Interstellar Minds

‹ Interstellar Minds

Update Site (from NASA)

Explore NASA’s Image and Video Library.

Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.

Sign in to suggest a Marvel.

Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.

NASA image records

Apollo 11 Media Day

KSC · 2019-05-23 · KSC-20190523-PH_KLS02_0002

Apollo 11 Media Day

NASA Kennedy Space Center’s Director Bob Cabana, at the podium, speaks to members of the news media at the NASA News Center on May 23, 2019. At left…

Inspect NASA record

NASA Kennedy Space Center’s Director Bob Cabana, at the podium, speaks to members of the news media at the NASA News Center on May 23, 2019. At left is NASA Administrator Jim Bridenstine. News media were at the center for an Apollo 11 Media Day. They toured several facilities, including the Vehicle Assembly and Launch Complex 39B for a look back at the Apollo missions and a look ahead to NASA’s new Moon 2024 initiative, the Artemis 1 mission and the Gateway lunar outpost.

Record ID
KSC-20190523-PH_KLS02_0002
NASA center
KSC
Date
2019-05-23
Credit
NASA/Kim Shiflett
Keywords
KSC Events, Apollo 11 Media Day, NASA Administrator, Jim Bridenstine, Kennedy Space Center, Moon 2024, NASA News Center, Launch Complex 39 area, Bob Cabana
Artemis II Orion DD250 Roll to MPPF

KSC · 2025-05-03 · KSC-20250503-PH-KLS02_0023

Artemis II Orion DD250 Roll to MPPF

NASA’s Artemis II Orion spacecraft arrives at the Multi-Payload Processing Facility at Kennedy Space Center in Florida on Saturday, May 3, 2025, to undergo fueling and processing operations…

Inspect NASA record

NASA’s Artemis II Orion spacecraft arrives at the Multi-Payload Processing Facility at Kennedy Space Center in Florida on Saturday, May 3, 2025, to undergo fueling and processing operations for prelaunch operations. The Artemis II test flight is the first crewed flight under NASA’s Artemis campaign and is another step toward missions on the lunar surface and helping the agency prepare for future human missions to Mars.

Record ID
KSC-20250503-PH-KLS02_0023
NASA center
KSC
Date
2025-05-03
Credit
NASA/Kim Shiflett
Keywords
John. F. Kennedy Space Center, Kennedy, Kennedy Space Center, KSC, Spaceport, Cape Canaveral, NASA, rocket ranch, Florida, multi-user spaceport, premier spaceport, space coast
Artemis II Crew with EGS

KSC · 2023-08-07 · KSC-20230807-PH-KLS01_0470

Artemis II Crew with EGS

Artemis II crew members inspect their Orion crew module inside the high bay of the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in…

Inspect NASA record

Artemis II crew members inspect their Orion crew module inside the high bay of the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, on Aug. 7, 2023. Pictured from left are Christina Hammock Koch, mission specialist, and Victor Glover, pilot. The crew module is undergoing acoustic testing ahead of integration with the European Service Module. Artemis II is the first crewed mission on NASA’s path to establishing a long-term lunar presence for science and exploration under Artemis.

Record ID
KSC-20230807-PH-KLS01_0470
NASA center
KSC
Date
2023-08-07
Credit
NASA/Kim Shiflett
Keywords
Artemis II, Artemis II crew, Astronauts, EGS, Exploration Ground Systems, KSC, Kennedy Space Center
Artemis II Orion DD250 leaving the O&C

KSC · 2025-05-03 · KSC-20250503-PH-KLS01_0023

Artemis II Orion DD250 leaving the O&C

NASA’s KAMAG transporter carries the agency’s Artemis II Orion spacecraft from the Neil A. Armstrong Operations and Checkout Building to the Multi-Payload Processing Facility at Kennedy Space Center…

Inspect NASA record

NASA’s KAMAG transporter carries the agency’s Artemis II Orion spacecraft from the Neil A. Armstrong Operations and Checkout Building to the Multi-Payload Processing Facility at Kennedy Space Center in Florida on Saturday, May 3, 2025. The Orion spacecraft will undergo fueling and processing operations at the Multi-Function Facility. The Artemis II test flight is the first crewed flight under NASA’s Artemis campaign and is another step toward missions on the lunar surface and helping the agency prepare for future human missions to Mars.

