Update Site (from NASA)
Explore NASA’s Image and Video Library.
Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.
Sign in to suggest a Marvel.
Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.
NASA image records
MAF · 2022-09-16 · MAF_20220916_CS4_FwdSkirtVWC04
Forward Skirt for Artemis IV’s Core Stage Moves to Next Phase of Production
Crews at NASA’s Michoud Assembly Facility in New Orleans lift the forward skirt of a core stage that will power NASA’s Space Launch System (SLS) rocket out of…
Inspect NASA record
Crews at NASA’s Michoud Assembly Facility in New Orleans lift the forward skirt of a core stage that will power NASA’s Space Launch System (SLS) rocket out of the Vertical Weld Center Sept. 16, 2022. The forward skirt will be used for NASA’s Artemis IV mission. The hardware houses flight computers, cameras, and avionics systems for the SLS rocket. The SLS core stage is made up of five unique elements: the forward skirt, liquid oxygen tank, intertank, liquid hydrogen tank, and the engine section. When fully stacked, the forward skirt is located at the top of the 212-foot-tall core stage and connects to the upper part of the rocket. The core stage and its four RS-25 engines provide more than 2 million pounds of thrust to help power NASA’s next-generation lunar missions. Image credit: NASA/Michael DeMocker
- Record ID
- MAF_20220916_CS4_FwdSkirtVWC04
- NASA center
- MAF
- Date
- 2022-09-16
- Credit
- Michael DeMocker
- Keywords
- SLS, MAF, Michoud Assembly Facility, MSFC, Marshall, Artemis, Exploration, Louisiana, Mars, Moon, NASA, New Orleans
KSC · 2025-07-10 · KSC-20260710-PH-FMX01_0029
Artemis III Crew Visit
Artemis III crew members, NASA astronauts Randy Bresnik (center) and Andre Douglas (right), speak to Jim Skaggs, Spacecraft Flow Manager for Lockheed Martin, inside the high bay of the…
Inspect NASA record
Artemis III crew members, NASA astronauts Randy Bresnik (center) and Andre Douglas (right), speak to Jim Skaggs, Spacecraft Flow Manager for Lockheed Martin, inside the high bay of the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Friday, July 10, 2026. The astronauts met with Orion teams and got a closer look at the Orion spacecraft inside the facility. Bresnik, Douglas, NASA astronaut Frank Rubio, and ESA (European Space Agency) astronaut Luca Parmitano will launch on the Artemis III mission to conduct critical rendezvous and docking tests with lunar lander systems in low Earth orbit, advancing the capabilities needed before astronauts return to the lunar surface on Artemis IV.
- Record ID
- KSC-20260710-PH-FMX01_0029
- NASA center
- KSC
- Date
- 2025-07-10
- Credit
- NASA/Frank Michaux
- Keywords
- Mars, Exploration Ground Systems, Kennedy Space Center, EGS, Vehicle Assembly Building, VAB, KSC, Moon, Artemis III, Spaceport, Artemis
HQ · 2026-03-24 · NHQ202603240068
NASA Update on Implementation of National Space Policy
NASA Headquarters lobby is seen with models of the Mars 2020 Perseverance Rover, and Advanced Composite Solar Sail System (ACS3) on display ahead of an event where NASA…
Inspect NASA record
NASA Headquarters lobby is seen with models of the Mars 2020 Perseverance Rover, and Advanced Composite Solar Sail System (ACS3) on display ahead of an event where NASA outlined how the agency is executing President Donald J. Trump’s National Space Policy and accelerating preparations for America’s return to the surface of the Moon by 2028, Tuesday, March 24, 2026, at the Mary W. Jackson NASA Headquarters building in Washington. During the event NASA leadership provided updates on mission priorities, including sending the first astronauts to the lunar surface in more than 50 years, establishing the initial elements of a permanent lunar base, getting America underway in space on nuclear propulsion, and other objectives. Photo Credit: (NASA/Bill Ingalls)
- Record ID
- NHQ202603240068
- NASA center
- HQ
- Date
- 2026-03-24
- Credit
- NASA/Bill Ingalls
- Keywords
- Advanced Composite Solar Sail System (ACS3), DC, Mars 2020 Perseverance Rover, Mary W. Jackson NASA Headquarters, Washington
JSC · 1968-12-21 · S68-55999
APOLLO VIII - LAUNCH - KSC
S68-55999 (21 Dec. 1968) --- The Apollo 8 crew leaves the Kennedy Space Center's (KSC) Manned Spacecraft Operations Building (MSOB) during the Apollo 8 prelaunch countdown. Astronaut Frank…
Inspect NASA record
S68-55999 (21 Dec. 1968) --- The Apollo 8 crew leaves the Kennedy Space Center's (KSC) Manned Spacecraft Operations Building (MSOB) during the Apollo 8 prelaunch countdown. Astronaut Frank Borman (waving to well-wishers), commander, leads followed by astronauts James A. Lovell Jr., command module pilot; and William A. Anders, lunar module pilot. The crew is about to enter a special transfer van which transported them to Pad A, Launch Complex 39, where their Apollo 8 (Spacecraft 103/Saturn 503) space vehicle awaited them. Liftoff for the lunar orbit mission was at 7:51 a.m. (EST). Holding the door to the transfer van is Charles Buckley, KSC security chief.
