Update Site (from NASA)
Explore NASA’s Image and Video Library.
Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.
Sign in to suggest a Marvel.
Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.
NASA image records
LRC · 1965-11-17 · LRC-1965-B701_P-08380
Astronaut Roger Chaffee at Lunar Lander Research Facility
Group photo with crew and Astronaut Roger Chaffee at Lunar Lander Research Facility. Chaffee was one of the third group of astronauts selected by NASA in October 1963.…
Inspect NASA record
Group photo with crew and Astronaut Roger Chaffee at Lunar Lander Research Facility. Chaffee was one of the third group of astronauts selected by NASA in October 1963. In addition to participating in the overall training program, he was also tasked with working on flight control communications systems, instrumentation systems, and attitude and translation control systems in the Apollo Branch of the Astronaut office. On March 21, 1966, he was selected as one of the pilots for the AS-204 mission, the first 3-man Apollo flight. Lieutenant Commander Chaffee died on January 27, 1967, in the Apollo spacecraft flash fire during a launch pad test at Kennedy Space Center, Florida.
- Record ID
- LRC-1965-B701_P-08380
- NASA center
- LRC
- Date
- 1965-11-17
- Keywords
- LRC, LARC, NASA LANGLEY, LRC-1965-B701_P-08380, GANTRY, APOLLO, 1297, CHAFFEE, LUNAR LANDING FACILITY, center, 50th, anniversary
KSC · 2022-03-16 · KSC-20220316-PH-GEB01_0118
Artemis I WDR Pre-Rollout Activities - Beauty Shots, All Platfor
In this view looking down in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, all of the work platforms that surround…
Inspect NASA record
In this view looking down in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, all of the work platforms that surround the Artemis I Space Launch System (SLS) and Orion spacecraft are fully retracted on March 16, 2022. The Artemis I stack atop the mobile launcher will roll out to Launch Complex 39B atop the crawler-transporter 2 for a wet dress rehearsal ahead of launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220316-PH-GEB01_0118
- NASA center
- KSC
- Date
- 2022-03-16
- Credit
- NASA/Glenn Benson
- Keywords
- Artemis, Artemis I, EGS, KSC, ML, Orion, SLS, VAB, WDR, rollout, wet dress rehearsal
KSC · 2022-06-29 · KSC-20220630-PH-KLS01_0124
Artemis I Rocket Beauty Shots
A brilliant blue sky serves as a backdrop for the Artemis I Space Launch System (SLS) and Orion spacecraft atop the mobile launcher at Launch Pad 39B at…
Inspect NASA record
A brilliant blue sky serves as a backdrop for the Artemis I Space Launch System (SLS) and Orion spacecraft atop the mobile launcher at Launch Pad 39B at NASA’s Kennedy Space Center in Florida on June 30, 2022. The SLS and Orion were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220630-PH-KLS01_0124
- NASA center
- KSC
- Date
- 2022-06-29
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis, Orion, SLS, Space Launch System, EGS, Exploration Ground System, Artemis I, Pad B, Pad 39B, Wet Dress Rehearsal, WDR
KSC · 2022-04-21 · KSC-20220421-PH-JBS01_0060
Artemis I at Pad 39B
A view of the Artemis I Space Launch System (SLS) and Orion spacecraft on Launch Pad 39B at NASA’s Kennedy Space Center in Florida on April 21, 2022.…
Inspect NASA record
A view of the Artemis I Space Launch System (SLS) and Orion spacecraft on Launch Pad 39B at NASA’s Kennedy Space Center in Florida on April 21, 2022. Also in view are two of the three lightning protection towers and the water tower. The SLS and Orion atop the mobile launcher were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In future Artemis missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220421-PH-JBS01_0060
- NASA center
- KSC
- Date
- 2022-04-21
- Credit
- NASA/Ben Smegelsky
- Keywords
- Artemis, Artemis I, KSC, Kennedy Space Center, Launch Complex 39B, Launch Pad 39B, Moon to Mars, Orion, Pad 39B, SLS, Space Launch System
HQ · 2013-09-06 · 201309060005HQ
LADEE/Minotaur V Rocket
The doors of the gantry support structure are opened to reveal the Minotaur V rocket on Pad 0B at the Mid-Atlantic Regional Spaceport (MARS) at NASA's Wallops Flight…
