Update Site (from NASA)
Explore NASA’s Image and Video Library.
Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.
Sign in to suggest a Marvel.
Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.
NASA image records
KSC · 2023-08-08 · KSC-20230808-PH-KLS04_0013
NASA Briefing with Artemis II Crew
Jim Free, associate administrator for Exploration Systems Development Mission Directorate, NASA Headquarters, participates in a news conference on Aug. 8, 2023, at the agency’s Kennedy Space Center in…
Inspect NASA record
Jim Free, associate administrator for Exploration Systems Development Mission Directorate, NASA Headquarters, participates in a news conference on Aug. 8, 2023, at the agency’s Kennedy Space Center in Florida. NASA senior leadership and the Artemis II crew discussed the mission – the first with astronauts under Artemis, which will send NASA astronauts Reid Wiseman, Victor Glover, and Christina Koch, as well as Canadian Space Agency astronaut Jeremy Hansen around the Moon and back. Artemis II is the first crewed mission on NASA’s path to establishing a long-term lunar presence for science and exploration under Artemis and is the first mission with astronauts to the Moon.
- Record ID
- KSC-20230808-PH-KLS04_0013
- NASA center
- KSC
- Date
- 2023-08-08
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis, Artemis II, Cape Canaveral, Christina Hammock Koch, Florida, Jeremy Hansen, John. F. Kennedy Space Center, KSC, Kennedy, Kennedy Space Center, NASA, Reid Wiseman
KSC · 2011-04-26 · KSC-2011-3095
KSC-2011-3095
CAPE CANAVERAL, Fla. -- NASA's Gravity Recovery and Interior Laboratory, or GRAIL, mission logo on the side of the United Launch Alliance Delta II rocket that will loft…
Inspect NASA record
CAPE CANAVERAL, Fla. -- NASA's Gravity Recovery and Interior Laboratory, or GRAIL, mission logo on the side of the United Launch Alliance Delta II rocket that will loft the spacecraft into lunar orbit. The GRAIL mission is a part of NASA's Discovery Program. GRAIL will fly twin spacecraft in tandem orbits around the moon for several months to measure its gravity field. The mission also will answer longstanding questions about Earth's moon and provide scientists a better understanding of how Earth and other rocky planets in the solar system formed. GRAIL is scheduled to launch September 8, 2011. For more information visit: http://science.nasa.gov/missions/grail/. Photo credit: NASA/Jim Grossmann
- Record ID
- KSC-2011-3095
- NASA center
- KSC
- Date
- 2011-04-26
- Keywords
- Delta II, ELV, science, exploration, solar system, Goddard, JPL
JSC · 1970-04-13 · S70-35139
Mission Control Center (MCC) - Apollo 13 - Fourth (4th) Television Signal - MSC
S70-35139 (13 April 1970) --- Overall view of the Mission Operations Control Room (MOCR) in the Mission Control Center (MCC) at Manned Spacecraft Center (MSC), during the fourth…
Inspect NASA record
S70-35139 (13 April 1970) --- Overall view of the Mission Operations Control Room (MOCR) in the Mission Control Center (MCC) at Manned Spacecraft Center (MSC), during the fourth television transmission from the Apollo 13 mission in space. Eugene F. Kranz (foreground, back to camera), one of four Apollo 13 flight directors, views the large screen at front of MOCR, astronaut Fred W. Haise Jr., lunar module pilot, is seen on the screen. The fourth TV transmission from the Apollo 13 mission was on the evening of April 13, 1970.
- Record ID
- S70-35139
- NASA center
- JSC
- Date
- 1970-04-13
KSC · 2023-08-07 · KSC-20230807-PH-KLS01_0511
Artemis II Crew with EGS
Shown inside the high bay of the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Aug. 7, 2023, is the Orion…
Inspect NASA record
Shown inside the high bay of the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Aug. 7, 2023, is the Orion crew module for NASA’s Artemis II mission. The crew module is undergoing acoustic testing ahead of integration with the European Service Module. The Artemis II crew features Reid Wiseman, commander; Victor Glover, pilot; Christina Hammock Koch, mission specialist; and Jeremy Hansen, mission specialist. Artemis II is the first crewed mission on NASA’s path to establishing a long-term lunar presence for science and exploration under Artemis.
