Update Site (from NASA)
Explore NASA’s Image and Video Library.
Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.
Sign in to suggest a Marvel.
Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.
NASA image records
HQ · 2022-01-08 · NHQ202201080031
James Webb Space Telescope Second Primary Mirror Deployment
NASA James Webb Space Telescope Commissioning Manager John Durning monitors the progress of the Webb observatory as it’s second primary mirror wing is prepared to rotate into position,…
Inspect NASA record
NASA James Webb Space Telescope Commissioning Manager John Durning monitors the progress of the Webb observatory as it’s second primary mirror wing is prepared to rotate into position, Saturday, Jan. 8, 2022, from NASA’s James Webb Space Telescope Mission Operations Center at the Space Telescope Science Institute in Baltimore. Webb, an infrared telescope with a 21.3-foot (6.5-meter) primary mirror, was folded up for launch and underwent an unprecedented deployment process to unfold in space. As NASA's next flagship observatory, Webb will study every phase of cosmic history—from within our solar system to the most distant observable galaxies in the early universe. Photo Credit: (NASA/Bill Ingalls)
- Record ID
- NHQ202201080031
- NASA center
- HQ
- Date
- 2022-01-08
- Credit
- NASA/Bill Ingalls
- Keywords
- Baltimore, Canadian Space Agency (CSA), ESA (European Space Agency), James Webb Space Telescope (JWST), John Durning, Maryland, NASA, Northrop Grumman, Space Telescope Science Institute (STScI)
HQ · 2022-01-08 · NHQ202201080029
James Webb Space Telescope Second Primary Mirror Deployment
NASA James Webb Space Telescope Ground Engineer Evan Adams monitors the progress of the Webb observatory as it’s second primary mirror wing is prepared to rotate into position,…
Inspect NASA record
NASA James Webb Space Telescope Ground Engineer Evan Adams monitors the progress of the Webb observatory as it’s second primary mirror wing is prepared to rotate into position, Saturday, Jan. 8, 2022, from NASA’s James Webb Space Telescope Mission Operations Center at the Space Telescope Science Institute in Baltimore. Webb, an infrared telescope with a 21.3-foot (6.5-meter) primary mirror, was folded up for launch and underwent an unprecedented deployment process to unfold in space. As NASA's next flagship observatory, Webb will study every phase of cosmic history—from within our solar system to the most distant observable galaxies in the early universe. Photo Credit: (NASA/Bill Ingalls)
- Record ID
- NHQ202201080029
- NASA center
- HQ
- Date
- 2022-01-08
- Credit
- NASA/Bill Ingalls
- Keywords
- Baltimore, Canadian Space Agency (CSA), ESA (European Space Agency), Evan Adams, James Webb Space Telescope (JWST), Maryland, NASA, Northrop Grumman, Space Telescope Science Institute (STScI)
HQ · 2022-01-08 · NHQ202201080010
James Webb Space Telescope Second Primary Mirror Deployment
NASA James Webb Space Telescope Ground Systems Engineer Carl Reis at NASA’s James Webb Space Telescope Mission Operations Center at the Space Telescope Science Institute in Baltimore monitors…
Inspect NASA record
NASA James Webb Space Telescope Ground Systems Engineer Carl Reis at NASA’s James Webb Space Telescope Mission Operations Center at the Space Telescope Science Institute in Baltimore monitors the progress as the observatory’s second primary mirror wing rotates into position, Saturday, Jan. 8, 2022. Webb, an infrared telescope with a 21.3-foot (6.5-meter) primary mirror, was folded up for launch and underwent an unprecedented deployment process to unfold in space. As NASA's next flagship observatory, Webb will study every phase of cosmic history—from within our solar system to the most distant observable galaxies in the early universe. Photo Credit: (NASA/Bill Ingalls)
- Record ID
- NHQ202201080010
- NASA center
- HQ
- Date
- 2022-01-08
- Credit
- NASA/Bill Ingalls
- Keywords
- Baltimore, Canadian Space Agency (CSA), Carl Reis, ESA (European Space Agency), James Webb Space Telescope (JWST), Maryland, NASA, Northrop Grumman, Space Telescope Science Institute (STScI)
HQ · 2022-01-08 · NHQ202201080028
James Webb Space Telescope Second Primary Mirror Deployment
NASA James Webb Space Telescope Timeline Coordinator Matt Wasiak monitors the progress of the Webb observatory as it’s second primary mirror wing is prepared to rotate into position,…
Inspect NASA record
