Update Site (from NASA)
Explore NASA’s Image and Video Library.
Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.
Sign in to suggest a Marvel.
Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.
NASA image records
KSC · 2022-01-19 · KSC-20220119-PH-CSH01_0016
VAB Exterior Photos
A view of the low bay entrance to the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida, during sunrise on Jan. 19, 2022. The Artemis…
Inspect NASA record
A view of the low bay entrance to the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida, during sunrise on Jan. 19, 2022. The Artemis banner is above the door. Inside the VAB, NASA’s Space Launch System (SLS) and Orion spacecraft are stacked in High Bay 3 in preparation for the agency’s Artemis I mission. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220119-PH-CSH01_0016
- NASA center
- KSC
- Date
- 2022-01-19
- Credit
- NASA/Cory Huston
- Keywords
- Vehicle Assembly Building, VAB, Artemis, Artemis I, Orion, Space Launch System, SLS, Kennedy Space Center, KSC
HQ · 2011-08-25 · 201108250002HQ
GRAIL Mission Briefing
David Lehman, GRAIL project manager, NASA's Jet Propulsion Laboratory, Pasadena, Calif., speaks at a press conference about the upcoming launch to the moon of the Gravity Recovery and…
Inspect NASA record
David Lehman, GRAIL project manager, NASA's Jet Propulsion Laboratory, Pasadena, Calif., speaks at a press conference about the upcoming launch to the moon of the Gravity Recovery and Interior Laboratory (GRAIL) mission, Thursday, Aug. 25, 2011 in Washington. GRAIL's primary science objectives are to determine the structure of the lunar interior, from crust to core, and to advance understanding of the thermal evolution of the moon. The mission will place two spacecraft into the same orbit around the moon which will gather information about the its gravitational field enabling scientists to create a high-resolution map. Photo Credit: (NASA/Carla Cioffi)
- Record ID
- 201108250002HQ
- NASA center
- HQ
- Date
- 2011-08-25
- Credit
- NASA/Carla Cioffi
- Keywords
- David Lehman, Gravity Recovery and Interior Laboratory (GRAIL), Moon, NASA Headquarters, Washington, DC, GRAIL (Gravity Recovery and Interior Laboratory)
KSC · 2021-10-04 · KSC-20211004-PH-JBS01_0006
OSA Arrival in VAB High Bay 4
Under a protective cover, the Orion Stage Adapter (OSA) arrives in High Bay 4 of the Vehicle Assembly Building on Oct. 4, 2021, at NASA's Kennedy Space Center…
Inspect NASA record
Under a protective cover, the Orion Stage Adapter (OSA) arrives in High Bay 4 of the Vehicle Assembly Building on Oct. 4, 2021, at NASA's Kennedy Space Center in Florida. Teams will lift the ring-shaped OSA, filled with shoebox-sized CubeSats, and connect it to the Interim Cryogenic Propulsion Stage (ICPS). The Orion spacecraft will be secured on top of the Space Launch System (SLS) rocket to complete the stack ahead of the Artemis I launch. This mission will be the first integrated flight test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20211004-PH-JBS01_0006
- NASA center
- KSC
- Date
- 2021-10-04
- Credit
- NASA/Ben Smegelsky
- Keywords
- Artemis, Artemis I, EGS, OSA, Orion, SLS, VAB
KSC · 2008-07-23 · KSC-08pd2112
KSC-08pd2112
CAPE CANAVERAL, Fla. – This elevated view of Launch Pad 39A at NASA's Kennedy Space Center shows the steel grid structures, welded to the wall of the flame…
Inspect NASA record
CAPE CANAVERAL, Fla. – This elevated view of Launch Pad 39A at NASA's Kennedy Space Center shows the steel grid structures, welded to the wall of the flame trench, which workers will be filling with a heat-resistant concrete called Fondue Fyre, developed during NASA's Apollo lunar program. Damage to the trench occurred during the May 31 launch of Discovery on the STS-124 mission. A 75- by 20-foot section of the east wall was destroyed and debris scattered as far as the pad perimeter fence. Repairs are expected to be completed before the targeted Oct. 8 launch of Atlantis on the NASA Hubble Space Telescope servicing mission. Photo credit: NASA/Jack Pfaller
- Record ID
- KSC-08pd2112
- NASA center
- KSC
- Date
- 2008-07-23
- Keywords
- LC-39A,
KSC · 2026-08-06 · KSC-20260806-PH-RCR01_0010
Artemis III Launch Simulations (Terminal Count Sim)
A NASA jacket containing Artemis I and II mission patches, along with other NASA patches hangs on the back of a chair on Thursday, Aug. 6, 2026, inside…
Inspect NASA record
A NASA jacket containing Artemis I and II mission patches, along with other NASA patches hangs on the back of a chair on Thursday, Aug. 6, 2026, inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida during a terminal countdown simulation for the Artemis III mission. The terminal count simulation conducted by NASA’s Exploration Ground Systems team runs through the final five hours of launch countdown, including terminal count - the remaining 10 minutes of the countdown. Artemis III will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.
