PH-KLS01_0097

Artemis I WDR Pre-Rollout Activities - Crawler Transporter Rolls

Driven by engineers and technicians, the crawler-transporter 2, slides under the Artemis I Space Launch System (SLS) with the Orion spacecraft atop on the mobile launcher inside the…

Inspect NASA record

Driven by engineers and technicians, the crawler-transporter 2, slides under the Artemis I Space Launch System (SLS) with the Orion spacecraft atop on the mobile launcher inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on March 15, 2022. The crawler will carry the Artemis I stack to Launch Complex 39B for a wet dress rehearsal test ahead of launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220315-PH-KLS01_0097
NASA center
KSC
Date
2022-03-15
Credit
NASA/Kim Shiflett
Keywords
Artemis, Artemis I, EGS, KSC, ML, Orion, SLS, VAB, WDR, rollout, wet dress rehearsal
Artemis I at Pad 39B

KSC · 2022-04-21 · KSC-20220421-PH-JBS01_0121

Artemis I at Pad 39B

A close-up view of the Artemis I Space Launch System (SLS) and one of two solid rocket boosters on Launch Pad 39B at NASA’s Kennedy Space Center in…

Inspect NASA record

A close-up view of the Artemis I Space Launch System (SLS) and one of two solid rocket boosters on Launch Pad 39B at NASA’s Kennedy Space Center in Florida on April 21, 2022. A portion of the mobile launcher and one umbilical connection also is in view. The SLS and Orion atop the mobile launcher were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In future Artemis missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220421-PH-JBS01_0121
NASA center
KSC
Date
2022-04-21
Credit
NASA/Ben Smegelsky
Keywords
Artemis, Artemis I, KSC, Kennedy Space Center, Launch Complex 39B, Launch Pad 39B, Moon to Mars, Orion, Pad 39B, SLS, Space Launch System
NASA and Japan Briefing

HQ · 2024-04-10 · NHQ202404100005

NASA and Japan Briefing

Japan’s Minister of Education, Culture, Sports, Science and Technology Masahito Moriyama discusses the historic agreement signed April 9th at NASA Headquarters, between the United States and Japan to…

Inspect NASA record

Japan’s Minister of Education, Culture, Sports, Science and Technology Masahito Moriyama discusses the historic agreement signed April 9th at NASA Headquarters, between the United States and Japan to advance sustainable human exploration of the Moon, Wednesday, April 10, 2024, at the Japan Aerospace Exploration Agency (JAXA) offices in Washington. Under the agreement, Japan will design, develop, and operate a pressurized rover for crewed and uncrewed exploration on the Moon. NASA will provide the launch and delivery of the rover to the Moon as well as two Japanese astronaut missions to the lunar surface. Photo Credit: Photo Credit: (NASA/Bill Ingalls)

Record ID
NHQ202404100005
NASA center
HQ
Date
2024-04-10
Credit
NASA/Bill Ingalls
Keywords
DC, Japan Aerospace Exploration Agency (JAXA), Masahito Moriyama, Washington
NASA and Japan Briefing

HQ · 2024-04-10 · NHQ202404100014

NASA and Japan Briefing

NASA Pressurized Rover Project Manager Danny Newswander, left, NASA Administrator Bill Nelson, and NASA Extravehicular Activity and Human Surface Mobility Program Lara Kearney, right, discuss the historic agreement…

Inspect NASA record

NASA Pressurized Rover Project Manager Danny Newswander, left, NASA Administrator Bill Nelson, and NASA Extravehicular Activity and Human Surface Mobility Program Lara Kearney, right, discuss the historic agreement signed April 9th at NASA Headquarters, between the United States and Japan to advance sustainable human exploration of the Moon, Wednesday, April 10, 2024, at the Japan Aerospace Exploration Agency (JAXA) offices in Washington. Under the agreement, Japan will design, develop, and operate a pressurized rover for crewed and uncrewed exploration on the Moon. NASA will provide the launch and delivery of the rover to the Moon as well as two Japanese astronaut missions to the lunar surface. Photo Credit: Photo Credit: (NASA/Bill Ingalls)

Record ID
NHQ202404100014
NASA center
HQ
Date
2024-04-10
Credit
NASA/Bill Ingalls
Keywords
Bill Nelson, DC, Danny Newswander, Japan Aerospace Exploration Agency (JAXA), Lara Kearney, NASA Administrator, Washington