Update Site (from NASA)
Explore NASA’s Image and Video Library.
Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.
Sign in to suggest a Marvel.
Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.
NASA image records
JSC · 1969-02-20 · S69-19798
ART CONCEPTS - APOLLO IX
S69-19798 (February 1969) --- Composite of three artist's concepts illustrating key events, tasks and activities on the tenth day of the Apollo 9 mission, including Command Module and…
Inspect NASA record
S69-19798 (February 1969) --- Composite of three artist's concepts illustrating key events, tasks and activities on the tenth day of the Apollo 9 mission, including Command Module and Service Modules separation, re-entry, and Atlantic splashdown. The Apollo 9 mission will evaluate spacecraft lunar module systems performance during manned Earth-orbital flight.
- Record ID
- S69-19798
- NASA center
- JSC
- Date
- 1969-02-20
- Keywords
- LAUNCHING, SEQUENCING
JSC · 2026-04-06 · jsc2026e021362
Artemis II crew lunar observations team member, David Charney -- jsc2026e021362
Artemis II crew lunar observations team member, David Charney, monitors the mission from the Science Evaluation Room (SER). Built specifically for Artemis missions with these science priorities in…
Inspect NASA record
Artemis II crew lunar observations team member, David Charney, monitors the mission from the Science Evaluation Room (SER). Built specifically for Artemis missions with these science priorities in mind, the SER is equipped to support rapid data interpretation, collaborative analysis, real-time decision making, and seamless coordination between the science and operations teams. Credits: NASA/Luna Posadas Nava
- Record ID
- jsc2026e021362
- NASA center
- JSC
- Date
- 2026-04-06
- Credit
- Luna Posadas Nava - NASA - JSC
- Keywords
- Artemis, Artemis II, Lunar science, crew lunar observations, lunar geography, Science Evaluation Room, Moon
MSFC · 1968-01-01 · 6862616
Saturn Apollo Program
AS-204, the fourth Saturn IB launch vehicle, developed by the Marshall Space Flight Center (MSFC), awaits its January 22, 1968 liftoff from Cape Canaveral, Florida for the unmarned…
Inspect NASA record
AS-204, the fourth Saturn IB launch vehicle, developed by the Marshall Space Flight Center (MSFC), awaits its January 22, 1968 liftoff from Cape Canaveral, Florida for the unmarned Apollo 5 mission. Primary mission objectives included the verification of the Apollo Lunar Module's (LM) ascent and descent propulsion systems and an evaluation of the S-IVB stage instrument unit performance. In all, nine Saturn IB flights were made, ending with the Apollo-Soyuz Test Project in July 1975.
- Record ID
- 6862616
- NASA center
- MSFC
- Date
- 1968-01-01
- Keywords
- Saturn IB, AS-204, S-IVB, Apollo 5, Lunar Module
KSC · 2023-08-08 · KSC-20230808-PH-KLS02_0037
KSC Orion Media Day - Artemis II Crew
Artemis II mission commander Reid Wiseman poses inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Aug. 8, 2023. The Artemis…
Inspect NASA record
Artemis II mission commander Reid Wiseman poses inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Aug. 8, 2023. The Artemis II Orion crew module is undergoing acoustic testing ahead of integration with the European Service Module. Artemis II is the first crewed mission on NASA’s path to establishing a long-term lunar presence for science and exploration under Artemis.
