Interstellar Minds

‹ Interstellar Minds

Update Site (from NASA)

Explore NASA’s Image and Video Library.

Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.

Sign in to suggest a Marvel.

Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.

NASA image records

NASA Underway Recovery Test 12 (URT-12)

KSC · 2025-03-25 · KSC-20250325-PH-END01_0001

NASA Underway Recovery Test 12 (URT-12)

Vice Adm. John F. G. Wade, commander of U.S. 3rd Fleet, speaks with NASA astronaut Stan Love inside an Orion crew module test article in the well deck…

Inspect NASA record

Vice Adm. John F. G. Wade, commander of U.S. 3rd Fleet, speaks with NASA astronaut Stan Love inside an Orion crew module test article in the well deck of amphibious transport dock USS Somerset (LPD 25) ahead of NASA Underway Recovery Test 12 on Naval Base San Diego, March 25, 2025. In preparation for NASA's Artemis II crewed mission, which will send four astronauts around the Moon and beyond in the Orion spacecraft, NASA and the Department of Defense will conduct a series of tests to demonstrate and evaluate the processes, procedures, and hardware used in recovery operations for crewed lunar missions.

Record ID
KSC-20250325-PH-END01_0001
NASA center
KSC
Date
2025-03-25
Credit
U.S. Navy photo by Mass Communications 2nd Class Evan Diaz
Keywords
Artemis, Artemis II, URT-12, Underway Recovery Test 12, Stan Love, EGS
Artemis III Launch Simulation

KSC · 2026-08-05 · KSC-20260805-PH-CSH01_0101

Artemis III Launch Simulation

Artemis launch team members participate in a cryogenic propellant loading simulation for NASA’s Artemis III mission on Wednesday, Aug. 5, 2026, inside Firing Rooms 1 and 2 of…

Inspect NASA record

Artemis launch team members participate in a cryogenic propellant loading simulation for NASA’s Artemis III mission on Wednesday, Aug. 5, 2026, inside Firing Rooms 1 and 2 of the Rocco A. Petrone Launch Control Center at the agency’s Kennedy Space Center in Florida. Members of NASA’s Exploration Ground Systems team rehearse the steps to load the super-cooled liquid hydrogen and liquid oxygen into the SLS (Space Launch System) rocket core stage, a process that starts several hours before liftoff for the Artemis III mission. Artemis III will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.

Record ID
KSC-20260805-PH-CSH01_0101
NASA center
KSC
Date
2026-08-05
Credit
NASA/Cory Huston
Keywords
Artemis, Artemis 3, Artemis III, Artemis launch, Cape Canaveral, Center, Firing Room 1, Firing Room 2, Florida, John F. Kennedy Space Center, KSC, Kennedy
Space Symposium - JAXA Bi-lateral Meeting

HQ · 2019-04-08 · NHQ201904080010

Space Symposium - JAXA Bi-lateral Meeting

NASA Administrator Jim Bridenstine, fifth from left, speaks with Japan Aerospace Exploration Agency (JAXA) President, Hiroshi Yamakawa, second from right, about opportunities to work together in human and…

Inspect NASA record

NASA Administrator Jim Bridenstine, fifth from left, speaks with Japan Aerospace Exploration Agency (JAXA) President, Hiroshi Yamakawa, second from right, about opportunities to work together in human and robotic exploration at the lunar surface and around the Moon, at the Space Symposium, Monday, April 8, 2019 in Colorado Springs, Colorado. They also discussed the two agencies’ asteroid sample return missions, OSIRIS-REx AND Hayabusa-2, and how they are looking forward to sharing the data and results from those missions. Photo Credit: (NASA/Aubrey Gemignani)

Record ID
NHQ201904080010
NASA center
HQ
Date
2019-04-08
Credit
NASA/Aubrey Gemignani
Keywords
Broadmoor Hotel, Colorado, Colorado Springs, Hiroshi Yamakawa, Japan Aerospace Exploration Agency (JAXA), Jim Bridenstine, NASA Administrator, Space Symposium
Artemis II Cryo Simulation

KSC · 2025-05-07 · KSC-20250507-PH-KLS01_0136

Artemis II Cryo Simulation

Members of the Artemis launch team participate in an Artemis II launch countdown simulation inside Firing Room 1 in the Launch Control Center at NASA’s Kennedy Space Center…

Inspect NASA record

Members of the Artemis launch team participate in an Artemis II launch countdown simulation inside Firing Room 1 in the Launch Control Center at NASA’s Kennedy Space Center in Florida on Wednesday, May 7, 2025. The simulations go through launch day scenarios to help launch team members test software and make adjustments if needed during countdown operations. Artemis II is the first crewed flight under NASA’s Artemis campaign and is another step toward missions on the lunar surface and helping the agency prepare for future human missions to Mars.

