Update Site (from NASA)
Explore NASA’s Image and Video Library.
Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.
Sign in to suggest a Marvel.
Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.
NASA image records
KSC · 2022-09-12 · KSC-20220912-PH-NAS01_0002
Lightning Strikes at Pad 39B
A lightning strike was recorded at Launch Complex 39B at NASA’s Kennedy Space Center in Florida on Sept. 12, 2022. NASA’s Space Launch System (SLS) and Orion spacecraft…
Inspect NASA record
A lightning strike was recorded at Launch Complex 39B at NASA’s Kennedy Space Center in Florida on Sept. 12, 2022. NASA’s Space Launch System (SLS) and Orion spacecraft atop the mobile launcher are on the launch pad in preparation for the Artemis I mission. The lightning strike was recorded by cameras stationed at the pad and mobile launcher using a special filter called a “clear day frame,” which provides an overlay of the raw frame on a reference image. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first woman of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220912-PH-NAS01_0002
- NASA center
- KSC
- Date
- 2022-09-12
- Credit
- NASA
- Keywords
- Lightning, Lightning Strikes, Weather, KSC, Kennedy Space Center, LC-39B, LC 39B, Pad 39B, Launch Complex 39B
KSC · 2022-09-14 · KSC-20220914-PH-NAS01_0003
Lightning Strikes at Pad 39B
A lightning strike was recorded at Launch Complex 39B at NASA’s Kennedy Space Center in Florida on Sept. 14, 2022. NASA’s Space Launch System (SLS) and Orion spacecraft…
Inspect NASA record
A lightning strike was recorded at Launch Complex 39B at NASA’s Kennedy Space Center in Florida on Sept. 14, 2022. NASA’s Space Launch System (SLS) and Orion spacecraft atop the mobile launcher are in view on the launch pad in preparation for the Artemis I mission. The lightning strike was recorded by cameras stationed at the pad and mobile launcher using a special filter called a “clear day frame,” which provides an overlay of the raw frame on a reference image. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first woman of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220914-PH-NAS01_0003
- NASA center
- KSC
- Date
- 2022-09-14
- Credit
- NASA
- Keywords
- Lightning, Lightning Strikes, Weather, KSC, Kennedy Space Center, LC-39B, LC 39B, Pad 39B, Launch Complex 39B
KSC · 2001-05-25 · KSC-01pp1030
KSC-01pp1030
KENNEDY SPACE CENTER, FLA. -- A second solid rocket booster is lifted up the gantry at Launch Complex 17-B, Cape Canaveral Air Force Station. The SRBs will be…
Inspect NASA record
KENNEDY SPACE CENTER, FLA. -- A second solid rocket booster is lifted up the gantry at Launch Complex 17-B, Cape Canaveral Air Force Station. The SRBs will be mated to the Delta II rocket that will launch the MAP instrument into a lunar-assisted trajectory to the Sun-Earth for a 27-month mission. The MAP mission will examine conditions in the early universe by measuring temperature differences in cosmic microwave background radiation, which is the radiant heat left over from the Big Bang. The properties of this radiation directly reflect conditions in the early universe. MAP is scheduled to launch June 30 at 3:46:46 p.m. EDT
- Record ID
- KSC-01pp1030
- NASA center
- KSC
- Date
- 2001-05-25
KSC · 2025-05-01 · KSC-20250501-PH-CSH01_0165
Artemis II Presentation and Group Photos
Teams from NASA and Lockheed Martin pose for a photo in front of NASA’s Artemis II Orion spacecraft, connected to a massive crane ahead atop the agency’s KAMAG…
Inspect NASA record
Teams from NASA and Lockheed Martin pose for a photo in front of NASA’s Artemis II Orion spacecraft, connected to a massive crane ahead atop the agency’s KAMAG transporter inside the Neil A. Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Friday, May 2, 2025. The spacecraft will be transported to the spaceport’s Multi-Payload Processing Facility to undergo fueling and processing for prelaunch operations. The Artemis II test flight is the first crewed flight under NASA’s Artemis campaign and is another step toward missions on the lunar surface and helping the agency prepare for future human missions to Mars.