- Record ID
- KSC-20260806-PH-RCR01_0010
- NASA center
- KSC
- Date
- 2026-08-06
- Credit
- NASA/Clayton Rougelot
- Keywords
- Artemis, Artemis 3, Artemis III, Artemis launch team, Cape, Cape Canaveral, Firing Room 1, Firing Room 2, Florida, John F. Kennedy Space Center, KSC, Kennedy
HQ · 2023-06-13 · NHQ202306130011
Meeting with Western Cape Government’s Alan Winde
NASA International Program Specialist, Office of International and Interagency Relations, Greg Mann, provide remarks during a meeting with NASA Associate Administrator for the Space Operations Mission Directorate, Ken…
Inspect NASA record
NASA International Program Specialist, Office of International and Interagency Relations, Greg Mann, provide remarks during a meeting with NASA Associate Administrator for the Space Operations Mission Directorate, Ken Bowersox, NASA Deputy Associate Administrator for Space Communications and Navigation, Badri Younes, he Premier of the Western Cape Government, Alan Winde, and a delegation from South Africa, to discuss the path forward for development of an antenna for the Lunar Exploration Ground Sites (LEGS) mission in Matjiesfontein, South Africa, and other opportunities, Tuesday, June 13, 2023, at the Mary W. Jackson NASA Headquarters building in Washington. Photo Credit: (NASA/Aubrey Gemignani)
- Record ID
- NHQ202306130011
- NASA center
- HQ
- Date
- 2023-06-13
- Credit
- NASA/Aubrey Gemignani
- Keywords
- Alan Winde, Badri Younes, DC, Greg Mann, Harry Malila, Lunar Exploration Ground Sites (LEGS), Mary W. Jackson NASA Headquarters, South Africa, Space Operations Center (SOC), Washington, Wrenelle Stander
HQ · 2023-06-13 · NHQ202306130007
Meeting with Western Cape Government’s Alan Winde
NASA Deputy Associate Administrator for Space Communications and Navigation, Badri Younes, second from left, provides remarks during a meeting with the Premier of the Western Cape Government, Alan…
Inspect NASA record
NASA Deputy Associate Administrator for Space Communications and Navigation, Badri Younes, second from left, provides remarks during a meeting with the Premier of the Western Cape Government, Alan Winde, left, Director-General of the Western Cape Government, Dr. Harry Malila, third from left, and NASA Associate Administrator for the Space Operations Mission Directorate, Ken Bowersox, right, to discuss the path forward for development of an antenna for the Lunar Exploration Ground Sites (LEGS) mission in Matjiesfontein, South Africa, and other opportunities, Tuesday, June 13, 2023, at the Mary W. Jackson NASA Headquarters building in Washington. Photo Credit: (NASA/Aubrey Gemignani)
- Record ID
- NHQ202306130007
- NASA center
- HQ
- Date
- 2023-06-13
- Credit
- NASA/Aubrey Gemignani
- Keywords
- Alan Winde, Badri Younes, DC, Harry Malila, Ken Bowersox, Lunar Exploration Ground Sites (LEGS), Mary W. Jackson NASA Headquarters, South Africa, Space Operations Center (SOC), Washington
SSC · 2024-11-03 · SSC-20241119-s01152
NASA Attends Picayune Street Fair
NASA Stennis representatives engage with the Artemis Generation at the Picayune Street Fair in Picayune, Mississippi on Nov. 2-3. The south Mississippi NASA center is located less than…
Inspect NASA record
NASA Stennis representatives engage with the Artemis Generation at the Picayune Street Fair in Picayune, Mississippi on Nov. 2-3. The south Mississippi NASA center is located less than 15 miles from Picayune with many employees living in the community. NASA Stennis tests all RS-25 engines to help power NASA’s SLS (Space Launch System) rocket on Artemis missions. The NASA center is also preparing to conduct a full series of tests on the agency’s exploration upper stage to demonstrate it is ready to fly on future Artemis missions. With the Artemis campaign, NASA will land the first woman and the first person of color on the Moon, using innovative technologies to explore more of the lunar surface than ever.
