Update Site (from NASA)
Explore NASA’s Image and Video Library.
Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.
Sign in to suggest a Marvel.
Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.
NASA image records
MAF · 2022-03-28 · MAF_20220328_CS2_45sJoin_epb_0011
NASA Joins Four Major SLS Rocket Parts to Form Artemis II Core Stage
NASA joined the Space Launch System rocket’s core stage forward assembly with the 130-foot liquid hydrogen tank for the Artemis II mission on March 18. This completes assembly…
Inspect NASA record
NASA joined the Space Launch System rocket’s core stage forward assembly with the 130-foot liquid hydrogen tank for the Artemis II mission on March 18. This completes assembly of four of the five large structures that make up the core stage that will help send the first astronauts to lunar orbit on Artemis II. The 66-foot forward assembly consists of the forward skirt, liquid oxygen tank and the intertank, which were mated earlier. Engineers inserted 360 bolts to connect the forward assembly to the liquid hydrogen tank to make up the bulk of the stage. Only the engine section, which is currently being outfitted and includes the main propulsion systems that connect to the four RS-25 engines, remains to be added to form the final core stage. All parts of the core stage are manufactured by NASA and Boeing, the core stage lead contractor at the agency’s Michoud Assembly Facility in New Orleans. Currently, the team is building core stages for three Artemis missions. The first core stage is stacked with the rest of the SLS rocket, which will launch the Artemis I mission to the Moon this year. Together with its twin solid rocket boosters, the core stage will produce 8.8 million pounds of thrust to send NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit to the Moon. The SLS rocket and the Orion spacecraft form the foundation for Artemis missions and future deep space exploration.
- Record ID
- MAF_20220328_CS2_45sJoin_epb_0011
- NASA center
- MAF
- Date
- 2022-03-28
- Credit
- ERIC BORDELON
- Keywords
- 4/5s, Artemis II, CS2, Eric Bordelon, Factory, MSFC, Marshall Space flight center, Michoud, Michoud Assembly Facility, NASA, New Orleans, SLS
MAF · 2022-03-28 · MAF_20220328_CS2_45sJoin_epb_0042
NASA Joins Four Major SLS Rocket Parts to Form Artemis II Core Stage
NASA joined the Space Launch System rocket’s core stage forward assembly with the 130-foot liquid hydrogen tank for the Artemis II mission on March 18. This completes assembly…
Inspect NASA record
NASA joined the Space Launch System rocket’s core stage forward assembly with the 130-foot liquid hydrogen tank for the Artemis II mission on March 18. This completes assembly of four of the five large structures that make up the core stage that will help send the first astronauts to lunar orbit on Artemis II. The 66-foot forward assembly consists of the forward skirt, liquid oxygen tank and the intertank, which were mated earlier. Engineers inserted 360 bolts to connect the forward assembly to the liquid hydrogen tank to make up the bulk of the stage. Only the engine section, which is currently being outfitted and includes the main propulsion systems that connect to the four RS-25 engines, remains to be added to form the final core stage. All parts of the core stage are manufactured by NASA and Boeing, the core stage lead contractor at the agency’s Michoud Assembly Facility in New Orleans. Currently, the team is building core stages for three Artemis missions. The first core stage is stacked with the rest of the SLS rocket, which will launch the Artemis I mission to the Moon this year. Together with its twin solid rocket boosters, the core stage will produce 8.8 million pounds of thrust to send NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit to the Moon. The SLS rocket and the Orion spacecraft form the foundation for Artemis missions and future deep space exploration.