Record ID
KSC-20250503-PH-KLS01_0023
NASA center
KSC
Date
2025-05-03
Credit
NASA/Kim Shiflett
Keywords
John. F. Kennedy Space Center, Kennedy, Kennedy Space Center, KSC, Spaceport, Cape Canaveral, NASA, rocket ranch, Florida, multi-user spaceport, premier spaceport, space coast
Artemis III ESM3 Engine Nozzle Install Completion

KSC · 2026-02-17 · KSC-20260217-PH-JBS01_0002

Artemis III ESM3 Engine Nozzle Install Completion

Teams prepare for the installation of the engine nozzle onto the European Service Module for NASA’s Artemis III mission on Tuesday, Feb. 17, 2026, inside the high bay…

Inspect NASA record

Teams prepare for the installation of the engine nozzle onto the European Service Module for NASA’s Artemis III mission on Tuesday, Feb. 17, 2026, inside the high bay of the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida. The service module provides the Orion spacecraft’s propulsion, thermal control, electrical power, and life support systems during the Artemis III mission to send humans to explore the lunar South Pole region.

Record ID
KSC-20260217-PH-JBS01_0002
NASA center
KSC
Date
2026-02-17
Credit
NASA/Ben Smegelsky
Keywords
Artemis, Artemis III, Orion, service module
KSC Orion Media Day - Artemis II Crew

KSC · 2023-08-08 · KSC-20230808-PH-KLS02_0030

KSC Orion Media Day - Artemis II Crew

Artemis II mission pilot Victor Glover smiles inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Aug. 8, 2023. The Artemis…

Inspect NASA record

Artemis II mission pilot Victor Glover smiles inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Aug. 8, 2023. The Artemis II Orion crew module is undergoing acoustic testing ahead of integration with the European Service Module. Artemis II is the first crewed mission on NASA’s path to establishing a long-term lunar presence for science and exploration under Artemis.

Record ID
KSC-20230808-PH-KLS02_0030
NASA center
KSC
Date
2023-08-08
Credit
NASA/Kim Shiflett
Keywords
Artemis, Artemis II, Artemis III, Artemis IV, CM, ESM, European service module, KSC, Kennedy Space Center, Moon, Moon to Mars, O&C
Saturn Apollo Program

MSFC · 1968-01-01 · 0100803

Saturn Apollo Program

This 1968 chart depicts the various mission configurations for the Saturn IB launch vehicle. Developed by the Marshall Space Flight Center (MSFC) as an interim vehicle in MSFC's…

Inspect NASA record

This 1968 chart depicts the various mission configurations for the Saturn IB launch vehicle. Developed by the Marshall Space Flight Center (MSFC) as an interim vehicle in MSFC's "building block" approach to the Saturn rocket development, the Saturn IB utilized Saturn I technology to further develop and refine the larger boosters and the Apollo spacecraft capabilities required for the marned lunar missions.

Record ID
0100803
NASA center
MSFC
Date
1968-01-01
Keywords
Saturn IB
Core Stage Lift to Vertical for Move to High Bay 3

KSC · 2025-03-23 · KSC-20250323-PH-FMX01_0234

Core Stage Lift to Vertical for Move to High Bay 3

Teams with NASA’s Exploration Ground Systems and primary contractor Amentum, integrate the SLS (Space Launch System) Moon rocket with the solid rocket boosters onto mobile launcher 1 inside…

Inspect NASA record

Teams with NASA’s Exploration Ground Systems and primary contractor Amentum, integrate the SLS (Space Launch System) Moon rocket with the solid rocket boosters onto mobile launcher 1 inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center on Sunday, March 23, 2025. Artemis II is the first crewed test flight under NASA’s Artemis campaign and is another step toward missions on the lunar surface and helping the agency prepare for future human missions to Mars.