- Record ID
- S68-55999
- NASA center
- JSC
- Date
- 1968-12-21
MSFC · 1971-01-01 · 0101294
Saturn Apollo Program
This artist's concept illustrates the deployment sequence of the Lunar Roving Vehicle (LRV) on the Moon. The LRV was designed to transport astronauts and materials on the Moon.…
Inspect NASA record
This artist's concept illustrates the deployment sequence of the Lunar Roving Vehicle (LRV) on the Moon. The LRV was designed to transport astronauts and materials on the Moon. It was a collapsible open-space vehicle about 10 feet long with large mesh wheels, anterna, appendages, tool caddies, and cameras. Powered by two 36-volt batteries, it has four 1/4-hp drive motors, one for each wheel. The vehicle was designed to travel in forward or reverse, negotiate obstacles about 1 foot high, cross crevasses about 2 feet wide, and climb or descend moderate slopes. Its speed limit was about 9 miles (14 kilometers) per hour. An LRV was used on each of the last three Apollo missions (Apollo 15, Apollo 16, and Apollo 17) and permitted the crew to travel several miles from the Lunar Module. The LRV was designed, developed, and tested by the Marshall Space Flight Center, and built by the Boeing Plant in Kent, Washington.
- Record ID
- 0101294
- NASA center
- MSFC
- Date
- 1971-01-01
- Keywords
- Lunar Roving Vehicle, RLV
KSC · 2022-06-06 · KSC-20220606-PH-JBS01_0120
Artemis I WDR Rollout #2
Seen here is a close-up view of the Orion spacecraft atop the Space Launch System (SLS) rocket as it rolls to Launch Complex 39B at NASA’s Kennedy Space…
Inspect NASA record
Seen here is a close-up view of the Orion spacecraft atop the Space Launch System (SLS) rocket as it rolls to Launch Complex 39B at NASA’s Kennedy Space Center in Florida on June 6, 2022. Carried by the 6.65-million-pound crawler-transporter 2, the rocket is traveling to the launch pad for NASA’s next wet dress rehearsal attempt ahead of the Artemis I launch. The first in an increasingly complex series of missions, Artemis I will test SLS and Orion as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will land the first woman and first person of color on the lunar surface, paving the way for a long-term lunar presence and using the Moon as a steppingstone before venturing to Mars.
- Record ID
- KSC-20220606-PH-JBS01_0120
- NASA center
- KSC
- Date
- 2022-06-06
- Credit
- NASA/Ben Smegelsky
- Keywords
- Artemis, Artemis I, EGS, KSC, Orion, Pad 39B, Rollout, SLS, VAB
HQ · 2026-03-24 · NHQ202603240053
NASA Update on Implementation of National Space Policy
NASA Space Reactor Office Program Executive Steve Sinacore speaks, as NASA Administrator Jared Isaacman, and NASA Associate Administrator Amit Kshatriya, right, look on, during an event where NASA…
Inspect NASA record
NASA Space Reactor Office Program Executive Steve Sinacore speaks, as NASA Administrator Jared Isaacman, and NASA Associate Administrator Amit Kshatriya, right, look on, during an event where NASA is outlining how the agency is executing President Donald J. Trump’s National Space Policy and accelerating preparations for America’s return to the surface of the Moon by 2028, Tuesday, March 24, 2026, at the Mary W. Jackson NASA Headquarters building in Washington. During the event NASA leadership provided updates on mission priorities, including sending the first astronauts to the lunar surface in more than 50 years, establishing the initial elements of a permanent lunar base, getting America underway in space on nuclear propulsion, and other objectives. Photo Credit: (NASA/Bill Ingalls)
- Record ID
- NHQ202603240053
- NASA center
- HQ
- Date
- 2026-03-24
- Credit
- NASA/Bill Ingalls
- Keywords
- Amit Kshatriya, DC, Jared Isaacman, Mary W. Jackson NASA Headquarters, NASA Administrator, Steve Sinacore, Washington
HQ · 2026-03-25 · NHQ202603250001
NASA Update on Implementation of National Space Policy
NASA Headquarters lobby is seen with a model of the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) on display during a 2-day event where NASA…
Inspect NASA record
NASA Headquarters lobby is seen with a model of the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) on display during a 2-day event where NASA outlined how the agency is executing President Donald J. Trump’s National Space Policy and accelerating preparations for America’s return to the surface of the Moon by 2028, Wednesday, March 25, 2026, at the Mary W. Jackson NASA Headquarters building in Washington. During the event NASA leadership provided updates on mission priorities, including sending the first astronauts to the lunar surface in more than 50 years, establishing the initial elements of a permanent lunar base, getting America underway in space on nuclear propulsion, and other objectives. Photo Credit: (NASA/Bill Ingalls)