- Record ID
- KSC-20230807-PH-KLS01_0511
- NASA center
- KSC
- Date
- 2023-08-07
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis II, Artemis II crew, Astronauts, EGS, Exploration Ground Systems, KSC, Kennedy Space Center
KSC · 2022-05-11 · KSC-20220511-PH-KLS01_0100
Artemis II CTV Demo
A concept design of a crew transportation vehicle (CTV) for Artemis crewed missions is driven inside the transfer aisle of the Vehicle Assembly Building at NASA’s Kennedy Space…
Inspect NASA record
A concept design of a crew transportation vehicle (CTV) for Artemis crewed missions is driven inside the transfer aisle of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on May 11, 2022. Canoo Technologies Inc., was awarded a contract to design and provide the next generation of CTVs for the Artemis crewed missions. Representatives with Canoo were at the spaceport demonstrating the environmentally friendly fleet of vehicles. Artemis II will be the first Artemis mission flying crew aboard Orion. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220511-PH-KLS01_0100
- NASA center
- KSC
- Date
- 2022-05-11
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis, Artemis II, Astronauts, CTV, Crew Transport Vehicles, KSC, O&C, Orion, Pad 39B, Training Auditorium, VAB
KSC · 2022-05-11 · KSC-20220511-PH-KLS01_0104
Artemis II CTV Demo
A concept design of a crew transportation vehicle (CTV) for Artemis crewed missions is driven inside the transfer aisle of the Vehicle Assembly Building at NASA’s Kennedy Space…
Inspect NASA record
A concept design of a crew transportation vehicle (CTV) for Artemis crewed missions is driven inside the transfer aisle of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on May 11, 2022. Canoo Technologies Inc., was awarded a contract to design and provide the next generation of CTVs for the Artemis crewed missions. Representatives with Canoo were at the spaceport demonstrating the environmentally friendly fleet of vehicles. Artemis II will be the first Artemis mission flying crew aboard Orion. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220511-PH-KLS01_0104
- NASA center
- KSC
- Date
- 2022-05-11
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis, Artemis II, Astronauts, CTV, Crew Transport Vehicles, KSC, O&C, Orion, Pad 39B, Training Auditorium, VAB
HQ · 2022-08-30 · MAF_20220830__KSC_Artemis1_008_orig
Artemis I Prelaunch
NASA’s Space Launch System (SLS) rocket with the Orion spacecraft aboard is seen atop the mobile launcher at Launch 39B at NASA’s Kennedy Space Center in Florida. Artemis…
Inspect NASA record
NASA’s Space Launch System (SLS) rocket with the Orion spacecraft aboard is seen atop the mobile launcher at Launch 39B at NASA’s Kennedy Space Center in Florida. Artemis I mission is the first integrated test of the agency’s deep space exploration systems: the Space Launch System rocket, Orion spacecraft, and supporting ground systems. The mission is the first in a series of increasingly complex missions to the Moon. Launch of the uncrewed flight test is targeted for no earlier than Sept. 3 at 2:17 p.m. ET. With Artemis missions, NASA will land the first woman and first person of color on the Moon, using innovative technologies to explore more of the lunar surface than ever before.
- Record ID
- MAF_20220830__KSC_Artemis1_008_orig
- NASA center
- HQ
- Date
- 2022-08-30
- Credit
- NASA/Eric Bordelon
- Keywords
- Artemis, Marshall Space Flight Center, Moon, NASA, Rocket, SLS, Space Launch System, interview, launch vehicle, rocket science
MAF · 2022-03-03 · MAF_20220303_CS2_LH2xferPRS08
NASA Makes Progress on Artemis II Core Stage Assembly
NASA is preparing major pieces of the Space Launch System rocket’s core stage to be joined as part of assembling the core stage for the Artemis II mission…
Inspect NASA record
NASA is preparing major pieces of the Space Launch System rocket’s core stage to be joined as part of assembling the core stage for the Artemis II mission that will send crews to lunar orbit. Crews will soon connect the forward assembly with the 130-foot liquid hydrogen tank in the final assembly area at NASA’s Michoud Assembly Facility in New Orleans. When this process is completed, four of the five large structures that make up the core stage will be joined. The 66-foot forward assembly consists of the forward skirt, liquid oxygen tank and the intertank, which were mated earlier. This forward assembly will be joined with the 130-foot liquid hydrogen tank, the largest part of the stage that holds more than 500,000 gallons of cryogenic propellant. To compete the Artemis II core stage, engineers will add the engine section, which is currently being outfitted and includes the main propulsion systems that connect to the four RS-25 engines, Together, with the SLS twin solid rocket boosters, the core stage will produce 8.8 million pounds of thrust to send NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit to the Moon. The SLS rocket and the Orion spacecraft form the foundation for deep space exploration and the Artemis lunar program. For more on the core stage: https://www.nasa.gov/exploration/systems/sls/multimedia/infographics/corestage101.html Image credit: NASA/Michael DeMocker
- Record ID
- MAF_20220303_CS2_LH2xferPRS08
- NASA center
- MAF
- Date
- 2022-03-03
- Credit
- Michael DeMocker
- Keywords
- Space Launch System, SLS, Orion, Artemis production, Artemis II, Artemis, testing, hardware, core stage, Marshall Space Flight Center, Michoud Assembly Facility
MAF · 2022-02-25 · MAF_20220225_CS2_LH2_Area48_06
NASA Makes Progress on Artemis II Core Stage Assembly
NASA is preparing major pieces of the Space Launch System rocket’s core stage to be joined as part of assembling the core stage for the Artemis II mission…