NASA James Webb Space Telescope Timeline Coordinator Matt Wasiak monitors the progress of the Webb observatory as it’s second primary mirror wing is prepared to rotate into position, Saturday, Jan. 8, 2022, from NASA’s James Webb Space Telescope Mission Operations Center at the Space Telescope Science Institute in Baltimore. Webb, an infrared telescope with a 21.3-foot (6.5-meter) primary mirror, was folded up for launch and underwent an unprecedented deployment process to unfold in space. As NASA's next flagship observatory, Webb will study every phase of cosmic history—from within our solar system to the most distant observable galaxies in the early universe. Photo Credit: (NASA/Bill Ingalls)
- Record ID
- NHQ202201080028
- NASA center
- HQ
- Date
- 2022-01-08
- Credit
- NASA/Bill Ingalls
- Keywords
- Baltimore, Canadian Space Agency (CSA), ESA (European Space Agency), James Webb Space Telescope (JWST), Maryland, Matt Wasiak, NASA, Northrop Grumman, Space Telescope Science Institute (STScI)
KSC · 2026-08-29 · KSC-20260829-PH-KLS01_0043
Roman Space Telescope Science Briefing
From left, Vanessa Bailey, Roman Coronagraph Instrument scientist, NASA’s Jet Propulsion Laboratory in Southern California; Kristen McQuinn, Roman Science Operations Center lead, Space Telescope Science Institute; and Lee…
Inspect NASA record
From left, Vanessa Bailey, Roman Coronagraph Instrument scientist, NASA’s Jet Propulsion Laboratory in Southern California; Kristen McQuinn, Roman Science Operations Center lead, Space Telescope Science Institute; and Lee Armus, Roman Science Support Center lead, Caltech/IPAC, participate in a science briefing for NASA’s Nancy Grace Roman Space Telescope inside the NASA News Center’s John Holliman Auditorium at Kennedy Space Center in Florida, on Saturday, Aug. 29, 2026. Roman will investigate dark energy and dark matter, conduct a statistical census of planetary systems, and enable a broad range of additional astrophysics research. Liftoff from Launch Complex 39A at Kennedy is targeted for no earlier than Sunday, Aug. 30, 2026.
- Record ID
- KSC-20260829-PH-KLS01_0043
- NASA center
- KSC
- Date
- 2026-08-29
- Credit
- NASA/Kim Shiflett
- Keywords
- John. F. Kennedy Space Center, Kennedy, Kennedy Space Center, KSC, Spaceport, Cape Canaveral, NASA, rocket ranch, Florida, multi-user spaceport, premier spaceport, space coast
GSFC · 2017-12-08 · GSFC_20171208_Archive_e000494
James Webb Space Telescope Mirror Halfway Complete
Inside NASA's Goddard Space Flight Center's massive clean room in Greenbelt, Maryland, the ninth flight mirror was installed onto the telescope structure with a robotic arm. This marks…
Inspect NASA record
Inside NASA's Goddard Space Flight Center's massive clean room in Greenbelt, Maryland, the ninth flight mirror was installed onto the telescope structure with a robotic arm. This marks the halfway completion point for the James Webb Space Telescope's segmented primary mirror. Engineers worked tirelessly to install the ninth primary flight mirror onto the telescope structure. Credit: NASA's Goddard Space Flight Center/Chris Gunn Read more: go.nasa.gov/1kqK6fW
- Record ID
- GSFC_20171208_Archive_e000494
- NASA center
- GSFC
- Date
- 2017-12-08
- Keywords
- James Webb Space Telescope Mirror Halfway Complete, nasa, jwst, jameswebbspacetelescope, nasagoddard
GSFC · 2017-12-08 · GSFC_20171208_Archive_e001917
The Webb Telescope's Actuators: Curving Mirrors in Space
NASA image release December 9, 2010 Caption: The James Webb Space Telescope's Engineering Design Unit (EDU) primary mirror segment, coated with gold by Quantum Coating Incorporated. The actuator…
Inspect NASA record
NASA image release December 9, 2010 Caption: The James Webb Space Telescope's Engineering Design Unit (EDU) primary mirror segment, coated with gold by Quantum Coating Incorporated. The actuator is located behind the mirror. Credit: Photo by Drew Noel NASA's James Webb Space Telescope is a wonder of modern engineering. As the planned successor to the Hubble Space telescope, even the smallest of parts on this giant observatory will play a critical role in its performance. A new video takes viewers behind the Webb's mirrors to investigate "actuators," one component that will help Webb focus on some of the earliest objects in the universe. The video called "Got Your Back" is part of an on-going video series about the Webb telescope called "Behind the Webb." It was produced at the Space Telescope Science Institute (STScI) in Baltimore, Md. and takes viewers behind the scenes with scientists and engineers who are creating the Webb telescope's components. During the 3 minute and 12 second video, STScI host Mary Estacion interviewed people involved in the project at Ball Aerospace in Boulder, Colo. and showed the actuators in action. The Webb telescope will study every phase in the history of our universe, ranging from the first luminous glows after the big bang, to the formation of solar systems capable of supporting life on planets like Earth, to the evolution of our own solar system. Measuring the light this distant light requires a primary mirror 6.5 meters (21 feet 4 inches) across – six times larger than the Hubble Space telescope’s mirror! Launching a mirror this large into space isn’t feasible. Instead, Webb engineers and scientists innovated a unique solution – building 18 mirrors that will act in unison as one large mirror. These mirrors are packaged together into three sections that fold up - much easier to fit inside a rocket. Each mirror is made from beryllium and weighs approximately 20 kilograms (46 pounds). Once in space, getting these mirrors to focus correctly on faraway galaxies is another challenge entirely. Actuators, or tiny mechanical motors, provide the answer to achieving a single perfect focus. The primary and secondary mirror segments are both moved by six actuators that are attached to the back of the mirrors. The primary segment has an additional actuator at the center of the mirror that adjusts its curvature. The third mirror segment remains stationary. Lee Feinberg, Webb Optical Telescope Element Manager at NASA's Goddard Space Flight Center in Greenbelt, Md. explained "Aligning the primary mirror segments as though they are a single large mirror means each mirror is aligned to 1/10,000th the thickness of a human hair. This alignment has to be done at 50 degrees above absolute zero! What's even more amazing is that the engineers and scientists working on the Webb telescope literally had to invent how to do this." With the actuators in place, Brad Shogrin, Webb Telescope Manager at Ball Aerospace, Boulder, Colo, details the next step: attaching the hexapod (meaning six-footed) assembly and radius of curvature subsystem (ROC). "Radius of curvature" refers to the distance to the center point of the curvature of the mirror. Feinberg added "To understand the concept in a more basic sense, if you change that radius of curvature, you change the mirror's focus." The "Behind the Webb" video series is available in HQ, large and small Quicktime formats, HD, Large and Small WMV formats, and HD, Large and Small Xvid formats. To see the actuators being attached to the back of a telescope mirror in this new "Behind the Webb" video, visit: webbtelescope.org/webb_telescope/behind_the_webb/7 For more information about Webb's mirrors, visit: www.jwst.nasa.gov/mirrors.html For more information on the James Webb Space Telescope, visit: jwst.nasa.gov Rob Gutro NASA's Goddard Space Flight Center, Greenbelt, Md. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Join us on Facebook
- Record ID
- GSFC_20171208_Archive_e001917
- NASA center
- GSFC
- Date
- 2017-12-08
- Keywords
- The Webb Telescope's Actuators: Curving Mirrors in Space, nasa, jwst, goddardspaceflightcenterjameswebbspacetelescope
HQ · 2022-01-08 · NHQ202201080009
James Webb Space Telescope Second Primary Mirror Deployment
NASA James Webb Space Telescope Project Manager Bill Ochs, left, and NASA James Webb Space Telescope Mission Operations Manager Carl Starr, monitor the progress of the Webb observatory…
Inspect NASA record
NASA James Webb Space Telescope Project Manager Bill Ochs, left, and NASA James Webb Space Telescope Mission Operations Manager Carl Starr, monitor the progress of the Webb observatory as it’s second primary mirror wing is prepared to rotate into position, Saturday, Jan. 8, 2022, from NASA’s James Webb Space Telescope Mission Operations Center at the Space Telescope Science Institute in Baltimore. Webb, an infrared telescope with a 21.3-foot (6.5-meter) primary mirror, was folded up for launch and underwent an unprecedented deployment process to unfold in space. As NASA's next flagship observatory, Webb will study every phase of cosmic history—from within our solar system to the most distant observable galaxies in the early universe. Photo Credit: (NASA/Bill Ingalls)
- Record ID
- NHQ202201080009