- Record ID
- NHQ202603250001
- NASA center
- HQ
- Date
- 2026-03-25
- Credit
- NASA/Bill Ingalls
- Keywords
- Cislunar Autonomous Positioning System Technology Operations and, DC, Mary W. Jackson NASA Headquarters, Washington
HQ · 2026-03-24 · NHQ202603240077
NASA Update on Implementation of National Space Policy
NASA Headquarters lobby is seen with models of the Mars 2020 Perseverance Rover, and Advanced Composite Solar Sail System (ACS3) on display ahead of an event where NASA…
Inspect NASA record
NASA Headquarters lobby is seen with models of the Mars 2020 Perseverance Rover, and Advanced Composite Solar Sail System (ACS3) on display ahead of an event where NASA outlined how the agency is executing President Donald J. Trump’s National Space Policy and accelerating preparations for America’s return to the surface of the Moon by 2028, Tuesday, March 24, 2026, at the Mary W. Jackson NASA Headquarters building in Washington. During the event NASA leadership provided updates on mission priorities, including sending the first astronauts to the lunar surface in more than 50 years, establishing the initial elements of a permanent lunar base, getting America underway in space on nuclear propulsion, and other objectives. Photo Credit: (NASA/Bill Ingalls)
- Record ID
- NHQ202603240077
- NASA center
- HQ
- Date
- 2026-03-24
- Credit
- NASA/Bill Ingalls
- Keywords
- Advanced Composite Solar Sail System (ACS3), DC, Mars 2020 Perseverance Rover, Mary W. Jackson NASA Headquarters, Washington
KSC · 2025-07-10 · KSC-20260710-PH-FMX01_0203
Artemis III Crew Visit
Artemis III crew member, NASA astronaut Randy Bresnik enters NASA’s Artemis IV Orion spacecraft inside the high bay of the Neil A. Armstrong Operations and Checkout Building at NASA’s…
Inspect NASA record
Artemis III crew member, NASA astronaut Randy Bresnik enters NASA’s Artemis IV Orion spacecraft inside the high bay of the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Friday, July 10, 2026. Bresnik and fellow Artemis III crew member, NASA astronaut Andre Douglas, met with Orion teams and got a closer look at the work underway on the Orion spacecraft inside the facility. Bresnik, Douglas, NASA astronaut Frank Rubio, and ESA (European Space Agency) astronaut Luca Parmitano will launch on the Artemis III mission to conduct critical rendezvous and docking tests with lunar lander systems in low Earth orbit, advancing the capabilities needed before astronauts return to the lunar surface on Artemis IV.
- Record ID
- KSC-20260710-PH-FMX01_0203
- NASA center
- KSC
- Date
- 2025-07-10
- Credit
- NASA/Frank Michaux
- Keywords
- Mars, Exploration Ground Systems, Kennedy Space Center, EGS, Vehicle Assembly Building, VAB, KSC, Moon, Artemis III, Spaceport, Artemis
HQ · 2026-03-24 · NHQ202603240033
NASA Update on Implementation of National Space Policy
NASA International Space Station Program Manager Dana Weigel speaks, as NASA Administrator Jared Isaacman, and NASA Associate Administrator Amit Kshatriya, right, look on, during an event where NASA…
Inspect NASA record
NASA International Space Station Program Manager Dana Weigel speaks, as NASA Administrator Jared Isaacman, and NASA Associate Administrator Amit Kshatriya, right, look on, during an event where NASA is outlining how the agency is executing President Donald J. Trump’s National Space Policy and accelerating preparations for America’s return to the surface of the Moon by 2028, Tuesday, March 24, 2026, at the Mary W. Jackson NASA Headquarters building in Washington. During the event NASA leadership provided updates on mission priorities, including sending the first astronauts to the lunar surface in more than 50 years, establishing the initial elements of a permanent lunar base, getting America underway in space on nuclear propulsion, and other objectives. Photo Credit: (NASA/Bill Ingalls)
- Record ID
- NHQ202603240033
- NASA center
- HQ
- Date
- 2026-03-24
- Credit
- NASA/Bill Ingalls
- Keywords
- Amit Kshatriya, DC, Dana Weigel, Jared Isaacman, Mary W. Jackson NASA Headquarters, Washington