Update Site (from NASA)
Explore NASA’s Image and Video Library.
Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.
Sign in to suggest a Marvel.
Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.
NASA image records
KSC · 2025-05-01 · KSC-20250501-PH-CSH01_0193
Artemis II Presentation and Group Photos
Teams with NASA’s Exploration Ground Systems, Orion, and Lockheed Martin participate in a handover ceremony of NASA’s Artemis II Orion spacecraft to crews with the agency’s Exploration Ground…
Inspect NASA record
Teams with NASA’s Exploration Ground Systems, Orion, and Lockheed Martin participate in a handover ceremony of NASA’s Artemis II Orion spacecraft to crews with the agency’s Exploration Ground Systems Program at the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Thursday, May 1, 2025. The spacecraft will be transported to the Multi-Payload Processing Facility to undergo fueling and processing for prelaunch operations. The Artemis II test flight is the first crewed flight under NASA’s Artemis campaign and is another step toward missions on the lunar surface and helping the agency prepare for future human missions to Mars.
- Record ID
- KSC-20250501-PH-CSH01_0193
- NASA center
- KSC
- Date
- 2025-05-01
- Credit
- NASA/Cory S Huston
- Keywords
- Orion, Artemis II, spacecraft, DD250, lockheed martin, EGS, MPPF, O&C
KSC · 2026-06-22 · KSC-20260622-PH-AJN01_0031
Artemis III SLS Core Stage Weather Cover Arrival
NASA’s Pegasus barge carrying a weather cover for the Artemis III SLS (Space Launch System) rocket core stage, arrives Sunday, June 21, 2026, at the Launch Complex 39…
Inspect NASA record
NASA’s Pegasus barge carrying a weather cover for the Artemis III SLS (Space Launch System) rocket core stage, arrives Sunday, June 21, 2026, at the Launch Complex 39 turn basin at the agency’s Kennedy Space Center in Florida. The cover will protect the stage’s thermal systems while SLS sits atop the mobile launcher at Launch Pad 39B in its short stack configuration. NASA will send four Artemis astronauts on increasingly difficult missions to explore more of the Moon for scientific discovery, economic benefits, establish an enduring human presence on the lunar surface, and to build on our foundation for the first crewed missions to Mars.
- Record ID
- KSC-20260622-PH-AJN01_0031
- NASA center
- KSC
- Date
- 2026-06-22
- Credit
- NASA/Amber Jean Notvest
- Keywords
- Artemis, Artemis III, KSC, Kennedy Space Center, Moon, Pegasus barge, SLS, Space Launch System, Turn Basin, VAB, Vehicle Assembly Building, rocket
HQ · 2023-11-07 · NHQ202311070002
Deputy Administrator at COSMIC Workshop
Prasun Desai, acting associate administrator for NASA's Space Technology Mission Directorate, delivers opening remarks at the Consortium for Space Mobility and ISAM Capabilities (COSMIC) workshop, Tuesday, Nov. 7,…
Inspect NASA record
Prasun Desai, acting associate administrator for NASA's Space Technology Mission Directorate, delivers opening remarks at the Consortium for Space Mobility and ISAM Capabilities (COSMIC) workshop, Tuesday, Nov. 7, 2023, at the University of Maryland in College Park, Md. NASA’s Space Technology Mission Directorate formulated and funds COSMIC, aiming to create a nationwide aerospace community alliance that provides global leadership in space mobility and in-space servicing, assembly, and manufacturing (ISAM) for use in Earth orbit, lunar orbit, deep space, and on planetary surfaces. Photo Credit: (NASA/Joel Kowsky)
- Record ID
- NHQ202311070002
- NASA center
- HQ
- Date
- 2023-11-07
- Credit
- NASA/Joel Kowsky
- Keywords
- College Park, Consortium ofr Space Mobility and ISAM Capabilities (COSMIC), MD, Maryland, Prasun Desai, University of Maryland
SSC · 2024-11-19 · SSC-20241119-s01150
NASA Attends Picayune Street Fair
NASA Stennis representatives engage with the Artemis Generation at the Picayune Street Fair in Picayune, Mississippi on Nov. 2-3. The south Mississippi NASA center is located less than…
Inspect NASA record
NASA Stennis representatives engage with the Artemis Generation at the Picayune Street Fair in Picayune, Mississippi on Nov. 2-3. The south Mississippi NASA center is located less than 15 miles from Picayune with many employees living in the community. NASA Stennis tests all RS-25 engines to help power NASA’s SLS (Space Launch System) rocket on Artemis missions. The NASA center is also preparing to conduct a full series of tests on the agency’s exploration upper stage to demonstrate it is ready to fly on future Artemis missions. With the Artemis campaign, NASA will land the first woman and the first person of color on the Moon, using innovative technologies to explore more of the lunar surface than ever.
