Update Site (from NASA)
Explore NASA’s Image and Video Library.
Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.
Sign in to suggest a Marvel.
Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.
NASA image records
KSC · 2022-03-17 · KSC-20220317-PH-KLS03_0033
Artemis I WDR Rollout
NASA’s Space Launch System (SLS) rocket, with the Orion capsule atop, slowly rolls out of the Vehicle Assembly Building at the agency’s Kennedy Space Center in Florida on…
Inspect NASA record
NASA’s Space Launch System (SLS) rocket, with the Orion capsule atop, slowly rolls out of the Vehicle Assembly Building at the agency’s Kennedy Space Center in Florida on March 17, 2022, on its journey to Launch Complex 39B. Carried atop the crawler-transporter 2, NASA’s Moon rocket is venturing out to the launch pad for a wet dress rehearsal ahead of the uncrewed Artemis I launch. The first in an increasingly complex set of missions, Artemis I will test SLS and Orion as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will land the first woman and the first person of color on the lunar surface, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220317-PH-KLS03_0033
- NASA center
- KSC
- Date
- 2022-03-17
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis I, Kennedy Space Center, VAB, pad 39B, rollout, wet dress rehearsal
KSC · 2022-03-17 · KSC-20220317-PH-KLS04_0062
Artemis I WDR Rollout
NASA’s Space Launch System (SLS) rocket, with the Orion capsule atop, slowly makes its way down the crawlerway at the agency’s Kennedy Space Center in Florida on March…
Inspect NASA record
NASA’s Space Launch System (SLS) rocket, with the Orion capsule atop, slowly makes its way down the crawlerway at the agency’s Kennedy Space Center in Florida on March 17, 2022. Carried atop the crawler-transporter 2, NASA’s Moon rocket is venturing from the Vehicle Assembly Building to Launch Complex 39B for a wet dress rehearsal ahead of the uncrewed Artemis I launch. The first in an increasingly complex set of missions, Artemis I will test SLS and Orion as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will land the first woman and the first person of color on the lunar surface, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220317-PH-KLS04_0062
- NASA center
- KSC
- Date
- 2022-03-17
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis I, Kennedy Space Center, Pad 39B, VAB, rollout, wet dress rehearsal
JSC · 1969-05-26 · s69-20638
APOLLO 10 RECOVERY
S69-20638 (26 May 1969) --- Astronaut Eugene A. Cernan, lunar module pilot, egresses the Apollo 10 spacecraft during recovery operations in the South Pacific. U.S. Navy underwater demolition…
Inspect NASA record
S69-20638 (26 May 1969) --- Astronaut Eugene A. Cernan, lunar module pilot, egresses the Apollo 10 spacecraft during recovery operations in the South Pacific. U.S. Navy underwater demolition team swimmers assist in the recovery operations. Already in life raft are astronauts Thomas P. Stafford (left), commander; and John W. Young, command module pilot. The three crewmen were picked up by helicopter and flown to the prime recovery ship, USS Princeton. Splashdown occurred at 11:53 a.m. (CDT), May 26, 1969, about 400 miles east of American Samoa, and about four miles from the recovery ship, to conclude a successful eight-day lunar orbit mission.
- Record ID
- s69-20638
- NASA center
- JSC
- Date
- 1969-05-26
- Keywords
- Apollo, Apollo 10, Recovery
KSC · 2011-05-25 · KSC-2011-4002
KSC-2011-4002
CAPE CANAVERAL, Fla. -- This tent called a "Lunarena" is a giant "sandbox," with about 60 tons of ultra-fine simulated lunar soil spread on the floor for NASA's…
Inspect NASA record
CAPE CANAVERAL, Fla. -- This tent called a "Lunarena" is a giant "sandbox," with about 60 tons of ultra-fine simulated lunar soil spread on the floor for NASA's second annual Lunabotics Mining Competition at the Kennedy Space Center Visitor Complex. Thirty-six teams of undergraduate and graduate students from the United States, Bangladesh, Canada, Colombia and India will participate in NASA's Lunabotics Mining Competition May 26 - 28 at the agency's Kennedy Space Center in Florida. The competition is designed to engage and retain students in science, technology, engineering and mathematics (STEM). Teams will maneuver their remote controlled or autonomous excavators, called lunabots, in about 60 tons of ultra-fine simulated lunar soil, called BP-1. The competition is an Exploration Systems Mission Directorate project managed by Kennedy's Education Division. The event also provides a competitive environment that could result in innovative ideas and solutions for NASA's future excavation of the moon. Photo credit: NASA/Frankie Martin
- Record ID
- KSC-2011-4002
- NASA center
- KSC
- Date
- 2011-05-25
- Keywords
- lunabotics, education
JSC · 1969-03-06 · as09-19-2983
Astronaut Russell Schweickart photographed during EVA
AS09-19-2983 (6 March 1969) --- Astronaut Russell L. Schweickart, lunar module pilot, operates a 70mm Hasselblad camera during his extravehicular activity (EVA) on the fourth day of the…
Inspect NASA record
AS09-19-2983 (6 March 1969) --- Astronaut Russell L. Schweickart, lunar module pilot, operates a 70mm Hasselblad camera during his extravehicular activity (EVA) on the fourth day of the Apollo 9 Earth-orbital mission. The Command and Service Modules (CSM) and Lunar Module (LM) "Spider" are docked. This view was taken from the Command Module (CM) "Gumdrop". Schweickart, wearing an Extravehicular Mobility Unit (EMU), is standing in "golden slippers" on the LM porch. On his back, partially visible, are a Portable Life Support System (PLSS) and an Oxygen Purge System (OPS). Astronaut James A. McDivitt, Apollo 9 commander, was inside the "Spider". Astronaut David R. Scott, command module pilot, remained at the controls in the CM.