- Record ID
- KSC-20250501-PH-CSH01_0165
- NASA center
- KSC
- Date
- 2025-05-01
- Credit
- NASA/Cory S Huston
- Keywords
- Orion, Artemis II, spacecraft, DD250, lockheed martin, EGS, MPPF, O&C
MSFC · 1967-01-01 · 6758383
Saturn Apollo Program
Workers at McDornel-Douglas install the Saturn IB S-IVB (second) stage for the Apollo-Soyuz mission into the company's S-IVB assembly and checkout tower in Huntington Beach, California. The Saturn…
Inspect NASA record
Workers at McDornel-Douglas install the Saturn IB S-IVB (second) stage for the Apollo-Soyuz mission into the company's S-IVB assembly and checkout tower in Huntington Beach, California. The Saturn IB launch vehicle was developed by the Marshall Space Flight Center (MSFC) as an interim vehicle in its "building block" approach to Saturn rocket development. This vehicle utilized the Saturn I technology to further develop and refine the capabilities of a larger booster and the Apollo spacecraft required for the manned lunar missions. The S-IVB stage, later used as the third stage of the Saturn V launch vehicle, was powered by a single J-2 engine initially capable of 200,000 pounds of thrust.
- Record ID
- 6758383
- NASA center
- MSFC
- Date
- 1967-01-01
- Keywords
- Saturn IB, S-IVB Stage, Apollo-Soyuz
KSC · 2001-05-25 · KSC-01pp1029
KSC-01pp1029
KENNEDY SPACE CENTER, FLA. -- A solid rocket booster is lifted up the gantry at Launch Complex 17-B, Cape Canaveral Air Force Station. The SRB will be mated…
Inspect NASA record
KENNEDY SPACE CENTER, FLA. -- A solid rocket booster is lifted up the gantry at Launch Complex 17-B, Cape Canaveral Air Force Station. The SRB will be mated to the Delta II rocket that will launch the MAP instrument into a lunar-assisted trajectory to the Sun-Earth for a 27-month mission. The MAP mission will examine conditions in the early universe by measuring temperature differences in cosmic microwave background radiation, which is the radiant heat left over from the Big Bang. The properties of this radiation directly reflect conditions in the early universe. MAP is scheduled to launch June 30 at 3:46:46 p.m. EDT
- Record ID
- KSC-01pp1029
- NASA center
- KSC
- Date
- 2001-05-25
HQ · 2013-09-05 · 201309050004HQ
LADEE NASA Social
NASA Associate Administrator for the Science Mission Directorate John Grunsfeld talks during a NASA Social about the Lunar Atmosphere and Dust Environment Explorer (LADEE) mission at the NASA…
Inspect NASA record
NASA Associate Administrator for the Science Mission Directorate John Grunsfeld talks during a NASA Social about the Lunar Atmosphere and Dust Environment Explorer (LADEE) mission at the NASA Wallops Flight Facility, Thursday, Sept. 5, 2013 on Wallops Island, VA. Fifty of NASA's social media followers are attending a two-day event in support of the LADEE launch. Data from LADEE will provide unprecedented information about the environment around the moon and give scientists a better understanding of other planetary bodies in our solar system and beyond. LADEE is scheduled to launch at 11:27 p.m. Friday, Sept. 6, from NASA's Wallops Flight Facility. Photo Credit: (NASA/Carla Cioffi)
- Record ID
- 201309050004HQ
- NASA center
- HQ
- Date
- 2013-09-05
- Credit
- NASA/Carla Cioffi
- Keywords
- John Grunsfeld, NASA Social, NASA Wallops Flight Facility (WFF), Virginia, Wallops Island
KSC · 2026-06-22 · KSC-20260622-PH-AJN01_0326
Artemis III SLS Core Stage Weather Cover Arrival
Teams transport a weather cover for the Artemis III SLS (Space Launch System) rocket core stage from NASA’s Pegasus barge to the spaceport’s Vehicle Assembly Building at the…
Inspect NASA record
Teams transport a weather cover for the Artemis III SLS (Space Launch System) rocket core stage from NASA’s Pegasus barge to the spaceport’s Vehicle Assembly Building at the agency’s Kennedy Space Center in Florida on Monday, June 22, 2026. The cover will protect the stage’s thermal systems while SLS sits atop the mobile launcher at Launch Pad 39B in its short stack configuration. NASA will send four Artemis astronauts on increasingly difficult missions to explore more of the Moon for scientific discovery, economic benefits, establish an enduring human presence on the lunar surface, and to build on our foundation for the first crewed missions to Mars.