- Record ID
- SSC-20241119-s01150
- NASA center
- SSC
- Date
- 2024-11-19
- Credit
- NASA Stennis
HQ · 2023-11-07 · NHQ202311070003
Deputy Administrator at COSMIC Workshop
Prasun Desai, acting associate administrator for NASA's Space Technology Mission Directorate, delivers opening remarks at the Consortium for Space Mobility and ISAM Capabilities (COSMIC) workshop, Tuesday, Nov. 7,…
Inspect NASA record
Prasun Desai, acting associate administrator for NASA's Space Technology Mission Directorate, delivers opening remarks at the Consortium for Space Mobility and ISAM Capabilities (COSMIC) workshop, Tuesday, Nov. 7, 2023, at the University of Maryland in College Park, Md. NASA’s Space Technology Mission Directorate formulated and funds COSMIC, aiming to create a nationwide aerospace community alliance that provides global leadership in space mobility and in-space servicing, assembly, and manufacturing (ISAM) for use in Earth orbit, lunar orbit, deep space, and on planetary surfaces. Photo Credit: (NASA/Joel Kowsky)
- Record ID
- NHQ202311070003
- NASA center
- HQ
- Date
- 2023-11-07
- Credit
- NASA/Joel Kowsky
- Keywords
- College Park, Consortium ofr Space Mobility and ISAM Capabilities (COSMIC), MD, Maryland, Prasun Desai, University of Maryland
KSC · 2021-10-04 · KSC-20211004-PH-JBS01_0009
OSA Arrival in VAB High Bay 4
Under a protective cover, the Orion Stage Adapter (OSA) arrives in High Bay 4 of the Vehicle Assembly Building on Oct. 4, 2021, at NASA's Kennedy Space Center…
Inspect NASA record
Under a protective cover, the Orion Stage Adapter (OSA) arrives in High Bay 4 of the Vehicle Assembly Building on Oct. 4, 2021, at NASA's Kennedy Space Center in Florida. Teams will lift the ring-shaped OSA, filled with shoebox-sized CubeSats, and connect it to the Interim Cryogenic Propulsion Stage (ICPS). The Orion spacecraft will be secured on top of the Space Launch System (SLS) rocket to complete the stack ahead of the Artemis I launch. This mission will be the first integrated flight test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20211004-PH-JBS01_0009
- NASA center
- KSC
- Date
- 2021-10-04
- Credit
- NASA/Ben Smegelsky
- Keywords
- Artemis, Artemis I, EGS, OSA, Orion, SLS, VAB
KSC · 2018-01-11 · KSC-20180111-PH_FWM01_0124
KSC All Hands
Russ DeLoach, director of Safety and Mission Assurance, speaks to Kennedy Space Center employees about plans for the coming year. The event took place in the Lunar Theater…
Inspect NASA record
Russ DeLoach, director of Safety and Mission Assurance, speaks to Kennedy Space Center employees about plans for the coming year. The event took place in the Lunar Theater at the Kennedy Space Center Visitor Complex’s Apollo Saturn V Center. The year will be highlighted with NASA's partners preparing test flights for crewed missions to the International Space Station as part of the agency's Commercial Crew Program and six launches by the Launch Services Program. Exploration Ground Systems will be completing facilities to support the Space Launch System rocket and Orion spacecraft. Exploration Research and Technology Programs will continue to provide supplies to the space station launched as part of the Commercial Resupply Services effort.
- Record ID
- KSC-20180111-PH_FWM01_0124
- NASA center
- KSC
- Date
- 2018-01-11
- Credit
- NASA/ Frank Michaux
- Keywords
- Kennedy Space Center, Center Director, Launch Services Program, LSP, Commercial Crew Program, CCP, Exploration Ground Systems, EGS, Exploration Research and Technology
JSC · 2026-04-07 · art002e013356
Four Thumbs Up
art002e013356 (April 7, 2026) – The Artemis II crew – (from left) Mission Specialist Christina Koch, Mission Specialist Jeremy Hansen, Pilot Victor Glover, and Commander Reid Wiseman –…
Inspect NASA record
art002e013356 (April 7, 2026) – The Artemis II crew – (from left) Mission Specialist Christina Koch, Mission Specialist Jeremy Hansen, Pilot Victor Glover, and Commander Reid Wiseman – pause for a group photo inside the Orion spacecraft on their way home. Following a swing around the far side of the Moon on April 6, 2026, the crew exited the lunar sphere of influence (the point at which the Moon's gravity has a stronger pull on Orion than the Earth's) on April 7, and are headed back to Earth for a splashdown in the Pacific Ocean on April 10.
