Update Site (from NASA)
Explore NASA’s Image and Video Library.
Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.
Sign in to suggest a Marvel.
Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.
NASA image records
KSC · 2019-05-23 · KSC-20190523-PH_KLS02_0002
Apollo 11 Media Day
NASA Kennedy Space Center’s Director Bob Cabana, at the podium, speaks to members of the news media at the NASA News Center on May 23, 2019. At left…
Inspect NASA record
NASA Kennedy Space Center’s Director Bob Cabana, at the podium, speaks to members of the news media at the NASA News Center on May 23, 2019. At left is NASA Administrator Jim Bridenstine. News media were at the center for an Apollo 11 Media Day. They toured several facilities, including the Vehicle Assembly and Launch Complex 39B for a look back at the Apollo missions and a look ahead to NASA’s new Moon 2024 initiative, the Artemis 1 mission and the Gateway lunar outpost.
- Record ID
- KSC-20190523-PH_KLS02_0002
- NASA center
- KSC
- Date
- 2019-05-23
- Credit
- NASA/Kim Shiflett
- Keywords
- KSC Events, Apollo 11 Media Day, NASA Administrator, Jim Bridenstine, Kennedy Space Center, Moon 2024, NASA News Center, Launch Complex 39 area, Bob Cabana
KSC · 2025-05-03 · KSC-20250503-PH-KLS02_0023
Artemis II Orion DD250 Roll to MPPF
NASA’s Artemis II Orion spacecraft arrives at the Multi-Payload Processing Facility at Kennedy Space Center in Florida on Saturday, May 3, 2025, to undergo fueling and processing operations…
Inspect NASA record
NASA’s Artemis II Orion spacecraft arrives at the Multi-Payload Processing Facility at Kennedy Space Center in Florida on Saturday, May 3, 2025, to undergo fueling and processing operations for prelaunch operations. The Artemis II test flight is the first crewed flight under NASA’s Artemis campaign and is another step toward missions on the lunar surface and helping the agency prepare for future human missions to Mars.
- Record ID
- KSC-20250503-PH-KLS02_0023
- NASA center
- KSC
- Date
- 2025-05-03
- Credit
- NASA/Kim Shiflett
- Keywords
- John. F. Kennedy Space Center, Kennedy, Kennedy Space Center, KSC, Spaceport, Cape Canaveral, NASA, rocket ranch, Florida, multi-user spaceport, premier spaceport, space coast
KSC · 2023-08-07 · KSC-20230807-PH-KLS01_0470
Artemis II Crew with EGS
Artemis II crew members inspect their Orion crew module inside the high bay of the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in…
Inspect NASA record
Artemis II crew members inspect their Orion crew module inside the high bay of the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, on Aug. 7, 2023. Pictured from left are Christina Hammock Koch, mission specialist, and Victor Glover, pilot. The crew module is undergoing acoustic testing ahead of integration with the European Service Module. Artemis II is the first crewed mission on NASA’s path to establishing a long-term lunar presence for science and exploration under Artemis.
- Record ID
- KSC-20230807-PH-KLS01_0470
- NASA center
- KSC
- Date
- 2023-08-07
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis II, Artemis II crew, Astronauts, EGS, Exploration Ground Systems, KSC, Kennedy Space Center
KSC · 2025-05-03 · KSC-20250503-PH-KLS01_0023
Artemis II Orion DD250 leaving the O&C
NASA’s KAMAG transporter carries the agency’s Artemis II Orion spacecraft from the Neil A. Armstrong Operations and Checkout Building to the Multi-Payload Processing Facility at Kennedy Space Center…
Inspect NASA record
NASA’s KAMAG transporter carries the agency’s Artemis II Orion spacecraft from the Neil A. Armstrong Operations and Checkout Building to the Multi-Payload Processing Facility at Kennedy Space Center in Florida on Saturday, May 3, 2025. The Orion spacecraft will undergo fueling and processing operations at the Multi-Function Facility. The Artemis II test flight is the first crewed flight under NASA’s Artemis campaign and is another step toward missions on the lunar surface and helping the agency prepare for future human missions to Mars.