- NASA center
- HQ
- Date
- 2022-01-08
- Credit
- NASA/Bill Ingalls
- Keywords
- Baltimore, Bill Ochs, Canadian Space Agency (CSA), Carl Starr, ESA (European Space Agency), James Webb Space Telescope (JWST), Maryland, NASA, Northrop Grumman, Space Telescope Science Institute (STScI)
HQ · 2022-01-08 · NHQ202201080007
James Webb Space Telescope Second Primary Mirror Deployment
NASA James Webb Space Telescope Mission Operations Manager Carl Starr, left, shows his Webb shirt to NASA James Webb Space Telescope Commissioning Manager John Durning, right, as they…
Inspect NASA record
NASA James Webb Space Telescope Mission Operations Manager Carl Starr, left, shows his Webb shirt to NASA James Webb Space Telescope Commissioning Manager John Durning, right, as they prepare to monitor the progress of the observatory’s second primary mirror wing rotating into position, Saturday, Jan. 8, 2022, at NASA’s James Webb Space Telescope Mission Operations Center at the Space Telescope Science Institute in Baltimore. Webb, an infrared telescope with a 21.3-foot (6.5-meter) primary mirror, was folded up for launch and underwent an unprecedented deployment process to unfold in space. As NASA's next flagship observatory, Webb will study every phase of cosmic history—from within our solar system to the most distant observable galaxies in the early universe. Photo Credit: (NASA/Bill Ingalls)
- Record ID
- NHQ202201080007
- NASA center
- HQ
- Date
- 2022-01-08
- Credit
- NASA/Bill Ingalls
- Keywords
- Baltimore, Canadian Space Agency (CSA), ESA (European Space Agency), James Webb Space Telescope (JWST), Maryland, NASA, Northrop Grumman, Space Telescope Science Institute (STScI)
GSFC · 2017-12-08 · GSFC_20171208_Archive_e000186
James Webb Space Telescope Town Hall
Goddard employees were invited to a town hall with NASA Administrator Charlie Bolden, Associate Administrator for the NASA Science Mission Directorate Thomas Zurbuchen and Goddard Center Director Chris…
Inspect NASA record
Goddard employees were invited to a town hall with NASA Administrator Charlie Bolden, Associate Administrator for the NASA Science Mission Directorate Thomas Zurbuchen and Goddard Center Director Chris Scolese, Nov. 2, at 11:30 a.m. in the Hinners Auditorium in Building 8. Bolden thanked the James Webb Space Telescope team at Goddard as well as our international and corporate partners for their exceptional support. Credit: NASA/Goddard
- Record ID
- GSFC_20171208_Archive_e000186
- NASA center
- GSFC
- Date
- 2017-12-08
- Keywords
- James Webb Space Telescope Town Hall, jameswebbspacetelescopemirrorreveal
GSFC · 2017-12-08 · GSFC_20171208_Archive_e000177
James Webb Space Telescope Town Hall
Goddard employees were invited to a town hall with NASA Administrator Charlie Bolden, Associate Administrator for the NASA Science Mission Directorate Thomas Zurbuchen and Goddard Center Director Chris…
Inspect NASA record
Goddard employees were invited to a town hall with NASA Administrator Charlie Bolden, Associate Administrator for the NASA Science Mission Directorate Thomas Zurbuchen and Goddard Center Director Chris Scolese, Nov. 2, at 11:30 a.m. in the Hinners Auditorium in Building 8. Bolden thanked the James Webb Space Telescope team at Goddard as well as our international and corporate partners for their exceptional support. Credit: NASA/Goddard
- Record ID
- GSFC_20171208_Archive_e000177
- NASA center
- GSFC
- Date
- 2017-12-08
- Keywords
- James Webb Space Telescope Town Hall, jwstgoldenmirrorsartistevent
GSFC · 2017-12-08 · GSFC_20171208_Archive_e000182
James Webb Space Telescope Town Hall
Goddard employees were invited to a town hall with NASA Administrator Charlie Bolden, Associate Administrator for the NASA Science Mission Directorate Thomas Zurbuchen and Goddard Center Director Chris…
Inspect NASA record
Goddard employees were invited to a town hall with NASA Administrator Charlie Bolden, Associate Administrator for the NASA Science Mission Directorate Thomas Zurbuchen and Goddard Center Director Chris Scolese, Nov. 2, at 11:30 a.m. in the Hinners Auditorium in Building 8. Bolden thanked the James Webb Space Telescope team at Goddard as well as our international and corporate partners for their exceptional support. Credit: NASA/Goddard
- Record ID
- GSFC_20171208_Archive_e000182
- NASA center
- GSFC
- Date
- 2017-12-08
- Keywords
- James Webb Space Telescope Town Hall, jameswebbspacetelescopejwsttownhalldrericsmith