- Record ID
- KSC-20230808-PH-KLS02_0037
- NASA center
- KSC
- Date
- 2023-08-08
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis, Artemis II, Artemis III, Artemis IV, CM, ESM, European service module, KSC, Kennedy Space Center, Moon, Moon to Mars, O&C
HQ · 2023-06-13 · NHQ202306130017
Meeting with Western Cape Government’s Alan Winde
NASA Associate Administrator for the Space Operations Mission Directorate, Ken Bowersox, and NASA Deputy Associate Administrator for Space Communications and Navigation, Badri Younes, meet with the Premier of…
Inspect NASA record
NASA Associate Administrator for the Space Operations Mission Directorate, Ken Bowersox, and NASA Deputy Associate Administrator for Space Communications and Navigation, Badri Younes, meet with the Premier of the Western Cape Government, Alan Winde, and a delegation from South Africa, to discuss the path forward for development of an antenna for the Lunar Exploration Ground Sites (LEGS) mission in Matjiesfontein, South Africa, and other opportunities, Tuesday, June 13, 2023, at the Mary W. Jackson NASA Headquarters building in Washington. Photo Credit: (NASA/Aubrey Gemignani)
- Record ID
- NHQ202306130017
- NASA center
- HQ
- Date
- 2023-06-13
- Credit
- NASA/Aubrey Gemignani
- Keywords
- Alan Winde, Badri Younes, Barbara Adde, Bertram Ariefdien, Bill Marinelli, DC, Greg Mann, Harry Malila, Ken Bowersox, Lunar Exploration Ground Sites (LEGS), Makaela Mendrala, Mary W. Jackson NASA Headquarters
KSC · 2019-05-23 · KSC-20190523-PH_KLS01_0049
Apollo 11 Media Day
NASA Administrator Jim Bridenstine, at the podium, speaks to members of the news media at the NASA News Center on May 23, 2019. Behind him is Kennedy Space…
Inspect NASA record
NASA Administrator Jim Bridenstine, at the podium, speaks to members of the news media at the NASA News Center on May 23, 2019. Behind him is Kennedy Space Center Director Bob Cabana. News media were at the center for an Apollo 11 Media Day. They toured several facilities, including the Vehicle Assembly and Launch Complex 39B for a look back at the Apollo missions and a look ahead to NASA’s new Moon 2024 initiative, the Artemis 1 mission and the Gateway lunar outpost.
- Record ID
- KSC-20190523-PH_KLS01_0049
- NASA center
- KSC
- Date
- 2019-05-23
- Credit
- NASA/Kim Shiflett
- Keywords
- KSC Events, Apollo 11 Media Day, NASA Administrator, Jim Bridenstine, Kennedy Space Center, Moon 2024, NASA News Center, Launch Complex 39 area, Bob Cabana
JSC · 1969-02-20 · S69-19795
ART CONCEPTS - APOLLO IX
S69-19795 (February 1969) --- Composite of four artist's concepts illustrating key events, tasks and activities on the fourth day of the Apollo 9 mission, including use of camera,…
Inspect NASA record
S69-19795 (February 1969) --- Composite of four artist's concepts illustrating key events, tasks and activities on the fourth day of the Apollo 9 mission, including use of camera, day-night extravehicular activity, use of golden slippers, and television over Texas and Florida. The Apollo 9 mission will evaluate spacecraft lunar module systems performance during manned Earth-orbital flight.
- Record ID
- S69-19795
- NASA center
- JSC
- Date
- 1969-02-20
- Keywords
- LAUNCHING, SEQUENCING
KSC · 2025-05-03 · KSC-20250503-PH-KLS01_0094
Artemis II Orion DD250 leaving the O&C
NASA’s KAMAG transporter carries the agency’s Artemis II Orion spacecraft from the Neil A. Armstrong Operations and Checkout Building to the Multi-Payload Processing Facility at Kennedy Space Center…
Inspect NASA record
NASA’s KAMAG transporter carries the agency’s Artemis II Orion spacecraft from the Neil A. Armstrong Operations and Checkout Building to the Multi-Payload Processing Facility at Kennedy Space Center in Florida on Saturday, May 3, 2025. The Orion spacecraft will undergo fueling and processing operations at the Multi-Function Facility. The Artemis II test flight is the first crewed flight under NASA’s Artemis campaign and is another step toward missions on the lunar surface and helping the agency prepare for future human missions to Mars.