- Record ID
- art002e013356
- NASA center
- JSC
- Date
- 2026-04-07
- Credit
- NASA
- Keywords
- Artemis II, Artemis II mission, Artemis 2 mission, Artemis II crew
KSC · 2026-06-22 · KSC-20260622-PH-AJN01_0117
Artemis III SLS Core Stage Weather Cover Arrival
NASA’s Pegasus barge carrying a weather cover for the Artemis III SLS (Space Launch System) rocket core stage, arrives Sunday, June 21, 2026, at the Launch Complex 39…
Inspect NASA record
NASA’s Pegasus barge carrying a weather cover for the Artemis III SLS (Space Launch System) rocket core stage, arrives Sunday, June 21, 2026, at the Launch Complex 39 turn basin at the agency’s Kennedy Space Center in Florida. The cover will protect the stage’s thermal systems while SLS sits atop the mobile launcher at Launch Pad 39B in its short stack configuration. NASA will send four Artemis astronauts on increasingly difficult missions to explore more of the Moon for scientific discovery, economic benefits, establish an enduring human presence on the lunar surface, and to build on our foundation for the first crewed missions to Mars.
- Record ID
- KSC-20260622-PH-AJN01_0117
- NASA center
- KSC
- Date
- 2026-06-22
- Credit
- NASA/Amber Jean Notvest
- Keywords
- Artemis, Artemis III, KSC, Kennedy Space Center, Moon, Pegasus barge, SLS, Space Launch System, Turn Basin, VAB, Vehicle Assembly Building, rocket
KSC · 2026-08-05 · KSC-20260805-PH-CSH01_0056
Artemis III Launch Simulation
Artemis launch team members participate in a cryogenic propellant loading simulation for NASA’s Artemis III mission on Wednesday, Aug. 5, 2026, inside Firing Rooms 1 and 2 of…
Inspect NASA record
Artemis launch team members participate in a cryogenic propellant loading simulation for NASA’s Artemis III mission on Wednesday, Aug. 5, 2026, inside Firing Rooms 1 and 2 of the Rocco A. Petrone Launch Control Center at the agency’s Kennedy Space Center in Florida. Members of NASA’s Exploration Ground Systems team rehearse the steps to load the super-cooled liquid hydrogen and liquid oxygen into the SLS (Space Launch System) rocket core stage, a process that starts several hours before liftoff for the Artemis III mission. Artemis III will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.
- Record ID
- KSC-20260805-PH-CSH01_0056
- NASA center
- KSC
- Date
- 2026-08-05
- Credit
- NASA/Cory Huston
- Keywords
- Artemis, Artemis 3, Artemis III, Artemis launch, Cape Canaveral, Center, Firing Room 1, Firing Room 2, Florida, John F. Kennedy Space Center, KSC, Kennedy
HQ · 2011-08-25 · 201108250007HQ
GRAIL Mission Briefing
Jim Green (left), director, Planetary Science Division at NASA Headquarters, speaks at a press conference about the upcoming launch to the moon of the Gravity Recovery and Interior…
Inspect NASA record
Jim Green (left), director, Planetary Science Division at NASA Headquarters, speaks at a press conference about the upcoming launch to the moon of the Gravity Recovery and Interior Laboratory (GRAIL) mission, Thursday, Aug. 25, 2011 in Washington. GRAIL's primary science objectives are to determine the structure of the lunar interior, from crust to core, and to advance understanding of the thermal evolution of the moon. The mission will place two spacecraft into the same orbit around the moon which will gather information about the its gravitational field enabling scientists to create a high-resolution map. Photo Credit: (NASA/Carla Cioffi)
- Record ID
- 201108250007HQ
- NASA center
- HQ
- Date
- 2011-08-25
- Credit
- NASA/Carla Cioffi
- Keywords
- Gravity Recovery and Interior Laboratory (GRAIL), Moon, NASA Headquarters, Jim Green, Maria Zuber, Washington, DC, GRAIL (Gravity Recovery and Interior Laboratory)
KSC · 2022-06-10 · KSC-20220610-PH-NAS01_0004
Lightning Strikes at Pad 39B
A lightning strike was recorded at Launch Complex 39B at NASA’s Kennedy Space Center in Florida on June 10, 2022. NASA’s Space Launch System (SLS) and Orion spacecraft…
Inspect NASA record
A lightning strike was recorded at Launch Complex 39B at NASA’s Kennedy Space Center in Florida on June 10, 2022. NASA’s Space Launch System (SLS) and Orion spacecraft atop the mobile launcher are on the launch pad in preparation for the Artemis I mission. The lightning strike was recorded by cameras stationed at the pad and mobile launcher using a special filter called a “clear day frame,” which provides an overlay of the raw frame on a reference image. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first woman of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220610-PH-NAS01_0004
- NASA center
- KSC
- Date
- 2022-06-10
- Credit
- NASA
- Keywords
- Lightning, Lightning Strikes, Weather, KSC, Kennedy Space Center, LC-39B, LC 39B, Pad 39B, Launch Complex 39B