Interstellar Minds

‹ Interstellar Minds

Update Site (from NASA)

Explore NASA’s Image and Video Library.

Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.

Sign in to suggest a Marvel.

Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.

NASA image records

GRAIL Mission Briefing

HQ · 2011-08-25 · 201108250001HQ

GRAIL Mission Briefing

Jim Green, director, Planetary Science Division at NASA Headquarters, speaks at a press conference about the upcoming launch to the moon of the Gravity Recovery and Interior Laboratory…

Inspect NASA record

Jim Green, director, Planetary Science Division at NASA Headquarters, speaks at a press conference about the upcoming launch to the moon of the Gravity Recovery and Interior Laboratory (GRAIL) mission, Thursday, Aug. 25, 2011 in Washington. GRAIL's primary science objectives are to determine the structure of the lunar interior, from crust to core, and to advance understanding of the thermal evolution of the moon. The mission will place two spacecraft into the same orbit around the moon which will gather information about the its gravitational field enabling scientists to create a high-resolution map. Photo Credit: (NASA/Carla Cioffi)

Record ID
201108250001HQ
NASA center
HQ
Date
2011-08-25
Credit
NASA/Carla Cioffi
Keywords
Gravity Recovery and Interior Laboratory (GRAIL), Jim Green, Moon, NASA Headquarters, Washington, DC, GRAIL (Gravity Recovery and Interior Laboratory)
Artemis III SLS Core Stage Weather Cover Arrival

KSC · 2026-06-22 · KSC-20260622-PH-AJN01_0399

Artemis III SLS Core Stage Weather Cover Arrival

Teams transport a weather cover for the Artemis III SLS (Space Launch System) rocket core stage from NASA’s Pegasus barge to the spaceport’s Vehicle Assembly Building at the…

Inspect NASA record

Teams transport a weather cover for the Artemis III SLS (Space Launch System) rocket core stage from NASA’s Pegasus barge to the spaceport’s Vehicle Assembly Building at the agency’s Kennedy Space Center in Florida on Monday, June 22, 2026. The cover will protect the stage’s thermal systems while SLS sits atop the mobile launcher at Launch Pad 39B in its short stack configuration. NASA will send four Artemis astronauts on increasingly difficult missions to explore more of the Moon for scientific discovery, economic benefits, establish an enduring human presence on the lunar surface, and to build on our foundation for the first crewed missions to Mars.

Record ID
KSC-20260622-PH-AJN01_0399
NASA center
KSC
Date
2026-06-22
Credit
NASA/Amber Jean Notvest
Keywords
Artemis, Artemis III, KSC, Kennedy Space Center, Moon, Pegasus barge, SLS, Space Launch System, Turn Basin, VAB, Vehicle Assembly Building, rocket
Artemis III SLS Core Stage Weather Cover Arrival at KSC

KSC · 2026-06-21 · KSC-20260621-PH-AJN02_0061

Artemis III SLS Core Stage Weather Cover Arrival at KSC

NASA’s Pegasus barge carrying a weather cover for the Artemis III SLS (Space Launch System) rocket core stage arrives Sunday, June 21, 2026, at the Launch Complex 39…

Inspect NASA record

NASA’s Pegasus barge carrying a weather cover for the Artemis III SLS (Space Launch System) rocket core stage arrives Sunday, June 21, 2026, at the Launch Complex 39 turn basin at the agency’s Kennedy Space Center in Florida. The cover will protect the stage’s thermal systems while SLS sits atop the mobile launcher at Launch Pad 39B in its short stack configuration. NASA will send four Artemis astronauts on increasingly difficult missions to explore more of the Moon for scientific discovery, economic benefits, establish an enduring human presence on the lunar surface, and to build on our foundation for the first crewed missions to Mars.