- Record ID
- SSC-20241119-s01152
- NASA center
- SSC
- Date
- 2024-11-03
- Credit
- NASA Stennis
KSC · 2025-05-08 · KSC-20250508-PH-FMX01_0100
KSC-20250508-PH-FMX01_0100
Members of the Artemis launch team participate in an Artemis II launch countdown simulation inside Firing Room 1 in the Launch Control Center at NASA’s Kennedy Space Center…
Inspect NASA record
Members of the Artemis launch team participate in an Artemis II launch countdown simulation inside Firing Room 1 in the Launch Control Center at NASA’s Kennedy Space Center in Florida on Thursday, May 8, 2025. The simulations go through launch day scenarios to help launch team members test software and make adjustments if needed during countdown operations. Artemis II is the first crewed flight under NASA’s Artemis campaign and is another step toward missions on the lunar surface and helping the agency prepare for future human missions to Mars.
- Record ID
- KSC-20250508-PH-FMX01_0100
- NASA center
- KSC
- Date
- 2025-05-08
- Credit
- NASA/Frank Michaux
KSC · 2020-11-05 · KSC-20201105-PH-FMX01_0073
Kathy Lueders Visit to KSC
Kathy Lueders, associate administrator of NASA’s Human Exploration and Operations Mission Directorate, visits the Neil Armstrong Operations and Checkout Building high bay at the agency’s Kennedy Space Center…
Inspect NASA record
Kathy Lueders, associate administrator of NASA’s Human Exploration and Operations Mission Directorate, visits the Neil Armstrong Operations and Checkout Building high bay at the agency’s Kennedy Space Center in Florida on Nov. 5, 2020. In the background is the Orion spacecraft’s forward bay cover for Artemis I. The first in a series of increasingly complex missions, Artemis I will test the Space Launch System rocket and Orion spacecraft as an integrated system prior to crewed flights to the Moon. Under the Artemis program, NASA is planning to land the first woman and the next man on the lunar surface by 2024.
- Record ID
- KSC-20201105-PH-FMX01_0073
- NASA center
- KSC
- Date
- 2020-11-05
- Credit
- NASA/Frank Michaux
- Keywords
- Artemis, Artemis I, FAST cell, HEO, Kathy Lueders, O&C, Orion
KSC · 2025-05-08 · KSC-20250508-PH-FMX01_0096
KSC-20250508-PH-FMX01_0096
Members of the Artemis launch team participate in an Artemis II launch countdown simulation inside Firing Room 1 in the Launch Control Center at NASA’s Kennedy Space Center…
Inspect NASA record
Members of the Artemis launch team participate in an Artemis II launch countdown simulation inside Firing Room 1 in the Launch Control Center at NASA’s Kennedy Space Center in Florida on Thursday, May 8, 2025. The simulations go through launch day scenarios to help launch team members test software and make adjustments if needed during countdown operations. Artemis II is the first crewed flight under NASA’s Artemis campaign and is another step toward missions on the lunar surface and helping the agency prepare for future human missions to Mars.
- Record ID
- KSC-20250508-PH-FMX01_0096
- NASA center
- KSC
- Date
- 2025-05-08
- Credit
- NASA/Frank Michaux
KSC · 2026-06-22 · KSC-20260622-PH-AJN01_0257
Artemis III SLS Core Stage Weather Cover Arrival
Teams transport a weather cover for the Artemis III SLS (Space Launch System) rocket core stage from NASA’s Pegasus barge to the spaceport’s Vehicle Assembly Building at the…
Inspect NASA record
Teams transport a weather cover for the Artemis III SLS (Space Launch System) rocket core stage from NASA’s Pegasus barge to the spaceport’s Vehicle Assembly Building at the agency’s Kennedy Space Center in Florida on Monday, June 22, 2026. The cover will protect the stage’s thermal systems while SLS sits atop the mobile launcher at Launch Pad 39B in its short stack configuration. NASA will send four Artemis astronauts on increasingly difficult missions to explore more of the Moon for scientific discovery, economic benefits, establish an enduring human presence on the lunar surface, and to build on our foundation for the first crewed missions to Mars.
- Record ID
- KSC-20260622-PH-AJN01_0257
- NASA center
- KSC
- Date
- 2026-06-22
- Credit
- NASA/Amber Jean Notvest
- Keywords
- Artemis, Artemis III, KSC, Kennedy Space Center, Moon, Pegasus barge, SLS, Space Launch System, Turn Basin, VAB, Vehicle Assembly Building, rocket