Inspect NASA record
NASA is preparing major pieces of the Space Launch System rocket’s core stage to be joined as part of assembling the core stage for the Artemis II mission that will send crews to lunar orbit. Crews will soon connect the forward assembly with the 130-foot liquid hydrogen tank in the final assembly area at NASA’s Michoud Assembly Facility in New Orleans. When this process is completed, four of the five large structures that make up the core stage will be joined. The 66-foot forward assembly consists of the forward skirt, liquid oxygen tank and the intertank, which were mated earlier. This forward assembly will be joined with the 130-foot liquid hydrogen tank, the largest part of the stage that holds more than 500,000 gallons of cryogenic propellant. To compete the Artemis II core stage, engineers will add the engine section, which is currently being outfitted and includes the main propulsion systems that connect to the four RS-25 engines, Together, with the SLS twin solid rocket boosters, the core stage will produce 8.8 million pounds of thrust to send NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit to the Moon. The SLS rocket and the Orion spacecraft form the foundation for deep space exploration and the Artemis lunar program. For more on the core stage: https://www.nasa.gov/exploration/systems/sls/multimedia/infographics/corestage101.html Image credit: NASA/Michael DeMocker
- Record ID
- MAF_20220225_CS2_LH2_Area48_06
- NASA center
- MAF
- Date
- 2022-02-25
- Credit
- Michael DeMocker
- Keywords
- Space Launch System, SLS, Orion, Artemis production, Artemis II, Artemis, testing, hardware, core stage, Marshall Space Flight Center, Michoud Assembly Facility
MAF · 2022-03-07 · MAF_20220307_CS2_MJto48_0009
NASA Makes Progress on Artemis II Core Stage Assembly
NASA is preparing major pieces of the Space Launch System rocket’s core stage to be joined as part of assembling the core stage for the Artemis II mission…
Inspect NASA record
NASA is preparing major pieces of the Space Launch System rocket’s core stage to be joined as part of assembling the core stage for the Artemis II mission that will send crews to lunar orbit. Crews will soon connect the forward assembly with the 130-foot liquid hydrogen tank in the final assembly area at NASA’s Michoud Assembly Facility in New Orleans. When this process is completed, four of the five large structures that make up the core stage will be joined. The 66-foot forward assembly consists of the forward skirt, liquid oxygen tank and the intertank, which were mated earlier. This forward assembly will be joined with the 130-foot liquid hydrogen tank, the largest part of the stage that holds more than 500,000 gallons of cryogenic propellant. To compete the Artemis II core stage, engineers will add the engine section, which is currently being outfitted and includes the main propulsion systems that connect to the four RS-25 engines, Together, with the SLS twin solid rocket boosters, the core stage will produce 8.8 million pounds of thrust to send NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit to the Moon. The SLS rocket and the Orion spacecraft form the foundation for deep space exploration and the Artemis lunar program. For more on the core stage: https://www.nasa.gov/exploration/systems/sls/multimedia/infographics/corestage101.html Image credit: NASA/Michael DeMocker
- Record ID
- MAF_20220307_CS2_MJto48_0009
- NASA center
- MAF
- Date
- 2022-03-07
- Credit
- Michael DeMocker
- Keywords
- Space Launch System, SLS, Orion, Artemis production, Artemis II, Artemis, testing, hardware, core stage, Marshall Space Flight Center, Michoud Assembly Facility
MAF · 2022-02-25 · MAF_20220225_CS2_LH2_Area48_15
NASA Makes Progress on Artemis II Core Stage Assembly
NASA is preparing major pieces of the Space Launch System rocket’s core stage to be joined as part of assembling the core stage for the Artemis II mission…
Inspect NASA record
NASA is preparing major pieces of the Space Launch System rocket’s core stage to be joined as part of assembling the core stage for the Artemis II mission that will send crews to lunar orbit. Crews will soon connect the forward assembly with the 130-foot liquid hydrogen tank in the final assembly area at NASA’s Michoud Assembly Facility in New Orleans. When this process is completed, four of the five large structures that make up the core stage will be joined. The 66-foot forward assembly consists of the forward skirt, liquid oxygen tank and the intertank, which were mated earlier. This forward assembly will be joined with the 130-foot liquid hydrogen tank, the largest part of the stage that holds more than 500,000 gallons of cryogenic propellant. To compete the Artemis II core stage, engineers will add the engine section, which is currently being outfitted and includes the main propulsion systems that connect to the four RS-25 engines, Together, with the SLS twin solid rocket boosters, the core stage will produce 8.8 million pounds of thrust to send NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit to the Moon. The SLS rocket and the Orion spacecraft form the foundation for deep space exploration and the Artemis lunar program. For more on the core stage: https://www.nasa.gov/exploration/systems/sls/multimedia/infographics/corestage101.html Image credit: NASA/Michael DeMocker
- Record ID
- MAF_20220225_CS2_LH2_Area48_15
- NASA center
- MAF
- Date
- 2022-02-25
- Credit
- Michael DeMocker
- Keywords
- Space Launch System, SLS, Orion, Artemis production, Artemis II, Artemis, testing, hardware, core stage, Marshall Space Flight Center, Michoud Assembly Facility