Interstellar Minds

‹ Interstellar Minds

Update Site (from NASA)

Explore NASA’s Image and Video Library.

Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.

Sign in to suggest a Marvel.

Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.

NASA image records

3521bfb5-9f9a-43ec-92aa-cb5486d43a88

JSC · 2022-09-29 · 3521bfb5-9f9a-43ec-92aa-cb5486d43a88

3521bfb5-9f9a-43ec-92aa-cb5486d43a88

Northrop Grumman and subcontractor Thales Alenia Space complete fabrication work on the Habitation and Logistics Outpost (HALO) module, one of two of the Gateway Space Station's habitation elements…

Inspect NASA record

Northrop Grumman and subcontractor Thales Alenia Space complete fabrication work on the Habitation and Logistics Outpost (HALO) module, one of two of the Gateway Space Station's habitation elements where astronauts will live and work in lunar orbit during deep space Artemis missions.

Record ID
3521bfb5-9f9a-43ec-92aa-cb5486d43a88
NASA center
JSC
Date
2022-09-29
Credit
Northrop Grumman, Thales Alenia Space
Keywords
Gateway, HALO, Habitation and Logistics Outpost, space station, Artemis, Moon, Northrop Grumman, Moon
Flight Day 17: Orion Points to Earth

JSC · 2022-12-02 · art001e001936

Flight Day 17: Orion Points to Earth

art001e001936 (Dec. 2, 2022) A camera mounted on one of Orion’s four solar arrays captured this image of the Earth on flight day 17 of the 25.5-day Artemis…

Inspect NASA record

art001e001936 (Dec. 2, 2022) A camera mounted on one of Orion’s four solar arrays captured this image of the Earth on flight day 17 of the 25.5-day Artemis I mission from a distance of more than 222,000 miles. Orion has exited the distant lunar orbit and is heading for a Dec. 11 splashdown in the Pacific Ocean.

Record ID
art001e001936
NASA center
JSC
Date
2022-12-02
Keywords
Artemis I resource reel, Artemis, Artemis I, Orion, Earth
Jon Olansen Highlights Gateway's Role at EAA AirVenture 2024

JSC · 2024-07-26 · jsc2024e055771

Jon Olansen Highlights Gateway's Role at EAA AirVenture 2024

jsc2024e055771 (July 26, 2024) -- Dr. Jon Olansen engages the audience at the Theater in the Woods during "The Historic Artemis II Mission" forum held at EAA AirVenture…

Inspect NASA record

jsc2024e055771 (July 26, 2024) -- Dr. Jon Olansen engages the audience at the Theater in the Woods during "The Historic Artemis II Mission" forum held at EAA AirVenture Oshkosh 2024. As the Gateway Program Manager, Olansen highlights Gateway's pivotal role in supporting the Artemis era of lunar exploration. Photo Credit: NASA/Andrew Carlsen

Record ID
jsc2024e055771
NASA center
JSC
Date
2024-07-26
Credit
Andrew Carlsen
Keywords
Artemis, Gateway, Oshkosh, EAA AirVenture
ER-2 Crew Installs air-LUSI Moongazing Instrument

AFRC · 2025-03-04 · AFRC2025-0048-090

ER-2 Crew Installs air-LUSI Moongazing Instrument

Dr. John Woodward, of the National Institute of Standards and Technology and co-investigator on the airborne Lunar Spectral Irradiance (air-LUSI) mission, prepares the instrument for upload onto the…

Inspect NASA record

Dr. John Woodward, of the National Institute of Standards and Technology and co-investigator on the airborne Lunar Spectral Irradiance (air-LUSI) mission, prepares the instrument for upload onto the ER-2 aircraft in March 2025 at NASA’s Armstrong Flight Research Center in Edwards, California.

Record ID
AFRC2025-0048-090
NASA center
AFRC
Date
2025-03-04
Credit
NASA/Genaro Vavuris
Keywords
AFRC, NASA Armstrong Flight Research Center, NASA’s ER-2, Airborne Science program, United States Geological Survey, USGS, Earth Science, science mission, science research, technology, air-LUSI
Portrait - Apollo 9 - Prime Crew

JSC · 1966-03-01 · S66-30237

Portrait - Apollo 9 - Prime Crew

S66-30237 (March 1966) --- These three astronauts have been named as the prime crew of the Apollo 9 mission. They are (left to right) David R. Scott, command…

Inspect NASA record

S66-30237 (March 1966) --- These three astronauts have been named as the prime crew of the Apollo 9 mission. They are (left to right) David R. Scott, command module pilot; James A. McDivitt, commander; and Russell L. Schweickart, lunar module pilot.