Record ID
KSC-20260621-PH-AJN02_0061
NASA center
KSC
Date
2026-06-21
Credit
NASA/Amber Jean Notvest
Keywords
Artemis, Artemis III, KSC, Kennedy Space Center, Moon, Pegasus barge, SLS, Space Launch System, Turn Basin, VAB, Vehicle Assembly Building, rocket
Artemis III SLS Core Stage Weather Cover Arrival

KSC · 2026-06-22 · KSC-20260622-PH-AJN01_0045

Artemis III SLS Core Stage Weather Cover Arrival

NASA’s Pegasus barge carrying a weather cover for the Artemis III SLS (Space Launch System) rocket core stage, arrives Sunday, June 21, 2026, at the Launch Complex 39…

Inspect NASA record

NASA’s Pegasus barge carrying a weather cover for the Artemis III SLS (Space Launch System) rocket core stage, arrives Sunday, June 21, 2026, at the Launch Complex 39 turn basin at the agency’s Kennedy Space Center in Florida. The cover will protect the stage’s thermal systems while SLS sits atop the mobile launcher at Launch Pad 39B in its short stack configuration. NASA will send four Artemis astronauts on increasingly difficult missions to explore more of the Moon for scientific discovery, economic benefits, establish an enduring human presence on the lunar surface, and to build on our foundation for the first crewed missions to Mars.

Record ID
KSC-20260622-PH-AJN01_0045
NASA center
KSC
Date
2026-06-22
Credit
NASA/Amber Jean Notvest
Keywords
Artemis, Artemis III, KSC, Kennedy Space Center, Moon, Pegasus barge, SLS, Space Launch System, Turn Basin, VAB, Vehicle Assembly Building, rocket
Lightning Strikes at Pad 39B

KSC · 2022-09-12 · KSC-20220912-PH-NAS01_0001

Lightning Strikes at Pad 39B

A lightning strike was recorded at Launch Complex 39B at NASA’s Kennedy Space Center in Florida on Sept. 12, 2022. NASA’s Space Launch System (SLS) and Orion spacecraft…

Inspect NASA record

A lightning strike was recorded at Launch Complex 39B at NASA’s Kennedy Space Center in Florida on Sept. 12, 2022. NASA’s Space Launch System (SLS) and Orion spacecraft atop the mobile launcher are in view on the launch pad in preparation for the Artemis I mission. The lightning strike was recorded by cameras stationed at the pad and mobile launcher using a special filter called a “clear day frame,” which provides an overlay of the raw frame on a reference image. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first woman of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220912-PH-NAS01_0001
NASA center
KSC
Date
2022-09-12
Credit
NASA
Keywords
Lightning, Lightning Strikes, Weather, KSC, Kennedy Space Center, LC-39B, LC 39B, Pad 39B, Launch Complex 39B
Artemis III Launch Simulation, Cryo Sim, LCC Firing Rooms 1 & 2

KSC · 2026-09-09 · KSC-20260909-PH-RCR01_0158

Artemis III Launch Simulation, Cryo Sim, LCC Firing Rooms 1 & 2

Artemis launch team members participate in a cryogenic propellant loading simulation for NASA’s Artemis III mission on Wednesday, Sept. 9, 2026, inside Firing Rooms 1 and 2 of…

Inspect NASA record

Artemis launch team members participate in a cryogenic propellant loading simulation for NASA’s Artemis III mission on Wednesday, Sept. 9, 2026, inside Firing Rooms 1 and 2 of the Rocco A. Petrone Launch Control Center at the agency’s Kennedy Space Center in Florida. Members of NASA’s Exploration Ground Systems team rehearse the steps to load the super-cooled liquid hydrogen and liquid oxygen into the SLS (Space Launch System) rocket core stage, a process that starts several hours before liftoff for the Artemis III mission. Artemis III will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.