Record ID
KSC-20250507-PH-KLS01_0136
NASA center
KSC
Date
2025-05-07
Credit
NASA/Kim Shiflett
Keywords
Artemis II, Artemis Launch team, Cape Canaveral, Firing Room 1, Florida, John. F. Kennedy Space Center, KSC, Kennedy, Kennedy Space Center, Launch Control Center, NASA, Spaceport
View of Mission Control Center during Apollo 13 splashdown

JSC · 2018-03-29 · s70-35148

View of Mission Control Center during Apollo 13 splashdown

S70-35148 (17 April 1970) --- Staff members from NASA Headquarters (NASA HQ), Manned Spacecraft Center (MSC), and Dr. Thomas Paine (center of frame) applaud the successful splashdown of…

Inspect NASA record

S70-35148 (17 April 1970) --- Staff members from NASA Headquarters (NASA HQ), Manned Spacecraft Center (MSC), and Dr. Thomas Paine (center of frame) applaud the successful splashdown of the Apollo 13 mission while Dr. George Low smokes a cigar (right), in the MSC Mission Control Center (MCC), located in Building 30. Apollo 13 crewmembers, astronauts James A. Lovell Jr., commander; John L. Swigert Jr., command module pilot; and Fred W. Haise Jr., lunar module pilot, splashed down at 12:07:44 p.m. (CST), April 17, 1970, in the south Pacific Ocean.

Record ID
s70-35148
NASA center
JSC
Date
2018-03-29
KSC-08pd2117

KSC · 2008-07-23 · KSC-08pd2117

KSC-08pd2117

CAPE CANAVERAL, Fla. – At Launch Pad 39A at NASA's Kennedy Space Center, workers spray a heat-resistant concrete called Fondue Fyre into steel grid structures, welded to the…

Inspect NASA record

CAPE CANAVERAL, Fla. – At Launch Pad 39A at NASA's Kennedy Space Center, workers spray a heat-resistant concrete called Fondue Fyre into steel grid structures, welded to the wall of the flame trench. Fondue Fyre was developed during NASA's Apollo lunar program. Damage to the trench occurred during the May 31 launch of Discovery on the STS-124 mission. A 75- by 20-foot section of the east wall was destroyed and debris scattered as far as the pad perimeter fence. Repairs are expected to be completed before the targeted Oct. 8 launch of Atlantis on the NASA Hubble Space Telescope servicing mission. Photo credit: NASA/Jack Pfaller

Record ID
KSC-08pd2117
NASA center
KSC
Date
2008-07-23
Keywords
LC-39A,
Artemis II Crew Lunar Observations Training -- jsc2025e064796

JSC · 2025-07-16 · jsc2025e064796

Artemis II Crew Lunar Observations Training -- jsc2025e064796

jsc2025e064796 --- NASA astronaut and Artemis II commander, Reid Wiseman, foreground, and CSA (Canadian Space Agency) astronaut Jeremy Hansen, mission specialist for NASA’s Artemis II mission, participate in…

Inspect NASA record

jsc2025e064796 --- NASA astronaut and Artemis II commander, Reid Wiseman, foreground, and CSA (Canadian Space Agency) astronaut Jeremy Hansen, mission specialist for NASA’s Artemis II mission, participate in crew lunar observations training in the Orion mockup at NASA's Johnson Space Center in Houston. The Artemis II crew will be the first people in more than 50 years to set eyes on the far side of the Moon, depending on illumination conditions. They will document their observations through photographs, audio recordings, and more to inform our understanding of the Moon, and share their experience of being far from Earth.

Record ID
jsc2025e064796
NASA center
JSC
Date
2025-07-16
Credit
James Blair - NASA - JSC
KSC-01PP-1031

KSC · 2001-05-25 · 01pp1031

KSC-01PP-1031

KENNEDY SPACE CENTER, FLA. -- Four solid rocket boosters are lifted up the gantry at Launch Complex 17-B, Cape Canaveral Air Force Station. The SRBs will be mated…

Inspect NASA record

KENNEDY SPACE CENTER, FLA. -- Four solid rocket boosters are lifted up the gantry at Launch Complex 17-B, Cape Canaveral Air Force Station. The SRBs will be mated to the Delta II rocket that will launch the MAP instrument into a lunar-assisted trajectory to the Sun-Earth for a 27-month mission. The MAP mission will examine conditions in the early universe by measuring temperature differences in cosmic microwave background radiation, which is the radiant heat left over from the Big Bang. The properties of this radiation directly reflect conditions in the early universe. MAP is scheduled to launch June 30 at 3:46:46 p.m. EDT

Record ID
01pp1031
NASA center
KSC
Date
2001-05-25
Credit
NASA or National Aeronautics and Space Administration
GRAIL Mission Briefing

HQ · 2011-08-25 · 201108250004HQ

GRAIL Mission Briefing

Maria Zuber, GRAIL principal investigator, Massachusetts Institute of Technology, Cambridge, answers a reporter's question at a press briefing about the upcoming launch to the moon of the Gravity…