- Record ID
- KSC-20260622-PH-AJN01_0326
- NASA center
- KSC
- Date
- 2026-06-22
- Credit
- NASA/Amber Jean Notvest
- Keywords
- Artemis, Artemis III, KSC, Kennedy Space Center, Moon, Pegasus barge, SLS, Space Launch System, Turn Basin, VAB, Vehicle Assembly Building, rocket
KSC · 2025-05-08 · KSC-20250508-PH-FMX01_0118
KSC-20250508-PH-FMX01_0118
Members of the Artemis launch team participate in an Artemis II launch countdown simulation inside Firing Room 1 in the Launch Control Center at NASA’s Kennedy Space Center…
Inspect NASA record
Members of the Artemis launch team participate in an Artemis II launch countdown simulation inside Firing Room 1 in the Launch Control Center at NASA’s Kennedy Space Center in Florida on Thursday, May 8, 2025. The simulations go through launch day scenarios to help launch team members test software and make adjustments if needed during countdown operations. Artemis II is the first crewed flight under NASA’s Artemis campaign and is another step toward missions on the lunar surface and helping the agency prepare for future human missions to Mars.
- Record ID
- KSC-20250508-PH-FMX01_0118
- NASA center
- KSC
- Date
- 2025-05-08
- Credit
- NASA/Frank Michaux
KSC · 2001-05-25 · KSC-01pp1032
KSC-01pp1032
KENNEDY SPACE CENTER, FLA. -- On Launch Complex 17-B, Cape Canaveral Air Force Station, the Delta II rocket waits to be mated to four solid rocket boosters (behind…
Inspect NASA record
KENNEDY SPACE CENTER, FLA. -- On Launch Complex 17-B, Cape Canaveral Air Force Station, the Delta II rocket waits to be mated to four solid rocket boosters (behind the Delta). The rocket will launch the MAP instrument into a lunar-assisted trajectory to the Sun-Earth for a 27-month mission. The MAP mission will examine conditions in the early universe by measuring temperature differences in cosmic microwave background radiation, which is the radiant heat left over from the Big Bang. The properties of this radiation directly reflect conditions in the early universe. MAP is scheduled to launch June 30 at 3:46:46 p.m. EDT
- Record ID
- KSC-01pp1032
- NASA center
- KSC
- Date
- 2001-05-25
KSC · 2026-06-22 · KSC-20260622-PH-AJN01_0193
Artemis III SLS Core Stage Weather Cover Arrival
Teams load a weather cover for the Artemis III SLS (Space Launch System) rocket core stage on Monday, June 22, 2026, from NASA’s Pegasus barge at the Launch…
Inspect NASA record
Teams load a weather cover for the Artemis III SLS (Space Launch System) rocket core stage on Monday, June 22, 2026, from NASA’s Pegasus barge at the Launch Complex 39 turn basin to transport the hardware to the spaceport’s Vehicle Assembly Building at the agency’s Kennedy Space Center in Florida. The cover will protect the stage’s thermal systems while SLS sits atop the mobile launcher at Launch Pad 39B in its short stack configuration. NASA will send four Artemis astronauts on increasingly difficult missions to explore more of the Moon for scientific discovery, economic benefits, establish an enduring human presence on the lunar surface, and to build on our foundation for the first crewed missions to Mars.
- Record ID
- KSC-20260622-PH-AJN01_0193
- NASA center
- KSC
- Date
- 2026-06-22
- Credit
- NASA/Amber Jean Notvest
- Keywords
- Artemis, Artemis III, KSC, Kennedy Space Center, Moon, Pegasus barge, SLS, Space Launch System, Turn Basin, VAB, Vehicle Assembly Building, rocket
KSC · 2025-05-08 · KSC-20250508-PH-FMX01_0086
KSC-20250508-PH-FMX01_0086
Members of the Artemis launch team participate in an Artemis II launch countdown simulation inside Firing Room 1 in the Launch Control Center at NASA’s Kennedy Space Center…
Inspect NASA record
Members of the Artemis launch team participate in an Artemis II launch countdown simulation inside Firing Room 1 in the Launch Control Center at NASA’s Kennedy Space Center in Florida on Thursday, May 8, 2025. The simulations go through launch day scenarios to help launch team members test software and make adjustments if needed during countdown operations. Artemis II is the first crewed flight under NASA’s Artemis campaign and is another step toward missions on the lunar surface and helping the agency prepare for future human missions to Mars.
- Record ID
- KSC-20250508-PH-FMX01_0086
- NASA center
- KSC
- Date
- 2025-05-08
- Credit
- NASA/Frank Michaux