Update Site (from NASA)
Explore NASA’s Image and Video Library.
Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.
Sign in to suggest a Marvel.
Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.
NASA image records
JSC · 1970-04-17 · S70-35610
Apollo 13 crew recovery after splashdown
S70-35610 (17 April 1970) --- A water level view of the Apollo 13 recovery operations in the South Pacific Ocean. The three astronauts as seen egressing their spacecraft.…
Inspect NASA record
S70-35610 (17 April 1970) --- A water level view of the Apollo 13 recovery operations in the South Pacific Ocean. The three astronauts as seen egressing their spacecraft. John L. Swigert Jr. (back to camera), command module pilot, is already in the life raft. Fred W. Haise Jr., lunar module pilot, facing camera, is stepping into the life raft. James A. Lovell Jr., commander, is leaving the spacecraft in the background. A United States Navy underwater demolition team assists with the recovery operations. The three crewmembers were picked up by helicopter and flown to the prime recovery ship, USS Iwo Jima. The Apollo 13 Command Module (CM) splashed down at 12:07:44 p.m. (CST), April 17, 1970, to conclude safely a perilous space flight. Though the Apollo lunar landing mission was canceled, a disastrous loss of three astronauts was averted.
- Record ID
- S70-35610
- NASA center
- JSC
- Date
- 1970-04-17
- Keywords
- APOLLO 13, APOLLO PROJECT, APOLLO SPACECRAFT, ASTRONAUTS, COMMAND MODULES, DIVERS, EGRESS, LIFE RAFTS, NAVY, PACIFIC OCEAN, RECOVERY, WATER LANDING
HQ · 2026-03-24 · NHQ202603240051
NASA Update on Implementation of National Space Policy
NASA Space Reactor Office Program Executive Steve Sinacore speaks, as NASA Administrator Jared Isaacman, and NASA Associate Administrator Amit Kshatriya, right, look on, during an event where NASA…
Inspect NASA record
NASA Space Reactor Office Program Executive Steve Sinacore speaks, as NASA Administrator Jared Isaacman, and NASA Associate Administrator Amit Kshatriya, right, look on, during an event where NASA is outlining how the agency is executing President Donald J. Trump’s National Space Policy and accelerating preparations for America’s return to the surface of the Moon by 2028, Tuesday, March 24, 2026, at the Mary W. Jackson NASA Headquarters building in Washington. During the event NASA leadership provided updates on mission priorities, including sending the first astronauts to the lunar surface in more than 50 years, establishing the initial elements of a permanent lunar base, getting America underway in space on nuclear propulsion, and other objectives. Photo Credit: (NASA/Bill Ingalls)
- Record ID
- NHQ202603240051
- NASA center
- HQ
- Date
- 2026-03-24
- Credit
- NASA/Bill Ingalls
- Keywords
- Amit Kshatriya, DC, Jared Isaacman, Mary W. Jackson NASA Headquarters, NASA Administrator, Steve Sinacore, Washington
MSFC · 1969-07-20 · 6900966
Saturn Apollo Program
The Apollo 11 mission launched from the Kennedy Space Center (KSC) in Florida via the Marshall Space Flight Center (MSFC) developed Saturn V launch vehicle on July 16,…
Inspect NASA record
The Apollo 11 mission launched from the Kennedy Space Center (KSC) in Florida via the Marshall Space Flight Center (MSFC) developed Saturn V launch vehicle on July 16, 1969 and safely returned to Earth on July 24, 1969. Aboard the space craft were astronauts Neil A. Armstrong, commander; Michael Collins, Command Module (CM) pilot; and Edwin E. (Buzz) Aldrin Jr., Lunar Module (LM) pilot. The CM, piloted by Michael Collins, remained in a parking orbit around the Moon, while the LM, named “Eagle’’, carrying astronauts Armstrong and Aldrin, landed on the Moon in the Sea of Tranquility. During 2½ hours of surface exploration, the crew set up experiments, collected 47 pounds of lunar surface material for analysis back on Earth, planted the U.S Flag, and left a message for all mankind. In this photograph, Aldrin is deploying the Passive Seismic Experiment Package (PSEP).