- Record ID
- MAF_20220328_CS2_45sJoin_epb_0042
- NASA center
- MAF
- Date
- 2022-03-28
- Credit
- Eric Bordelon
- Keywords
- 4/5s, Artemis II, CS2, Eric Bordelon, Factory, MSFC, Marshall Space flight center, Michoud, Michoud Assembly Facility, NASA, New Orleans, SLS
MAF · 2022-03-28 · MAF_20220328_CS2_45sJoin_epb_0161
NASA Joins Four Major SLS Rocket Parts to Form Artemis II Core Stage
NASA joined the Space Launch System rocket’s core stage forward assembly with the 130-foot liquid hydrogen tank for the Artemis II mission on March 18. This completes assembly…
Inspect NASA record
NASA joined the Space Launch System rocket’s core stage forward assembly with the 130-foot liquid hydrogen tank for the Artemis II mission on March 18. This completes assembly of four of the five large structures that make up the core stage that will help send the first astronauts to lunar orbit on Artemis II. The 66-foot forward assembly consists of the forward skirt, liquid oxygen tank and the intertank, which were mated earlier. Engineers inserted 360 bolts to connect the forward assembly to the liquid hydrogen tank to make up the bulk of the stage. Only the engine section, which is currently being outfitted and includes the main propulsion systems that connect to the four RS-25 engines, remains to be added to form the final core stage. All parts of the core stage are manufactured by NASA and Boeing, the core stage lead contractor at the agency’s Michoud Assembly Facility in New Orleans. Currently, the team is building core stages for three Artemis missions. The first core stage is stacked with the rest of the SLS rocket, which will launch the Artemis I mission to the Moon this year. Together with its twin solid rocket boosters, the core stage will produce 8.8 million pounds of thrust to send NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit to the Moon. The SLS rocket and the Orion spacecraft form the foundation for Artemis missions and future deep space exploration.
- Record ID
- MAF_20220328_CS2_45sJoin_epb_0161
- NASA center
- MAF
- Date
- 2022-03-28
- Credit
- ERIC BORDELON
- Keywords
- 4/5s, Artemis II, CS2, Eric Bordelon, Factory, MSFC, Marshall Space flight center, Michoud, Michoud Assembly Facility, NASA, New Orleans, SLS
MAF · 2021-03-03 · MAF_20210303_ArtII_LH2_movePto48_epb_03
NASA Readies Artemis II Liquid Hydrogen Tank for Next Phase of Manufacturing
This image highlights the liquid oxygen tank, which will be used on the core stage of NASA’ Space Launch System rocket for Atremis II, the first crewed mission…
Inspect NASA record
This image highlights the liquid oxygen tank, which will be used on the core stage of NASA’ Space Launch System rocket for Atremis II, the first crewed mission of NASA’s Artemis program, at NASA’s Michoud Assembly Facility. The SLS core stage is made up of five unique elements: the forward skirt, liquid oxygen tank, intertank, liquid hydrogen tank, and the engine section. The forward skirt houses flight computers, cameras, and avionics systems. The liquid oxygen tan holds 196,000 gallons of liquid oxygen cooled to -297°F. The LOX hardware sits between the core stage’s forward skirt and the intertank; and along with the liquid hydrogen tank, it will fuel four RS-25 engines to produce two million pounds of thrust. Together with its four RS-25 engines, the rocket’s massive 212-foot-tall core stage — the largest stage NASA has ever built — and its twin solid rocket boosters will produce 8.8 million pounds of thrust to send NASA’s Orion spacecraft, astronauts and supplies beyond Earth’s orbit to the Moon and, ultimately, Mars. Offering more payload mass, volume capability and energy to speed missions through space, the SLS rocket, along with NASA’s Gateway in lunar orbit, the Human Landing System, and Orion spacecraft, is part of NASA’s backbone for deep space exploration and the Artemis lunar program. No other rocket can send astronauts in Orion around the Moon in a single mission.
- Record ID
- MAF_20210303_ArtII_LH2_movePto48_epb_03
- NASA center
- MAF
- Date
- 2021-03-03
- Credit
- NASA/Eric Bordelon
- Keywords
- Space Launch System, SLS, Artemis, NASA, Marshall Space Flight Center, Michoud Assembly Facility, rocket science, rocket, launch vehicle, Moon, liquid hydrogen
KSC · 2026-09-09 · KSC-20260909-PH-RCR01_0155
Artemis III Launch Simulation, Cryo Sim, LCC Firing Rooms 1 & 2
Artemis launch team members participate in a cryogenic propellant loading simulation for NASA’s Artemis III mission on Wednesday, Sept. 9, 2026, inside Firing Rooms 1 and 2 of…
Inspect NASA record
Artemis launch team members participate in a cryogenic propellant loading simulation for NASA’s Artemis III mission on Wednesday, Sept. 9, 2026, inside Firing Rooms 1 and 2 of the Rocco A. Petrone Launch Control Center at the agency’s Kennedy Space Center in Florida. Members of NASA’s Exploration Ground Systems team rehearse the steps to load the super-cooled liquid hydrogen and liquid oxygen into the SLS (Space Launch System) rocket core stage, a process that starts several hours before liftoff for the Artemis III mission. Artemis III will carry out a series of objectives in low Earth orbit designed to demonstrate critical systems needed for future lunar landings, beginning with Artemis IV.