- Record ID
- KSC-20250503-PH-KLS01_0023
- NASA center
- KSC
- Date
- 2025-05-03
- Credit
- NASA/Kim Shiflett
- Keywords
- John. F. Kennedy Space Center, Kennedy, Kennedy Space Center, KSC, Spaceport, Cape Canaveral, NASA, rocket ranch, Florida, multi-user spaceport, premier spaceport, space coast
KSC · 2026-02-17 · KSC-20260217-PH-JBS01_0002
Artemis III ESM3 Engine Nozzle Install Completion
Teams prepare for the installation of the engine nozzle onto the European Service Module for NASA’s Artemis III mission on Tuesday, Feb. 17, 2026, inside the high bay…
Inspect NASA record
Teams prepare for the installation of the engine nozzle onto the European Service Module for NASA’s Artemis III mission on Tuesday, Feb. 17, 2026, inside the high bay of the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida. The service module provides the Orion spacecraft’s propulsion, thermal control, electrical power, and life support systems during the Artemis III mission to send humans to explore the lunar South Pole region.
- Record ID
- KSC-20260217-PH-JBS01_0002
- NASA center
- KSC
- Date
- 2026-02-17
- Credit
- NASA/Ben Smegelsky
- Keywords
- Artemis, Artemis III, Orion, service module
KSC · 2023-08-08 · KSC-20230808-PH-KLS02_0030
KSC Orion Media Day - Artemis II Crew
Artemis II mission pilot Victor Glover smiles inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Aug. 8, 2023. The Artemis…
Inspect NASA record
Artemis II mission pilot Victor Glover smiles inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Aug. 8, 2023. The Artemis II Orion crew module is undergoing acoustic testing ahead of integration with the European Service Module. Artemis II is the first crewed mission on NASA’s path to establishing a long-term lunar presence for science and exploration under Artemis.
- Record ID
- KSC-20230808-PH-KLS02_0030
- NASA center
- KSC
- Date
- 2023-08-08
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis, Artemis II, Artemis III, Artemis IV, CM, ESM, European service module, KSC, Kennedy Space Center, Moon, Moon to Mars, O&C
MSFC · 1968-01-01 · 0100803
Saturn Apollo Program
This 1968 chart depicts the various mission configurations for the Saturn IB launch vehicle. Developed by the Marshall Space Flight Center (MSFC) as an interim vehicle in MSFC's…
Inspect NASA record
This 1968 chart depicts the various mission configurations for the Saturn IB launch vehicle. Developed by the Marshall Space Flight Center (MSFC) as an interim vehicle in MSFC's "building block" approach to the Saturn rocket development, the Saturn IB utilized Saturn I technology to further develop and refine the larger boosters and the Apollo spacecraft capabilities required for the marned lunar missions.
- Record ID
- 0100803
- NASA center
- MSFC
- Date
- 1968-01-01
- Keywords
- Saturn IB
KSC · 2025-03-23 · KSC-20250323-PH-FMX01_0234
Core Stage Lift to Vertical for Move to High Bay 3
Teams with NASA’s Exploration Ground Systems and primary contractor Amentum, integrate the SLS (Space Launch System) Moon rocket with the solid rocket boosters onto mobile launcher 1 inside…
Inspect NASA record
Teams with NASA’s Exploration Ground Systems and primary contractor Amentum, integrate the SLS (Space Launch System) Moon rocket with the solid rocket boosters onto mobile launcher 1 inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center on Sunday, March 23, 2025. Artemis II is the first crewed test flight under NASA’s Artemis campaign and is another step toward missions on the lunar surface and helping the agency prepare for future human missions to Mars.