- Record ID
- 6900966
- NASA center
- MSFC
- Date
- 1969-07-20
- Keywords
- Apollo 11, Moon, Aldrin, Lunar Surface, Passive Seismic Experiment Package, PSEP, Deployment
KSC · 2022-03-17 · KSC-20220317-PH-KLS04_0051
Artemis I WDR Rollout
NASA’s Space Launch System (SLS) rocket, with the Orion capsule atop, slowly makes its way down the crawlerway at the agency’s Kennedy Space Center in Florida on March…
Inspect NASA record
NASA’s Space Launch System (SLS) rocket, with the Orion capsule atop, slowly makes its way down the crawlerway at the agency’s Kennedy Space Center in Florida on March 17, 2022. Carried atop the crawler-transporter 2, NASA’s Moon rocket is venturing from the Vehicle Assembly Building to Launch Complex 39B for a wet dress rehearsal ahead of the uncrewed Artemis I launch. The first in an increasingly complex set of missions, Artemis I will test SLS and Orion as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will land the first woman and the first person of color on the lunar surface, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220317-PH-KLS04_0051
- NASA center
- KSC
- Date
- 2022-03-17
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis I, Kennedy Space Center, Pad 39B, VAB, rollout, wet dress rehearsal
KSC · 2022-03-17 · KSC-20220317-PH-KLS02_0002
Artemis I WDR Rollout - VAB Doors Open
NASA’s Space Launch System (SLS) rocket, with the Orion capsule atop, prepares to roll out of High Bay 3 of the Vehicle Assembly Building at the agency’s Kennedy…
Inspect NASA record
NASA’s Space Launch System (SLS) rocket, with the Orion capsule atop, prepares to roll out of High Bay 3 of the Vehicle Assembly Building at the agency’s Kennedy Space Center in Florida on March 17, 2022, for its journey to Launch Complex 39B. Carried atop the crawler-transporter 2, NASA’s Moon rocket is venturing out to the launch pad for a wet dress rehearsal ahead of the uncrewed Artemis I launch. The first in an increasingly complex set of missions, Artemis I will test SLS and Orion as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will land the first woman and the first person of color on the lunar surface, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220317-PH-KLS02_0002
- NASA center
- KSC
- Date
- 2022-03-17
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis I, Kennedy Space Center, Pad 39B, VAB, rollout, wet dress rehearsal
KSC · 2022-08-12 · KSC-20220812-PH-ILW01_0170
Artemis I Award Certification Ceremony
From left, Artemis I Launch Director Charlie Blackwell-Thompson, Technical Assistant to the Launch Director Wes Mosedale, and Assistant Launch Director Jeremy Graeber are photographed inside Firing Room 2…
Inspect NASA record
From left, Artemis I Launch Director Charlie Blackwell-Thompson, Technical Assistant to the Launch Director Wes Mosedale, and Assistant Launch Director Jeremy Graeber are photographed inside Firing Room 2 of the Rocco A. Petrone Launch Control Center at the agency’s Kennedy Space Center in Florida during a certification ceremony on Aug. 12, 2022. The ceremony was held to commemorate the certification of the Artemis I launch team following their launch simulation held in December 2021. During the ceremony, management staff handed out certificates to individual team members. The first in an increasingly complex series of missions, Artemis I will test NASA’s Space Launch System rocket and Orion spacecraft as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will land the first woman and the first person of color on the lunar surface, paving the way for long-term lunar presence and using the Moon as a steppingstone before venturing to Mars.
- Record ID
- KSC-20220812-PH-ILW01_0170
- NASA center
- KSC
- Date
- 2022-08-12
- Credit
- NASA/Isaac Watson
- Keywords
- Artemis, Artemis I, Award, Firing Room, KSC, Kennedy Space Center, LCC, Launch Control Center, certification, launch team
KSC · 2026-11-08 · KSC-20261108-PH-AJN01_0141
Artemis III Tour of IOZ
From left, NASA astronauts Bob Hines, Artemis III backup crew member; ESA (European Space Agency) astronaut Luca Parmitano, Artemis III pilot; and NASA astronaut Randy Bresnik, Artemis III…
Inspect NASA record
From left, NASA astronauts Bob Hines, Artemis III backup crew member; ESA (European Space Agency) astronaut Luca Parmitano, Artemis III pilot; and NASA astronaut Randy Bresnik, Artemis III commander, get a closer look at the work underway on the Artemis III Orion spacecraft inside the high bay of the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Sunday, Nov. 8, 2026. Bresnik and NASA astronauts Andre Douglas, Frank Rubio, and Parmitano will launch on the Artemis III mission to conduct critical rendezvous and docking tests with lunar lander systems in low Earth orbit, advancing the capabilities needed before astronauts return to the lunar surface on Artemis IV.
- Record ID
- KSC-20261108-PH-AJN01_0141
- NASA center
- KSC
- Date
- 2026-11-08
- Credit
- NASA/Amber Jean Notvest
- Keywords
- Artemis, Artemis III, Artemis III astronauts, KSC, Orion
HQ · 2026-03-24 · NHQ202603240050
NASA Update on Implementation of National Space Policy
NASA Space Reactor Office Program Executive Steve Sinacore speaks, as NASA Administrator Jared Isaacman, and NASA Associate Administrator Amit Kshatriya, right, look on, during an event where NASA…
Inspect NASA record
NASA Space Reactor Office Program Executive Steve Sinacore speaks, as NASA Administrator Jared Isaacman, and NASA Associate Administrator Amit Kshatriya, right, look on, during an event where NASA is outlining how the agency is executing President Donald J. Trump’s National Space Policy and accelerating preparations for America’s return to the surface of the Moon by 2028, Tuesday, March 24, 2026, at the Mary W. Jackson NASA Headquarters building in Washington. During the event NASA leadership provided updates on mission priorities, including sending the first astronauts to the lunar surface in more than 50 years, establishing the initial elements of a permanent lunar base, getting America underway in space on nuclear propulsion, and other objectives. Photo Credit: (NASA/Bill Ingalls)
- Record ID
- NHQ202603240050
- NASA center
- HQ
- Date
- 2026-03-24
- Credit
- NASA/Bill Ingalls
- Keywords
- Amit Kshatriya, DC, Jared Isaacman, Mary W. Jackson NASA Headquarters, NASA Administrator, Steve Sinacore, Washington
SSC · 2024-04-09 · SSC-20240409-s00484
Engine Removal Signals Completion of Successful Test Series
A work crew at NASA’s Stennis Space Center near Bay St. Louis, Mississippi removes RS-25 developmental engine E0525 from the Fred Haise Test Stand on April 9. Removal…
Inspect NASA record
A work crew at NASA’s Stennis Space Center near Bay St. Louis, Mississippi removes RS-25 developmental engine E0525 from the Fred Haise Test Stand on April 9. Removal of the engine follows completion of the second and final 12-test series for lead engines contractor Aerojet Rocketdyne, an L3Harris Technologies company, to certify and build new RS-25 engines for NASA’s SLS (Space Launch System) rockets that will power future lunar missions, beginning with Artemis V. Through Artemis, NASA will establish the foundation for long-term scientific exploration at the Moon; land the first woman, first person of color, and first international partner astronaut on the lunar surface; and prepare for human expeditions to Mars for the benefit of all.