- Record ID
- KSC-20250503-PH-KLS01_0094
- NASA center
- KSC
- Date
- 2025-05-03
- Credit
- NASA/Kim Shiflett
- Keywords
- John. F. Kennedy Space Center, Kennedy, Kennedy Space Center, KSC, Spaceport, Cape Canaveral, NASA, rocket ranch, Florida, multi-user spaceport, premier spaceport, space coast
HQ · 2019-04-08 · NHQ201904080008
Space Symposium - JAXA Bi-lateral Meeting
Japan Aerospace Exploration Agency (JAXA) President, Hiroshi Yamakawa, third from right, speaks about opportunities to work with NASA in human and robotic exploration at the lunar surface and…
Inspect NASA record
Japan Aerospace Exploration Agency (JAXA) President, Hiroshi Yamakawa, third from right, speaks about opportunities to work with NASA in human and robotic exploration at the lunar surface and around the Moon, at the Space Symposium, Monday, April 8, 2019 in Colorado Springs, Colorado. They also discussed the two agencies’ asteroid sample return missions, OSIRIS-REx AND Hayabusa-2, and how they are looking forward to sharing the data and results from those missions. Photo Credit: (NASA/Aubrey Gemignani)
- Record ID
- NHQ201904080008
- NASA center
- HQ
- Date
- 2019-04-08
- Credit
- NASA/Aubrey Gemignani
- Keywords
- Broadmoor Hotel, Colorado, Colorado Springs, Hiroshi Yamakawa, Japan Aerospace Exploration Agency (JAXA), Space Symposium
KSC · 2023-08-08 · KSC-20230808-PH-KLS02_0033
KSC Orion Media Day - Artemis II Crew
Artemis II mission specialist Jeremy Hansen poses inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Aug. 8, 2023. The Artemis…
Inspect NASA record
Artemis II mission specialist Jeremy Hansen poses inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Aug. 8, 2023. The Artemis II Orion crew module is undergoing acoustic testing ahead of integration with the European Service Module. Artemis II is the first crewed mission on NASA’s path to establishing a long-term lunar presence for science and exploration under Artemis.
- Record ID
- KSC-20230808-PH-KLS02_0033
- NASA center
- KSC
- Date
- 2023-08-08
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis, Artemis II, Artemis III, Artemis IV, CM, ESM, European service module, KSC, Kennedy Space Center, Moon, Moon to Mars, O&C
KSC · 2025-03-22 · KSC-20250323-PH-FMX01_0178
Core Stage Lift to Vertical for Move to High Bay 3
Teams with NASA’s Exploration Ground Systems and primary contractor Amentum, integrate the SLS (Space Launch System) Moon rocket with the solid rocket boosters onto mobile launcher 1 inside…
Inspect NASA record
Teams with NASA’s Exploration Ground Systems and primary contractor Amentum, integrate the SLS (Space Launch System) Moon rocket with the solid rocket boosters onto mobile launcher 1 inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center on Sunday, March 23, 2025. Artemis II is the first crewed test flight under NASA’s Artemis campaign and is another step toward missions on the lunar surface and helping the agency prepare for future human missions to Mars.
- Record ID
- KSC-20250323-PH-FMX01_0178
- NASA center
- KSC
- Date
- 2025-03-22
- Credit
- NASA/Frank Michaux
- Keywords
- John. F. Kennedy Space Center, Kennedy, Kennedy Space Center, KSC, Spaceport, Cape Canaveral, NASA, rocket ranch, Florida, multi-user spaceport, premier spaceport, space coast
KSC · 2023-08-08 · KSC-20230808-PH-KLS02_0023
KSC Orion Media Day - Artemis II Crew
Artemis II mission commander Reid Wiseman smiles inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Aug. 8, 2023. The Artemis…
Inspect NASA record
Artemis II mission commander Reid Wiseman smiles inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Aug. 8, 2023. The Artemis II Orion crew module is undergoing acoustic testing ahead of integration with the European Service Module. Artemis II is the first crewed mission on NASA’s path to establishing a long-term lunar presence for science and exploration under Artemis.
- Record ID
- KSC-20230808-PH-KLS02_0023
- NASA center
- KSC
- Date
- 2023-08-08
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis, Artemis II, Artemis III, Artemis IV, CM, ESM, European service module, KSC, Kennedy Space Center, Moon, Moon to Mars, O&C