Record ID
S66-30237
NASA center
JSC
Date
1966-03-01
Keywords
APOLLO 9 FLIGHT, APOLLO PROJECT, ASTRONAUTS, PORTRAIT
KEY CONTROL PEOPLE IN MMC DURING LUNAR TOUCHDOWN 7/20/69

JSC · 1969-07-20 · S69-39601

KEY CONTROL PEOPLE IN MMC DURING LUNAR TOUCHDOWN 7/20/69

S69-39601 (20 July 1969) --- Spacecraft communicators are pictured as they keep in contact with the Apollo 11 astronauts during their lunar landing mission on July 20, 1969.…

Inspect NASA record

S69-39601 (20 July 1969) --- Spacecraft communicators are pictured as they keep in contact with the Apollo 11 astronauts during their lunar landing mission on July 20, 1969. From left to right are astronauts Charles M. Duke Jr., James A. Lovell Jr. and Fred W. Haise Jr.

Record ID
S69-39601
NASA center
JSC
Date
1969-07-20
NASA Attends Blue Angels Airshow

SSC · 2024-11-01 · SSC-20241101-s01145

NASA Attends Blue Angels Airshow

NASA Stennis representatives inspire the Artemis Generation at the NAS Pensacola Blue Angels Homecoming Air Show Nov. 1-2, following STEM engagement activities on Oct. 31. NASA’s exhibit at…

Inspect NASA record

NASA Stennis representatives inspire the Artemis Generation at the NAS Pensacola Blue Angels Homecoming Air Show Nov. 1-2, following STEM engagement activities on Oct. 31. NASA’s exhibit at the air show honors the 55th anniversary of the Apollo 11 lunar landing and showcases the agency’s mission to inspire the world through discovery.

Record ID
SSC-20241101-s01145
NASA center
SSC
Date
2024-11-01
Credit
NASA Stennis
View of Mission Control Center during the Apollo 13 liftoff

JSC · 1970-04-11 · S70-34628

View of Mission Control Center during the Apollo 13 liftoff

S70-34628 (11 April 1970) --- Astronaut Thomas K. (Ken) Mattingly II, who was scheduled as a prime crew member for the Apollo 13 lunar landing mission but was…

Inspect NASA record

S70-34628 (11 April 1970) --- Astronaut Thomas K. (Ken) Mattingly II, who was scheduled as a prime crew member for the Apollo 13 lunar landing mission but was replaced in the final hours when it was discovered he had been exposed to measles, watches the liftoff phase of the mission. He is seated at a console in the Mission Control Center’s (MCC) Mission Operations Control Room (MOCR). Scientist-astronaut Joseph P. Kerwin, a spacecraft communicator for the mission, looks on at right.

Record ID
S70-34628
NASA center
JSC
Date
1970-04-11
Artemis III Engine Section Moves to VAB

MAF · 2022-11-07 · MAF_20221107_CS3_ES2VAB08

Artemis III Engine Section Moves to VAB

Technicians at NASA’s Michoud Assembly Facility move the engine section of NASA’s Space Launch System rocket for Artemis III to the VAB on November 7, 2022. This hardware…

Inspect NASA record

Technicians at NASA’s Michoud Assembly Facility move the engine section of NASA’s Space Launch System rocket for Artemis III to the VAB on November 7, 2022. This hardware makes up the lowest portion of the 212-foot-tall core stage; and when complete, it will house the four RS-25 engines as well as vital systems for mounting, controlling, and delivering fuel from the propellant tanks to the rocket’s engines. Together with its four RS-25 engines and its twin solid rocket boosters, it will produce 8.8 million pounds of thrust to send NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit to the Moon and, ultimately, Mars. Offering more payload mass, volume capability, and energy to speed missions through space, the SLS rocket, along with NASA’s Gateway in lunar orbit, the Humane Landing System, and Orion spacecraft, is part of NASA’s backbone for deep space exploration and the Artemis lunar program. No other rocket is capable of carrying astronauts in Orion around the Moon in a single mission. Image credit: NASA/Michael DeMocker