Inspect NASA record
The doors of the gantry support structure are opened to reveal the Minotaur V rocket on Pad 0B at the Mid-Atlantic Regional Spaceport (MARS) at NASA's Wallops Flight Facility, Friday, Sept. 6, 2013 in Virginia. The Minotaur V will launch NASA's Lunar Atmosphere and Dust Environment Explorer (LADEE). LADEE is a robotic mission that will orbit the moon where it will provide unprecedented information about the environment around the moon and give scientists a better understanding of other planetary bodies in our solar system and beyond. LADEE is scheduled to launch at 11:27 p.m. Friday, Sept. 6, from NASA's Wallops Flight Facility. Photo Credit: (NASA/Carla Cioffi)
- Record ID
- 201309060005HQ
- NASA center
- HQ
- Date
- 2013-09-06
- Credit
- NASA/Carla Cioffi
- Keywords
- Launch Pad 0B, Mid-Atlantic Regional Spaceport (MARS), Minotaur V, NASA Wallops Flight Facility (WFF), Wallops Island
HQ · 2023-06-13 · NHQ202306130010
Meeting with Western Cape Government’s Alan Winde
From left to right, the Premier of the Western Cape Government, Alan Winde, NASA Deputy Associate Administrator for Space Communications and Navigation, Badri Younes, and Director-General of the…
Inspect NASA record
From left to right, the Premier of the Western Cape Government, Alan Winde, NASA Deputy Associate Administrator for Space Communications and Navigation, Badri Younes, and Director-General of the Western Cape Government, Dr. Harry Malila, are seen during a meeting with NASA representatives and a delegation from South Africa, to discuss the path forward for development of an antenna for the Lunar Exploration Ground Sites (LEGS) mission in Matjiesfontein, South Africa, and other opportunities, Tuesday, June 13, 2023, at the Mary W. Jackson NASA Headquarters building in Washington. Photo Credit: (NASA/Aubrey Gemignani)
- Record ID
- NHQ202306130010
- NASA center
- HQ
- Date
- 2023-06-13
- Credit
- NASA/Aubrey Gemignani
- Keywords
- Alan Winde, Badri Younes, DC, Harry Malila, Lunar Exploration Ground Sites (LEGS), Mary W. Jackson NASA Headquarters, South Africa, Space Operations Center (SOC), Washington
KSC · 2012-05-22 · KSC-2012-2948
KSC-2012-2948
CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center Visitor Complex in Florida, college students make last minute adjustments to their custom lunabot for NASA’s Lunabotics Mining Competition.…
Inspect NASA record
CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center Visitor Complex in Florida, college students make last minute adjustments to their custom lunabot for NASA’s Lunabotics Mining Competition. The mining competition is sponsored by NASA Kennedy Space Center’s Education Office for the agency’s Exploration Systems Mission Directorate. Undergraduate and graduate students from more than 50 universities and colleges in the U.S. and other countries use their remote-controlled Lunabots to maneuver and dig in a supersized sandbox filled with a crushed material that has characteristics similar to lunar soil. Photo credit: NASA/Frankie Martin
- Record ID
- KSC-2012-2948
- NASA center
- KSC
- Date
- 2012-05-22
- Keywords
- lunabotics, mining, lunar, soil
KSC · 2019-03-11 · KSC-20190311-PH_KLS01_0046
Moon to Mars Fiscal Year 2020 Budget Proposal
NASA Administrator Jim Bridenstine speaks toNASA workers across the nation and members of the news media, during a Moon to Mars event in the Neil Armstrong Operations and…
Inspect NASA record
NASA Administrator Jim Bridenstine speaks toNASA workers across the nation and members of the news media, during a Moon to Mars event in the Neil Armstrong Operations and Checkout Building high bay on March 11, 2019. Behind him is the Orion crew module for Exploration Mission-2. The event followed the delivery of President Trump’s fiscal year 2020 budget proposal to U.S. Congress, which includes funding for the agency’s Moon to Mars initiative and Gateway lunar outpost. Bridenstine presented a closer look at America’s work to return astronauts to the Moon in a sustainable way and continue exploration to Mars.