- Record ID
- KSC-20250323-PH-FMX01_0234
- NASA center
- KSC
- Date
- 2025-03-23
- Credit
- NASA/Frank Michaux
- Keywords
- John. F. Kennedy Space Center, Kennedy, Kennedy Space Center, KSC, Spaceport, Cape Canaveral, NASA, rocket ranch, Florida, multi-user spaceport, premier spaceport, space coast
KSC · 2019-05-23 · KSC-20190523-PH_KLS01_0021
Apollo 11 Media Day
NASA Administrator Jim Bridenstine speaks to members of the news media at the NASA News Center on May 23, 2019. News media were at the center for an…
Inspect NASA record
NASA Administrator Jim Bridenstine speaks to members of the news media at the NASA News Center on May 23, 2019. News media were at the center for an Apollo 11 Media Day. They toured several facilities, including the Vehicle Assembly and Launch Complex 39B for a look back at the Apollo missions and a look ahead to NASA’s new Moon 2024 initiative, the Artemis 1 mission and the Gateway lunar outpost.
- Record ID
- KSC-20190523-PH_KLS01_0021
- NASA center
- KSC
- Date
- 2019-05-23
- Credit
- NASA/Kim Shiflett
- Keywords
- KSC Events, Apollo 11 Media Day, NASA Administrator, Jim Bridenstine, Kennedy Space Center, Moon 2024, NASA News Center, Launch Complex 39 area, Bob Cabana
JSC · 1969-02-20 · S69-19797
ART CONCEPTS - APOLLO IX
S69-19797 (February 1969) --- Composite of two artist's concepts illustrating key events, tasks and activities from the sixth through the ninth day of the Apollo 9 mission, including…
Inspect NASA record
S69-19797 (February 1969) --- Composite of two artist's concepts illustrating key events, tasks and activities from the sixth through the ninth day of the Apollo 9 mission, including service propulsion system burns, and landmark sightings, photograph special tests. The Apollo 9 mission will evaluate spacecraft lunar module systems performance during manned Earth-orbital flight.
- Record ID
- S69-19797
- NASA center
- JSC
- Date
- 1969-02-20
- Keywords
- LAUNCHING, SEQUENCING
KSC · 2025-03-22 · KSC-20250323-PH-FMX01_0207
Core Stage Lift to Vertical for Move to High Bay 3
Teams with NASA’s Exploration Ground Systems and primary contractor Amentum, integrate the SLS (Space Launch System) Moon rocket with the solid rocket boosters onto mobile launcher 1 inside…
Inspect NASA record
Teams with NASA’s Exploration Ground Systems and primary contractor Amentum, integrate the SLS (Space Launch System) Moon rocket with the solid rocket boosters onto mobile launcher 1 inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center on Sunday, March 23, 2025. Artemis II is the first crewed test flight under NASA’s Artemis campaign and is another step toward missions on the lunar surface and helping the agency prepare for future human missions to Mars.
- Record ID
- KSC-20250323-PH-FMX01_0207
- NASA center
- KSC
- Date
- 2025-03-22
- Credit
- NASA/Frank Michaux
- Keywords
- John. F. Kennedy Space Center, Kennedy, Kennedy Space Center, KSC, Spaceport, Cape Canaveral, NASA, rocket ranch, Florida, multi-user spaceport, premier spaceport, space coast
KSC · 2023-08-08 · KSC-20230808-PH-KLS02_0050
KSC Orion Media Day - Artemis II Crew
Artemis II mission specialist Christina Hammock Koch poses inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Aug. 8, 2023. The…
Inspect NASA record
Artemis II mission specialist Christina Hammock Koch poses inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Aug. 8, 2023. The Artemis II Orion crew module is undergoing acoustic testing ahead of integration with the European Service Module. Artemis II is the first crewed mission on NASA’s path to establishing a long-term lunar presence for science and exploration under Artemis.
- Record ID
- KSC-20230808-PH-KLS02_0050
- NASA center
- KSC
- Date
- 2023-08-08
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis, Artemis II, Artemis III, Artemis IV, CM, ESM, European service module, KSC, Kennedy Space Center, Moon, Moon to Mars, O&C