Record ID
MAF_20221107_CS3_ES2VAB08
NASA center
MAF
Date
2022-11-07
Credit
Michael DeMocker
Keywords
SLS, MAF, Michoud Assembly Facility, MSCF, Marshall, Artemis III, Exploration, Louisiana, Mars, Moon, NASA, New Orleans
Artemis III Engine Section Moves to VAB

MAF · 2022-11-07 · MAF_20221107_CS3_ES2VAB04

Artemis III Engine Section Moves to VAB

Technicians at NASA’s Michoud Assembly Facility move the engine section of NASA’s Space Launch System rocket for Artemis III to the VAB on November 7, 2022. This hardware…

Inspect NASA record

Technicians at NASA’s Michoud Assembly Facility move the engine section of NASA’s Space Launch System rocket for Artemis III to the VAB on November 7, 2022. This hardware makes up the lowest portion of the 212-foot-tall core stage; and when complete, it will house the four RS-25 engines as well as vital systems for mounting, controlling, and delivering fuel from the propellant tanks to the rocket’s engines. Together with its four RS-25 engines and its twin solid rocket boosters, it will produce 8.8 million pounds of thrust to send NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit to the Moon and, ultimately, Mars. Offering more payload mass, volume capability, and energy to speed missions through space, the SLS rocket, along with NASA’s Gateway in lunar orbit, the Humane Landing System, and Orion spacecraft, is part of NASA’s backbone for deep space exploration and the Artemis lunar program. No other rocket is capable of carrying astronauts in Orion around the Moon in a single mission. Image credit: NASA/Michael DeMocker

Record ID
MAF_20221107_CS3_ES2VAB04
NASA center
MAF
Date
2022-11-07
Credit
Michael DeMocker
Keywords
SLS, MAF, Michoud Assembly Facility, MSCF, Marshall, Artemis III, Exploration, Louisiana, Mars, Moon, NASA, New Orleans
Artemis III Engine Section Moves to VAB

MAF · 2022-11-07 · MAF_20221107_CS3_ES2VAB01

Artemis III Engine Section Moves to VAB

Technicians at NASA’s Michoud Assembly Facility move the engine section of NASA’s Space Launch System rocket for Artemis III to the VAB on November 7, 2022. This hardware…

Inspect NASA record

Technicians at NASA’s Michoud Assembly Facility move the engine section of NASA’s Space Launch System rocket for Artemis III to the VAB on November 7, 2022. This hardware makes up the lowest portion of the 212-foot-tall core stage; and when complete, it will house the four RS-25 engines as well as vital systems for mounting, controlling, and delivering fuel from the propellant tanks to the rocket’s engines. Together with its four RS-25 engines and its twin solid rocket boosters, it will produce 8.8 million pounds of thrust to send NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit to the Moon and, ultimately, Mars. Offering more payload mass, volume capability, and energy to speed missions through space, the SLS rocket, along with NASA’s Gateway in lunar orbit, the Humane Landing System, and Orion spacecraft, is part of NASA’s backbone for deep space exploration and the Artemis lunar program. No other rocket is capable of carrying astronauts in Orion around the Moon in a single mission. Image credit: NASA/Michael DeMocker

Record ID
MAF_20221107_CS3_ES2VAB01
NASA center
MAF
Date
2022-11-07
Credit
Michael DeMocker
Keywords
SLS, MAF, Michoud Assembly Facility, MSCF, Marshall, Artemis III, Exploration, Louisiana, Mars, Moon, NASA, New Orleans
Saturn Apollo Program

MSFC · 1975-01-01 · 9801782

Saturn Apollo Program

This montage illustrates the various configurations and missions of the three classes of the Saturn vehicles developed by the Marshall Space Flight Center. The missions for the Saturn…

Inspect NASA record

This montage illustrates the various configurations and missions of the three classes of the Saturn vehicles developed by the Marshall Space Flight Center. The missions for the Saturn I included atmospheric science investigations and the deployment of the Pegasus meteroid-detection satellite as well as launch vehicle development. The Saturn IB vehicle tested the Apollo spacecraft and launched the three marned Skylab missions as well as the Apollo Soyuz test project. The Saturn V vehicle launched the manned lunar orbital/landing missions, and the Skylab Orbital Workshop in 1973.

Record ID
9801782
NASA center
MSFC
Date
1975-01-01
Keywords
Saturn I, Saturn IB, Saturn V