- Record ID
- as09-19-2983
- NASA center
- JSC
- Date
- 1969-03-06
- Keywords
- APOLLO 9, APOLLO PROJECT, APOLLO SPACECRAFT, ASTRONAUTS, CAMERAS, COMMAND MODULES, EXTRAVEHICULAR ACTIVITY, EXTRAVEHICULAR MOBILITY UNITS LUNAR MODULE, ONBOARD ACTIVITIES, PHOTOGRAPHIC EQUIPMENT, PHOTOGRAPHY
KSC · 2022-06-06 · KSC-20220606-PH-JBS02_0064
Artemis I WDR Rollout #2
A sunrise at NASA’s Kennedy Space Center in Florida casts an orange glow around the agency’s Artemis I Moon rocket as it travels to Launch Complex 39B on…
Inspect NASA record
A sunrise at NASA’s Kennedy Space Center in Florida casts an orange glow around the agency’s Artemis I Moon rocket as it travels to Launch Complex 39B on June 6, 2022. The rocket rolled out of the Vehicle Assembly Building in the early morning hours to travel the 4.2 miles to the launch pad for NASA’s next wet dress rehearsal attempt ahead of the Artemis I launch. The first in an increasingly complex series of missions, Artemis I will test the Space Launch System rocket and Orion spacecraft as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will land the first woman and first person of color on the lunar surface, paving the way for a long-term lunar presence and using the Moon as a steppingstone before venturing to Mars.
- Record ID
- KSC-20220606-PH-JBS02_0064
- NASA center
- KSC
- Date
- 2022-06-06
- Credit
- NASA/Ben Smegelsky
- Keywords
- Artemis, Artemis I, EGS, KSC, Orion, Pad 39B, Rollout, SLS, VAB
KSC · 2022-06-06 · KSC-20220606-PH-JBS02_0201
Artemis I WDR Rollout #2
In this view looking up, NASA’s crawler-transporter 2 – adorned with an Artemis banner – can be seen bearing the weight of the agency’s Artemis I Moon rocket…
Inspect NASA record
In this view looking up, NASA’s crawler-transporter 2 – adorned with an Artemis banner – can be seen bearing the weight of the agency’s Artemis I Moon rocket and mobile launcher as it carries the duo to Kennedy Space Center’s Launch Complex 39B in Florida on June 6, 2022. The rocket rolled out of the Vehicle Assembly Building in the early morning hours to travel the 4.2 miles to the launch pad for NASA’s next wet dress rehearsal attempt ahead of the Artemis I launch. The first in an increasingly complex series of missions, Artemis I will test the Space Launch System rocket and Orion spacecraft as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will land the first woman and first person of color on the lunar surface, paving the way for a long-term lunar presence and using the Moon as a steppingstone before venturing to Mars.
- Record ID
- KSC-20220606-PH-JBS02_0201
- NASA center
- KSC
- Date
- 2022-06-06
- Credit
- NASA/Ben Smegelsky
- Keywords
- Artemis, Artemis I, EGS, KSC, Orion, Pad 39B, Rollout, SLS, VAB
KSC · 2025-07-10 · KSC-20260710-PH-FMX01_0181
Artemis III Crew Visit
Artemis III crew member, NASA astronaut Andre Douglas enters NASA’s Artemis IV Orion spacecraft inside the high bay of the Neil A. Armstrong Operations and Checkout Building at NASA’s…
Inspect NASA record
Artemis III crew member, NASA astronaut Andre Douglas enters NASA’s Artemis IV Orion spacecraft inside the high bay of the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Friday, July 10, 2026. Douglas and fellow Artemis III crew member, NASA astronaut Randy Bresnik, met with Orion teams and got a close look at the work underway on the Orion spacecraft inside the facility. Bresnik, Douglas, NASA astronaut Frank Rubio, and ESA (European Space Agency) astronaut Luca Parmitano will launch on the Artemis III mission to conduct critical rendezvous and docking tests with lunar lander systems in low Earth orbit, advancing the capabilities needed before astronauts return to the lunar surface on Artemis IV.