Record ID
KSC-20260909-PH-RCR01_0158
NASA center
KSC
Date
2026-09-09
Credit
NASA/Clayton Rougelot
Keywords
Artemis launch team, Artemis, Artemis III, Artemis 3, Firing Room 1, Firing Room 2, Launch Control Center, Kennedy Space Center, Exploration Ground Systems, EGS, LCC, launch simulations
KSC-08pd2115

KSC · 2008-07-23 · KSC-08pd2115

KSC-08pd2115

CAPE CANAVERAL, Fla. – At Launch Pad 39A at NASA's Kennedy Space Center, workers on a platform spray a heat-resistant concrete called Fondue Fyre into steel grid structures,…

Inspect NASA record

CAPE CANAVERAL, Fla. – At Launch Pad 39A at NASA's Kennedy Space Center, workers on a platform spray a heat-resistant concrete called Fondue Fyre into steel grid structures, welded to the wall of the flame trench. Fondue Fyre was developed during NASA's Apollo lunar program. Damage to the trench occurred during the May 31 launch of Discovery on the STS-124 mission. A 75- by 20-foot section of the east wall was destroyed and debris scattered as far as the pad perimeter fence. Repairs are expected to be completed before the targeted Oct. 8 launch of Atlantis on the NASA Hubble Space Telescope servicing mission. Photo credit: NASA/Jack Pfaller

Record ID
KSC-08pd2115
NASA center
KSC
Date
2008-07-23
Keywords
LC-39A,
Artemis III Launch Simulation, Cryo Sim, LCC Firing Rooms 1 & 2

KSC · 2026-09-09 · KSC-20260909-PH-RCR01_0244

Artemis III Launch Simulation, Cryo Sim, LCC Firing Rooms 1 & 2

Artemis launch team members participate in a cryogenic propellant loading simulation for NASA’s Artemis III mission on Wednesday, Sept. 9, 2026, inside Firing Rooms 1 and 2 of…

Inspect NASA record

Artemis launch team members participate in a cryogenic propellant loading simulation for NASA’s Artemis III mission on Wednesday, Sept. 9, 2026, inside Firing Rooms 1 and 2 of the Rocco A. Petrone Launch Control Center at the agency’s Kennedy Space Center in Florida. Members of NASA’s Exploration Ground Systems team rehearse the steps to load the super-cooled liquid hydrogen and liquid oxygen into the SLS (Space Launch System) rocket core stage, a process that starts several hours before liftoff for the Artemis III mission. Artemis III will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.

Record ID
KSC-20260909-PH-RCR01_0244
NASA center
KSC
Date
2026-09-09
Credit
NASA/Clayton Rougelot
Keywords
Artemis launch team, Artemis, Artemis III, Artemis 3, Firing Room 1, Firing Room 2, Launch Control Center, Kennedy Space Center, Exploration Ground Systems, EGS, LCC, launch simulations
Artemis III Launch Simulation #2 - Cryo Sim

KSC · 2026-06-10 · KSC-20260610-PH-GEB01_0011

Artemis III Launch Simulation #2 - Cryo Sim

Aaron Sherman, launch project engineer, participates in a cryogenic propellant loading simulation for NASA’s Artemis III mission on Wednesday, June 10, 2026, inside Firing Room 1 of the…

Inspect NASA record

Aaron Sherman, launch project engineer, participates in a cryogenic propellant loading simulation for NASA’s Artemis III mission on Wednesday, June 10, 2026, inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at the agency’s Kennedy Space Center in Florida. Members of NASA’s Exploration Ground Systems team rehearse the steps to load the super-cooled liquid hydrogen and liquid oxygen into the SLS (Space Launch System) rocket core stage, a process that starts several hours before liftoff for the Artemis III mission. Artemis III will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.