- Record ID
- KSC-20260909-PH-RCR01_0155
- NASA center
- KSC
- Date
- 2026-09-09
- Credit
- NASA/Clayton Rougelot
- Keywords
- Artemis launch team, Artemis, Artemis III, Artemis 3, Firing Room 1, Firing Room 2, Launch Control Center, Kennedy Space Center, Exploration Ground Systems, EGS, LCC, launch simulations
JSC · 2026-04-02 · jsc2026e019992
Artemis II lunar science team -- jsc2026e019992
Artemis II lunar science team members, in the foreground from left: Amber Turner and Jared Ralleta in the center. Standing up behind Turner is Jacob Richardson, and sitting…
Inspect NASA record
Artemis II lunar science team members, in the foreground from left: Amber Turner and Jared Ralleta in the center. Standing up behind Turner is Jacob Richardson, and sitting behind and to the right, of Ralleta, are Ryan Watkins in the front, and Debra Needham behind her. The SER supports the Artemis science officer in the mission’s main flight control room. Built specifically for Artemis missions with these science priorities in mind, the SER is equipped to support rapid data interpretation, collaborative analysis, real-time decision making, and seamless coordination between the science and operations teams. Credits: NASA/Luna Posadas Nava
- Record ID
- jsc2026e019992
- NASA center
- JSC
- Date
- 2026-04-02
- Credit
- Luna Posadas Nava - NASA - JSC
- Keywords
- Artemis, Artemis II, Lunar Science, Lunar geography, lunar flyby, Science Evaluation Room, Moon
KSC · 2026-06-22 · KSC-20260622-PH-AJN01_0053
Artemis III SLS Core Stage Weather Cover Arrival
NASA’s Pegasus barge carrying a weather cover for the Artemis III SLS (Space Launch System) rocket core stage, arrives Sunday, June 21, 2026, at the Launch Complex 39…
Inspect NASA record
NASA’s Pegasus barge carrying a weather cover for the Artemis III SLS (Space Launch System) rocket core stage, arrives Sunday, June 21, 2026, at the Launch Complex 39 turn basin at the agency’s Kennedy Space Center in Florida. The cover will protect the stage’s thermal systems while SLS sits atop the mobile launcher at Launch Pad 39B in its short stack configuration. NASA will send four Artemis astronauts on increasingly difficult missions to explore more of the Moon for scientific discovery, economic benefits, establish an enduring human presence on the lunar surface, and to build on our foundation for the first crewed missions to Mars.
- Record ID
- KSC-20260622-PH-AJN01_0053
- NASA center
- KSC
- Date
- 2026-06-22
- Credit
- NASA/Amber Jean Notvest
- Keywords
- Artemis, Artemis III, KSC, Kennedy Space Center, Moon, Pegasus barge, SLS, Space Launch System, Turn Basin, VAB, Vehicle Assembly Building, rocket
KSC · 2026-06-22 · KSC-20260622-PH-AJN01_0037
Artemis III SLS Core Stage Weather Cover Arrival
NASA’s Pegasus barge carrying a weather cover for the Artemis III SLS (Space Launch System) rocket core stage, arrives Sunday, June 21, 2026, at the Launch Complex 39…
Inspect NASA record
NASA’s Pegasus barge carrying a weather cover for the Artemis III SLS (Space Launch System) rocket core stage, arrives Sunday, June 21, 2026, at the Launch Complex 39 turn basin at the agency’s Kennedy Space Center in Florida. The cover will protect the stage’s thermal systems while SLS sits atop the mobile launcher at Launch Pad 39B in its short stack configuration. NASA will send four Artemis astronauts on increasingly difficult missions to explore more of the Moon for scientific discovery, economic benefits, establish an enduring human presence on the lunar surface, and to build on our foundation for the first crewed missions to Mars.