- Record ID
- KSC-20260710-PH-FMX01_0181
- NASA center
- KSC
- Date
- 2025-07-10
- Credit
- NASA/Frank Michaux
- Keywords
- Mars, Exploration Ground Systems, Kennedy Space Center, EGS, Vehicle Assembly Building, VAB, KSC, Moon, Artemis III, Spaceport, Artemis
HQ · 2026-03-24 · NHQ202603240047
NASA Update on Implementation of National Space Policy
NASA Administrator Jared Isaacman, left, and NASA Associate Administrator Amit Kshatriya, are seen as NASA Space Reactor Office Program Executive Steve Sinacore speaks during an event where NASA…
Inspect NASA record
NASA Administrator Jared Isaacman, left, and NASA Associate Administrator Amit Kshatriya, are seen as NASA Space Reactor Office Program Executive Steve Sinacore speaks during an event where NASA is outlining how the agency is executing President Donald J. Trump’s National Space Policy and accelerating preparations for America’s return to the surface of the Moon by 2028, Tuesday, March 24, 2026, at the Mary W. Jackson NASA Headquarters building in Washington. During the event NASA leadership provided updates on mission priorities, including sending the first astronauts to the lunar surface in more than 50 years, establishing the initial elements of a permanent lunar base, getting America underway in space on nuclear propulsion, and other objectives. Photo Credit: (NASA/Bill Ingalls)
- Record ID
- NHQ202603240047
- NASA center
- HQ
- Date
- 2026-03-24
- Credit
- NASA/Bill Ingalls
- Keywords
- Amit Kshatriya, DC, Jared Isaacman, Mary W. Jackson NASA Headquarters, NASA Administrator, Washington
JSC · 1971-07-26 · S71-41408
PRELAUNCH - (SUITING-UP) APOLLO 15 - KSC
S71-41408 (26 July 1971) --- The three Apollo 15 astronauts go through suiting up operations in the Kennedy Space Center's (KSC) Manned Spacecraft Operations Building (MSOB) during the…
Inspect NASA record
S71-41408 (26 July 1971) --- The three Apollo 15 astronauts go through suiting up operations in the Kennedy Space Center's (KSC) Manned Spacecraft Operations Building (MSOB) during the Apollo 15 prelaunch countdown. They are David R. Scott (foreground), commander; Alfred M. Worden (center), command module pilot; and James B. Irwin (background), lunar module pilot. Minutes later the crew rode a special transport van over to Pad A, Launch Complex 39, where their spacecraft awaited them. With the crew was Dr. Donald (Deke) K. Slayton (wearing dark blue sport shirt), director of Flight Crew Operations, Manned Spacecraft Center (MSC). The Apollo 15 space vehicle was launched at 9:34:00:79 a.m. (EDT), July 26, 1971, on a lunar landing mission.
- Record ID
- S71-41408
- NASA center
- JSC
- Date
- 1971-07-26
- Credit
- N/A
KSC · 2022-08-12 · KSC-20220812-PH-ILW01_0152
Artemis I Award Certification Ceremony
NASA’s Exploration Ground Systems Manager Mike Bolger (left) and Artemis I Launch Director Charlie Blackwell-Thompson are photographed inside Firing Room 2 of the Rocco A. Petrone Launch Control…
Inspect NASA record
NASA’s Exploration Ground Systems Manager Mike Bolger (left) and Artemis I Launch Director Charlie Blackwell-Thompson are photographed inside Firing Room 2 of the Rocco A. Petrone Launch Control Center at the agency’s Kennedy Space Center in Florida during a certification ceremony on Aug. 12, 2022. The ceremony was held to commemorate the certification of the Artemis I launch team following their launch simulation held in December 2021. During the ceremony, Bolger and Blackwell-Thompson handed out certificates to individual members of the launch team. The first in an increasingly complex series of missions, Artemis I will test NASA’s Space Launch System rocket and Orion spacecraft as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will land the first woman and the first person of color on the lunar surface, paving the way for long-term lunar presence and using the Moon as a steppingstone before venturing to Mars.
- Record ID
- KSC-20220812-PH-ILW01_0152
- NASA center
- KSC
- Date
- 2022-08-12
- Credit
- NASA/Isaac Watson
- Keywords
- Artemis, Artemis I, Award, Firing Room, KSC, Kennedy Space Center, LCC, Launch Control Center, certification, launch team
KSC · 2022-03-17 · KSC-20220317-PH-KLS03_0032
Artemis I WDR Rollout
NASA’s Space Launch System (SLS) rocket, with the Orion capsule atop, prepares to roll out of High Bay 3 of the Vehicle Assembly Building at the agency’s Kennedy…
Inspect NASA record
NASA’s Space Launch System (SLS) rocket, with the Orion capsule atop, prepares to roll out of High Bay 3 of the Vehicle Assembly Building at the agency’s Kennedy Space Center in Florida on March 17, 2022, for its journey to Launch Complex 39B. Carried atop the crawler-transporter 2, NASA’s Moon rocket is venturing out to the launch pad for a wet dress rehearsal ahead of the uncrewed Artemis I launch. The first in an increasingly complex set of missions, Artemis I will test SLS and Orion as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will land the first woman and the first person of color on the lunar surface, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220317-PH-KLS03_0032
- NASA center
- KSC
- Date
- 2022-03-17
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis I, Kennedy Space Center, VAB, pad 39B, rollout, wet dress rehearsal