Record ID
KSC-20260610-PH-GEB01_0011
NASA center
KSC
Date
2026-06-10
Credit
NASA/Glenn Benson
Keywords
Artemis, Artemis launch team, Artemis 3, Artemis III, Kennedy Space Center, LCC, Launch Control Center, Firing Room 1, Firing Room 2, EGS, Exploration Ground Systems, launch simulation
Artemis III SLS Core Stage Weather Cover Arrival

KSC · 2026-06-22 · KSC-20260622-PH-AJN01_0390

Artemis III SLS Core Stage Weather Cover Arrival

Teams transport a weather cover for the Artemis III SLS (Space Launch System) rocket core stage from NASA’s Pegasus barge to the spaceport’s Vehicle Assembly Building at the…

Inspect NASA record

Teams transport a weather cover for the Artemis III SLS (Space Launch System) rocket core stage from NASA’s Pegasus barge to the spaceport’s Vehicle Assembly Building at the agency’s Kennedy Space Center in Florida on Monday, June 22, 2026. The cover will protect the stage’s thermal systems while SLS sits atop the mobile launcher at Launch Pad 39B in its short stack configuration. NASA will send four Artemis astronauts on increasingly difficult missions to explore more of the Moon for scientific discovery, economic benefits, establish an enduring human presence on the lunar surface, and to build on our foundation for the first crewed missions to Mars.

Record ID
KSC-20260622-PH-AJN01_0390
NASA center
KSC
Date
2026-06-22
Credit
NASA/Amber Jean Notvest
Keywords
Artemis, Artemis III, KSC, Kennedy Space Center, Moon, Pegasus barge, SLS, Space Launch System, Turn Basin, VAB, Vehicle Assembly Building, rocket
NASA HQ New A-Suite Visit

KSC · 2021-04-19 · KSC-20210419-PH-KLS01_0050

NASA HQ New A-Suite Visit

Senior leaders with Kennedy Space Center in Florida, familiarize newly appointed officials from NASA Headquarters with the center’s facilities during a tour on April 19, 2021. The group…

Inspect NASA record

Senior leaders with Kennedy Space Center in Florida, familiarize newly appointed officials from NASA Headquarters with the center’s facilities during a tour on April 19, 2021. The group is on the surface of Launch Complex 39B, where the launch of NASA’s Space Launch System (SLS) rocket and Orion spacecraft will lift off on Artemis missions. Artemis I will be the first integrated test of SLS and Orion and will pave the way for landing the first woman and first person of color on the lunar surface. It will be a proving ground for deep space exploration, leading the agency’s efforts under the Artemis program for a sustainable presence on the Moon and preparing for human missions to Mars.

Record ID
KSC-20210419-PH-KLS01_0050
NASA center
KSC
Date
2021-04-19
Credit
NASA/Kim Shiflett
Keywords
Artemis, Artemis I, EGS, HQ, ICPS, KSC, LVSA, MPPF, Mobile Launcher, NASA, Orion, SLS
Meeting with Western Cape Government’s Alan Winde

HQ · 2023-06-13 · NHQ202306130006

Meeting with Western Cape Government’s Alan Winde

NASA Associate Administrator for the Space Operations Mission Directorate, Ken Bowersox, right, provides remarks during a meeting with from left to right, the Premier of the Western Cape…

Inspect NASA record

NASA Associate Administrator for the Space Operations Mission Directorate, Ken Bowersox, right, provides remarks during a meeting with from left to right, the Premier of the Western Cape Government, Alan Winde, NASA Deputy Associate Administrator for Space Communications and Navigation, Badri Younes, and Director-General of the Western Cape Government, Dr. Harry Malila, to discuss the path forward for development of an antenna for the Lunar Exploration Ground Sites (LEGS) mission in Matjiesfontein, South Africa, and other opportunities, Tuesday, June 13, 2023, at the Mary W. Jackson NASA Headquarters building in Washington. Photo Credit: (NASA/Aubrey Gemignani)

Record ID
NHQ202306130006
NASA center
HQ
Date
2023-06-13
Credit
NASA/Aubrey Gemignani
Keywords
Alan Winde, Badri Younes, DC, Harry Malila, Ken Bowersox, Lunar Exploration Ground Sites (LEGS), Mary W. Jackson NASA Headquarters, South Africa, Space Operations Center (SOC), Washington