Record ID
KSC-20250323-PH-FMX01_0234
NASA center
KSC
Date
2025-03-23
Credit
NASA/Frank Michaux
Keywords
John. F. Kennedy Space Center, Kennedy, Kennedy Space Center, KSC, Spaceport, Cape Canaveral, NASA, rocket ranch, Florida, multi-user spaceport, premier spaceport, space coast
Apollo 11 Media Day

KSC · 2019-05-23 · KSC-20190523-PH_KLS01_0021

Apollo 11 Media Day

NASA Administrator Jim Bridenstine speaks to members of the news media at the NASA News Center on May 23, 2019. News media were at the center for an…

Inspect NASA record

NASA Administrator Jim Bridenstine speaks to members of the news media at the NASA News Center on May 23, 2019. News media were at the center for an Apollo 11 Media Day. They toured several facilities, including the Vehicle Assembly and Launch Complex 39B for a look back at the Apollo missions and a look ahead to NASA’s new Moon 2024 initiative, the Artemis 1 mission and the Gateway lunar outpost.

Record ID
KSC-20190523-PH_KLS01_0021
NASA center
KSC
Date
2019-05-23
Credit
NASA/Kim Shiflett
Keywords
KSC Events, Apollo 11 Media Day, NASA Administrator, Jim Bridenstine, Kennedy Space Center, Moon 2024, NASA News Center, Launch Complex 39 area, Bob Cabana
ART CONCEPTS - APOLLO IX

JSC · 1969-02-20 · S69-19797

ART CONCEPTS - APOLLO IX

S69-19797 (February 1969) --- Composite of two artist's concepts illustrating key events, tasks and activities from the sixth through the ninth day of the Apollo 9 mission, including…

Inspect NASA record

S69-19797 (February 1969) --- Composite of two artist's concepts illustrating key events, tasks and activities from the sixth through the ninth day of the Apollo 9 mission, including service propulsion system burns, and landmark sightings, photograph special tests. The Apollo 9 mission will evaluate spacecraft lunar module systems performance during manned Earth-orbital flight.

Record ID
S69-19797
NASA center
JSC
Date
1969-02-20
Keywords
LAUNCHING, SEQUENCING
Core Stage Lift to Vertical for Move to High Bay 3

KSC · 2025-03-22 · KSC-20250323-PH-FMX01_0207

Core Stage Lift to Vertical for Move to High Bay 3

Teams with NASA’s Exploration Ground Systems and primary contractor Amentum, integrate the SLS (Space Launch System) Moon rocket with the solid rocket boosters onto mobile launcher 1 inside…

Inspect NASA record

Teams with NASA’s Exploration Ground Systems and primary contractor Amentum, integrate the SLS (Space Launch System) Moon rocket with the solid rocket boosters onto mobile launcher 1 inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center on Sunday, March 23, 2025. Artemis II is the first crewed test flight under NASA’s Artemis campaign and is another step toward missions on the lunar surface and helping the agency prepare for future human missions to Mars.

Record ID
KSC-20250323-PH-FMX01_0207
NASA center
KSC
Date
2025-03-22
Credit
NASA/Frank Michaux
Keywords
John. F. Kennedy Space Center, Kennedy, Kennedy Space Center, KSC, Spaceport, Cape Canaveral, NASA, rocket ranch, Florida, multi-user spaceport, premier spaceport, space coast
KSC Orion Media Day - Artemis II Crew

KSC · 2023-08-08 · KSC-20230808-PH-KLS02_0050

KSC Orion Media Day - Artemis II Crew

Artemis II mission specialist Christina Hammock Koch poses inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Aug. 8, 2023. The…

Inspect NASA record

Artemis II mission specialist Christina Hammock Koch poses inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Aug. 8, 2023. The Artemis II Orion crew module is undergoing acoustic testing ahead of integration with the European Service Module. Artemis II is the first crewed mission on NASA’s path to establishing a long-term lunar presence for science and exploration under Artemis.

Record ID
KSC-20230808-PH-KLS02_0050
NASA center
KSC
Date
2023-08-08
Credit
NASA/Kim Shiflett
Keywords
Artemis, Artemis II, Artemis III, Artemis IV, CM, ESM, European service module, KSC, Kennedy Space Center, Moon, Moon to Mars, O&C