Inspect NASA record

Maria Zuber, GRAIL principal investigator, Massachusetts Institute of Technology, Cambridge, answers a reporter's question at a press briefing about the upcoming launch to the moon of the Gravity Recovery and Interior Laboratory (GRAIL) mission, Thursday, Aug. 25, 2011 in Washington. GRAIL's primary science objectives are to determine the structure of the lunar interior, from crust to core, and to advance understanding of the thermal evolution of the moon. The mission will place two spacecraft into the same orbit around the moon which will gather information about the its gravitational field enabling scientists to create a high-resolution map. Photo Credit: (NASA/Carla Cioffi)

Record ID
201108250004HQ
NASA center
HQ
Date
2011-08-25
Credit
NASA/Carla Cioffi
Keywords
Gravity Recovery and Interior Laboratory (GRAIL), Maria Zuber, Moon, NASA Headquarters, Washington, DC, GRAIL (Gravity Recovery and Interior Laboratory)
Core Stage Lift to Vertical for Move to High Bay 3

KSC · 2025-03-22 · KSC-20250323-PH-FMX01_0110

Core Stage Lift to Vertical for Move to High Bay 3

Teams with NASA’s Exploration Ground Systems and primary contractor Amentum, use a massive crane to lift to vertical the SLS (Space Launch System) Moon rocket for Artemis II…

Inspect NASA record

Teams with NASA’s Exploration Ground Systems and primary contractor Amentum, use a massive crane to lift to vertical the SLS (Space Launch System) Moon rocket for Artemis II on Saturday, March 22, 2025, inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida. The move from the facility’s transfer aisle into High Bay 3 allows technicians to integrate the 212-foot-tall core stage with the stacked solid rocket boosters onto mobile launcher 1. Artemis II is the first crewed test flight under NASA’s Artemis campaign and is another step toward missions on the lunar surface and helping the agency prepare for future human missions to Mars.

Record ID
KSC-20250323-PH-FMX01_0110
NASA center
KSC
Date
2025-03-22
Credit
NASA/Frank Michaux
Keywords
John. F. Kennedy Space Center, Kennedy, Kennedy Space Center, KSC, Spaceport, Cape Canaveral, NASA, rocket ranch, Florida, multi-user spaceport, premier spaceport, space coast
Artemis III Launch Simulation, Cryo Sim, LCC Firing Rooms 1 & 2

KSC · 2026-09-09 · KSC-20260909-PH-RCR01_0052

Artemis III Launch Simulation, Cryo Sim, LCC Firing Rooms 1 & 2

Artemis launch team members participate in a cryogenic propellant loading simulation for NASA’s Artemis III mission on Wednesday, Sept. 9, 2026, inside Firing Rooms 1 and 2 of…

Inspect NASA record

Artemis launch team members participate in a cryogenic propellant loading simulation for NASA’s Artemis III mission on Wednesday, Sept. 9, 2026, inside Firing Rooms 1 and 2 of the Rocco A. Petrone Launch Control Center at the agency’s Kennedy Space Center in Florida. Members of NASA’s Exploration Ground Systems team rehearse the steps to load the super-cooled liquid hydrogen and liquid oxygen into the SLS (Space Launch System) rocket core stage, a process that starts several hours before liftoff for the Artemis III mission. Artemis III will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.

Record ID
KSC-20260909-PH-RCR01_0052
NASA center
KSC
Date
2026-09-09
Credit
NASA/Clayton Rougelot
Keywords
Artemis launch team, Artemis, Artemis III, Artemis 3, Firing Room 1, Firing Room 2, Launch Control Center, Kennedy Space Center, Exploration Ground Systems, EGS, LCC, launch simulations
Artemis III Launch Simulation

KSC · 2026-08-05 · KSC-20260805-PH-CSH01_0098

Artemis III Launch Simulation

Artemis launch team members participate in a cryogenic propellant loading simulation for NASA’s Artemis III mission on Wednesday, Aug. 5, 2026, inside Firing Rooms 1 and 2 of…

Inspect NASA record

Artemis launch team members participate in a cryogenic propellant loading simulation for NASA’s Artemis III mission on Wednesday, Aug. 5, 2026, inside Firing Rooms 1 and 2 of the Rocco A. Petrone Launch Control Center at the agency’s Kennedy Space Center in Florida. Members of NASA’s Exploration Ground Systems team rehearse the steps to load the super-cooled liquid hydrogen and liquid oxygen into the SLS (Space Launch System) rocket core stage, a process that starts several hours before liftoff for the Artemis III mission. Artemis III will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.

Record ID
KSC-20260805-PH-CSH01_0098
NASA center
KSC
Date
2026-08-05
Credit
NASA/Cory Huston
Keywords
Artemis, Artemis 3, Artemis III, Artemis launch, Cape Canaveral, Center, Firing Room 1, Firing Room 2, Florida, John F. Kennedy Space Center, KSC, Kennedy