- Record ID
- KSC-20260622-PH-AJN01_0037
- NASA center
- KSC
- Date
- 2026-06-22
- Credit
- NASA/Amber Jean Notvest
- Keywords
- Artemis, Artemis III, KSC, Kennedy Space Center, Moon, Pegasus barge, SLS, Space Launch System, Turn Basin, VAB, Vehicle Assembly Building, rocket
KSC · 2025-05-01 · KSC-20250501-PH-CSH01_0025
Artemis II Presentation and Group Photos
Teams from NASA and Lockheed Martin pose for a photo in front of NASA’s Artemis II Orion spacecraft, connected to a massive crane ahead atop the agency’s KAMAG…
Inspect NASA record
Teams from NASA and Lockheed Martin pose for a photo in front of NASA’s Artemis II Orion spacecraft, connected to a massive crane ahead atop the agency’s KAMAG transporter inside the Neil A. Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Friday, May 2, 2025. The spacecraft will be transported to the spaceport’s Multi-Payload Processing Facility to undergo fueling and processing for prelaunch operations. The Artemis II test flight is the first crewed flight under NASA’s Artemis campaign and is another step toward missions on the lunar surface and helping the agency prepare for future human missions to Mars.
- Record ID
- KSC-20250501-PH-CSH01_0025
- NASA center
- KSC
- Date
- 2025-05-01
- Credit
- NASA/Cory S Huston
- Keywords
- Orion, Artemis II, spacecraft, DD250, lockheed martin, EGS, MPPF, O&C
KSC · 2026-06-22 · KSC-20260622-PH-AJN01_0092
Artemis III SLS Core Stage Weather Cover Arrival
NASA’s Pegasus barge carrying a weather cover for the Artemis III SLS (Space Launch System) rocket core stage, arrives Sunday, June 21, 2026, at the Launch Complex 39…
Inspect NASA record
NASA’s Pegasus barge carrying a weather cover for the Artemis III SLS (Space Launch System) rocket core stage, arrives Sunday, June 21, 2026, at the Launch Complex 39 turn basin at the agency’s Kennedy Space Center in Florida. The cover will protect the stage’s thermal systems while SLS sits atop the mobile launcher at Launch Pad 39B in its short stack configuration. NASA will send four Artemis astronauts on increasingly difficult missions to explore more of the Moon for scientific discovery, economic benefits, establish an enduring human presence on the lunar surface, and to build on our foundation for the first crewed missions to Mars.
- Record ID
- KSC-20260622-PH-AJN01_0092
- NASA center
- KSC
- Date
- 2026-06-22
- Credit
- NASA/Amber Jean Notvest
- Keywords
- Artemis, Artemis III, KSC, Kennedy Space Center, Moon, Pegasus barge, SLS, Space Launch System, Turn Basin, VAB, Vehicle Assembly Building, rocket
KSC · 2025-05-08 · KSC-20250508-PH-FMX01_0074
KSC-20250508-PH-FMX01_0074
Jeremy Graeber, Artemis assistant launch director within NASA’s Exploration Ground Systems Program, participates in an Artemis II launch countdown simulation inside Firing Room 1 in the Launch Control…
Inspect NASA record
Jeremy Graeber, Artemis assistant launch director within NASA’s Exploration Ground Systems Program, participates in an Artemis II launch countdown simulation inside Firing Room 1 in the Launch Control Center at NASA’s Kennedy Space Center in Florida on Thursday, May 8, 2025. The simulations go through launch day scenarios to help launch team members test software and make adjustments if needed during countdown operations. Artemis II is the first crewed flight under NASA’s Artemis campaign and is another step toward missions on the lunar surface and helping the agency prepare for future human missions to Mars.
- Record ID
- KSC-20250508-PH-FMX01_0074
- NASA center
- KSC
- Date
- 2025-05-08
- Credit
- NASA/Frank Michaux
KSC · 2021-04-19 · KSC-20210419-PH-KLS01_0039
NASA HQ New A-Suite Visit
Senior leaders with Kennedy Space Center in Florida, familiarize newly appointed officials from NASA Headquarters with the center’s facilities during a tour on April 19, 2021. The group…
Inspect NASA record
Senior leaders with Kennedy Space Center in Florida, familiarize newly appointed officials from NASA Headquarters with the center’s facilities during a tour on April 19, 2021. The group is in the Vehicle Assembly Building, where NASA’s Space Launch System (SLS) rocket and Orion spacecraft will be stacked on the mobile launcher for Artemis missions. Artemis I will be the first integrated test of SLS and Orion and will pave the way for landing the first woman and first person of color on the lunar surface. It will be a proving ground for deep space exploration, leading the agency’s efforts under the Artemis program for a sustainable presence on the Moon and preparing for human missions to Mars.
- Record ID
- KSC-20210419-PH-KLS01_0039
- NASA center
- KSC
- Date
- 2021-04-19
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis, Artemis I, EGS, HQ, ICPS, KSC, LVSA, MPPF, Mobile Launcher, NASA, Orion, SLS