- Record ID
- SSC-20240409-s00484
- NASA center
- SSC
- Date
- 2024-04-09
- Credit
- Danny Nowlin
KSC · 2011-07-25 · KSC-2011-5966
KSC-2011-5966
CAPE CANAVERAL, Fla. -- The Apollo/Saturn V Center at NASA's Kennedy Space Center in Florida hosted a celebration on the 40th anniversary of NASA's Apollo 15 mission. Apollo…
Inspect NASA record
CAPE CANAVERAL, Fla. -- The Apollo/Saturn V Center at NASA's Kennedy Space Center in Florida hosted a celebration on the 40th anniversary of NASA's Apollo 15 mission. Apollo 15 Commander Dave Scott and Command Module Pilot Al Worden and an elite gathering of Apollo-era astronauts were on hand for the event and panel discussion. Here, Gerry Griffin, Apollo 15 flight director, speaks to the invited guests. Worden circled the moon while Scott and the late Jim Irwin, the Lunar Module commander, made history when they became the first humans to drive a vehicle on the surface of the moon. They also provided extensive descriptions and photographic documentation of geologic features in the vicinity of the Hadley Rille landing site during their three days on the lunar surface. Photo credit: NASA/Kim Shiflett
- Record ID
- KSC-2011-5966
- NASA center
- KSC
- Date
- 2011-07-25
- Keywords
- apollo 15, 40th anniversary
KSC · 2026-11-08 · KSC-20261108-PH-AJN01_0142
Artemis III Tour of IOZ
From left, NASA astronaut Randy Bresnik, Artemis III commander; and ESA (European Space Agency) Luca Parmitano, Artemis III pilot; and NASA astronaut Bob Hines, Artemis III backup crew…
Inspect NASA record
From left, NASA astronaut Randy Bresnik, Artemis III commander; and ESA (European Space Agency) Luca Parmitano, Artemis III pilot; and NASA astronaut Bob Hines, Artemis III backup crew member, meet with NASA’s Orion team and get a closer look at the work underway on the Artemis III Orion spacecraft inside the high bay of the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Sunday, Nov. 8, 2026. Bresnik and NASA astronauts Andre Douglas, Frank Rubio, and Parmitano will launch on the Artemis III mission to conduct critical rendezvous and docking tests with lunar lander systems in low Earth orbit, advancing the capabilities needed before astronauts return to the lunar surface on Artemis IV.
- Record ID
- KSC-20261108-PH-AJN01_0142
- NASA center
- KSC
- Date
- 2026-11-08
- Credit
- NASA/Amber Jean Notvest
- Keywords
- Artemis, Artemis III, Artemis III astronauts, KSC, Orion
KSC · 2008-10-22 · KSC-08pd3405
KSC-08pd3405
SRIHARIKOTA, India – The Indian Space Research Organization, or ISRO, launches its robotic Chandrayaan-1 rocket with two NASA instruments aboard on India's maiden moon voyage to map the…
Inspect NASA record
SRIHARIKOTA, India – The Indian Space Research Organization, or ISRO, launches its robotic Chandrayaan-1 rocket with two NASA instruments aboard on India's maiden moon voyage to map the lunar surface. The Moon Mineralogy Mapper will assess mineral resources, and the Miniature Synthetic Aperture Radar, or Mini-SAR, will map the polar regions and look for ice deposits. Data from the two instruments will contribute to NASA's increased understanding of the lunar environment as it implements the nation's space exploration policy, which calls for robotic and human missions to the moon. In addition to the two science instruments, NASA will provide space communications support to Chandrayaan-1. The primary location for the NASA ground tracking station will be at the Johns Hopkins University Applied Physics Laboratory in Laurel, Md. Photo credit: NASA
- Record ID
- KSC-08pd3405
- NASA center
- KSC
- Date
- 2008-10-22