- Record ID
- KSC-20190311-PH_KLS01_0046
- NASA center
- KSC
- Date
- 2019-03-11
- Credit
- NASA/Kim Shiflett
- Keywords
- Moon to Mars, Exploration, Gateway, O&C, Neil Armstrong Operations and Checkout Building, Orion, NASA 2020 Budget
KSC · 2012-05-23 · KSC-2012-2973
KSC-2012-2973
CAPE CANAVERAL, Fla. - At NASA’s Kennedy Space Center Visitor Complex in Florida, a color guard brings the U.S. Flag and NASA flag forward during the opening ceremony…
Inspect NASA record
CAPE CANAVERAL, Fla. - At NASA’s Kennedy Space Center Visitor Complex in Florida, a color guard brings the U.S. Flag and NASA flag forward during the opening ceremony for NASA’s Lunabotics Mining Competition. The mining competition is sponsored by NASA Kennedy Space Center’s Education Office for the agency’s Exploration Systems Mission Directorate. Undergraduate and graduate students from more than 50 universities and colleges in the U.S. and other countries use their remote-controlled Lunabots to maneuver and dig in a supersized sandbox filled with a crushed material that has characteristics similar to lunar soil. For more information, visit www.nasa.gov/lunabotics. Photo credit: NASA/Frankie Martin
- Record ID
- KSC-2012-2973
- NASA center
- KSC
- Date
- 2012-05-23
- Keywords
- Lunabotics, mining, lunar, soil
HQ · 2013-09-06 · 201309060003HQ
LADEE/Minotaur V Rocket
The doors of the gantry support structure are opened to reveal the Minotaur V rocket on Pad 0B at the Mid-Atlantic Regional Spaceport (MARS) at NASA's Wallops Flight…
Inspect NASA record
The doors of the gantry support structure are opened to reveal the Minotaur V rocket on Pad 0B at the Mid-Atlantic Regional Spaceport (MARS) at NASA's Wallops Flight Facility, Friday, Sept. 6, 2013 in Virginia. The Minotaur V will launch NASA's Lunar Atmosphere and Dust Environment Explorer (LADEE). LADEE is a robotic mission that will orbit the moon where it will provide unprecedented information about the environment around the moon and give scientists a better understanding of other planetary bodies in our solar system and beyond. LADEE is scheduled to launch at 11:27 p.m. Friday, Sept. 6, from NASA's Wallops Flight Facility. Photo Credit: (NASA/Carla Cioffi)
- Record ID
- 201309060003HQ
- NASA center
- HQ
- Date
- 2013-09-06
- Credit
- NASA/Carla Cioffi
- Keywords
- Launch Pad 0B, Mid-Atlantic Regional Spaceport (MARS), Minotaur V, NASA Wallops Flight Facility (WFF), Wallops Island
KSC · 2022-03-23 · KSC-20220323-PH-JBS01_0003
Artemis I at Pad 39B - Sunrise
A view of the Artemis I Space Launch System (SLS) and Orion spacecraft just before sunrise at Launch Pad 39B at NASA’s Kennedy Space Center in Florida on…
Inspect NASA record
A view of the Artemis I Space Launch System (SLS) and Orion spacecraft just before sunrise at Launch Pad 39B at NASA’s Kennedy Space Center in Florida on March 23, 2022. The SLS and Orion atop the mobile launcher were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars
- Record ID
- KSC-20220323-PH-JBS01_0003
- NASA center
- KSC
- Date
- 2022-03-23
- Credit
- NASA/Ben Smegelsky
- Keywords
- Artemis I, Kennedy Space Center, Pad 39B, Rollout, VAB, Wet Dress Rehearsal
JSC · 1972-12-19 · S72-55937
Apollo 17 crew arrive aboard the U.S.S. Ticonderoga
S72-55937 (19 Dec. 1972) --- The three Apollo 17 crewmembers arrive aboard the prime recovery ship, the USS Ticonderoga, to successfully conclude the final lunar landing mission in…
Inspect NASA record
S72-55937 (19 Dec. 1972) --- The three Apollo 17 crewmembers arrive aboard the prime recovery ship, the USS Ticonderoga, to successfully conclude the final lunar landing mission in NASA's Apollo program. They are astronauts Eugene A. Cernan (waving), Harrison H. Schmitt (on Cernan's left), and Ronald E. Evans (standing in back). VIP's, dignitaries, officials and Navy personnel gave the three crew men a red-carpet welcome. Apollo 17 splashed down at 1:24:59 p.m. (CST), Dec. 19, 1972, about 350 nautical miles southeast of Samoa.
- Record ID
- S72-55937
- NASA center
- JSC
- Date
- 1972-12-19