Interstellar Minds

‹ Interstellar Minds

Update Site (from NASA)

Explore NASA’s Image and Video Library.

Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.

Sign in to suggest a Marvel.

Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.

NASA image records

NASA Update on Implementation of National Space Policy

HQ · 2026-03-24 · NHQ202603240076

NASA Update on Implementation of National Space Policy

Power and Propulsion Element (PPE) model is seen on display during an event where NASA is outlining how the agency is executing President Donald J. Trump’s National Space…

Inspect NASA record

Power and Propulsion Element (PPE) model is seen on display during an event where NASA is outlining how the agency is executing President Donald J. Trump’s National Space Policy and accelerating preparations for America’s return to the surface of the Moon by 2028, Tuesday, March 24, 2026, at the Mary W. Jackson NASA Headquarters building in Washington. During the event NASA leadership provided updates on mission priorities, including sending the first astronauts to the lunar surface in more than 50 years, establishing the initial elements of a permanent lunar base, getting America underway in space on nuclear propulsion, and other objectives. Photo Credit: (NASA/Bill Ingalls)

Record ID
NHQ202603240076
NASA center
HQ
Date
2026-03-24
Credit
NASA/Bill Ingalls
Keywords
DC, Mary W. Jackson NASA Headquarters, Power and Propulsion Element (PPE), Washington
Pilot Excavator Testing

KSC · 2021-07-16 · KSC-20210716-PH-KLS01_0028

Pilot Excavator Testing

A team at NASA’s Kennedy Space Center in Florida tests small- and medium-sized bucket drums July 16, 2021, in the Granular Mechanics and Regolith Operations Lab’s “big bin”…

Inspect NASA record

A team at NASA’s Kennedy Space Center in Florida tests small- and medium-sized bucket drums July 16, 2021, in the Granular Mechanics and Regolith Operations Lab’s “big bin” during prototype development for the pilot excavator, a robotic mission designed for lunar operations. The bucket drum excavated lunar regolith simulant. The Swamp Works team leveled and compacted the simulant before excavation as well as measured penetration during the excavator testing. Robotics engineers Jason Schuler and Austin Langton worked inside the bin, teaming up with software engineer Kurt Leucht, who worked just outside of it.

Record ID
KSC-20210716-PH-KLS01_0028
NASA center
KSC
Date
2021-07-16
Credit
NASA/Kim Shiflett
Keywords
ER&T, GCD, GMRO, KSC, Kennedy Space Center, NASA, RASSOR, STMD, Space Technology Mission Directorate, Swamp Works, bucket drum, excavator
Pilot Excavator Testing

KSC · 2021-07-16 · KSC-20210716-PH-KLS01_0148

Pilot Excavator Testing

A team at NASA’s Kennedy Space Center in Florida tests small- and medium-sized bucket drums July 16, 2021, in the Granular Mechanics and Regolith Operations Lab’s “big bin”…

Inspect NASA record

A team at NASA’s Kennedy Space Center in Florida tests small- and medium-sized bucket drums July 16, 2021, in the Granular Mechanics and Regolith Operations Lab’s “big bin” during prototype development for the pilot excavator, a robotic mission designed for lunar operations. The bucket drum excavated lunar regolith simulant. The Swamp Works team leveled and compacted the simulant before excavation as well as measured penetration during the excavator testing. Robotics engineers Jason Schuler and Austin Langton worked inside the bin, teaming up with software engineer Kurt Leucht, who worked just outside of it.

Record ID
KSC-20210716-PH-KLS01_0148
NASA center
KSC
Date
2021-07-16
Credit
NASA/Kim Shiflett
Keywords
ER&T, GCD, GMRO, KSC, Kennedy Space Center, NASA, RASSOR, STMD, Space Technology Mission Directorate, Swamp Works, bucket drum, excavator
Artemis I WDR Rollout

KSC · 2022-03-17 · KSC-20220317-PH-KLS03_0169

Artemis I WDR Rollout

NASA’s Moon rocket is on the move at the agency’s Kennedy Space Center in Florida, rolling out of the Vehicle Assembly Building for a 4.2-mile journey to Launch…

Inspect NASA record

NASA’s Moon rocket is on the move at the agency’s Kennedy Space Center in Florida, rolling out of the Vehicle Assembly Building for a 4.2-mile journey to Launch Complex 39B on March 17, 2022. Carried atop the crawler-transporter 2, the Space Launch System (SLS) rocket and Orion spacecraft are venturing to the pad for a wet dress rehearsal ahead of the uncrewed Artemis I launch. The first in an increasingly complex set of missions, Artemis I will test SLS and Orion as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will land the first woman and the first person of color on the lunar surface, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220317-PH-KLS03_0169
NASA center
KSC
Date
2022-03-17
Credit
NASA/Kim Shiflett
Keywords
Artemis I, Kennedy Space Center, VAB, pad 39B, rollout, wet dress rehearsal
Artemis I WDR Rollout

KSC · 2022-03-17 · KSC-20220317-PH-KLS03_0149

Artemis I WDR Rollout

NASA’s Moon rocket is on the move at the agency’s Kennedy Space Center in Florida, rolling out of the Vehicle Assembly Building for a 4.2-mile journey to Launch…

Inspect NASA record

NASA’s Moon rocket is on the move at the agency’s Kennedy Space Center in Florida, rolling out of the Vehicle Assembly Building for a 4.2-mile journey to Launch Complex 39B on March 17, 2022. Carried atop the crawler-transporter 2, the Space Launch System (SLS) rocket and Orion spacecraft are venturing to the pad for a wet dress rehearsal ahead of the uncrewed Artemis I launch. The first in an increasingly complex set of missions, Artemis I will test SLS and Orion as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will land the first woman and the first person of color on the lunar surface, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

Record ID
KSC-20220317-PH-KLS03_0149
NASA center
KSC
Date
2022-03-17
Credit
NASA/Kim Shiflett
Keywords
Artemis I, Kennedy Space Center, VAB, pad 39B, rollout, wet dress rehearsal
Artemis III Tour of IOZ

KSC · 2026-11-08 · KSC-20261108-PH-AJN01_0103

Artemis III Tour of IOZ

ESA (European Space Agency) astronaut Luca Parmitano, Artemis III pilot, smiles for a photo during a visit to look at the Artemis III Orion spacecraft inside the high…

Inspect NASA record

ESA (European Space Agency) astronaut Luca Parmitano, Artemis III pilot, smiles for a photo during a visit to look at the Artemis III Orion spacecraft inside the high bay of the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Sunday, Nov. 8, 2026. Parmitano, NASA astronauts Randy Bresnik, Andre Douglas, and Frank Rubio, will launch on the Artemis III mission to conduct critical rendezvous and docking tests with lunar lander systems in low Earth orbit, advancing the capabilities needed before astronauts return to the lunar surface on Artemis IV.

Record ID
KSC-20261108-PH-AJN01_0103
NASA center
KSC
Date
2026-11-08
Credit
NASA/Amber Jean Notvest
Keywords
Artemis, Artemis III, Artemis III astronauts, KSC, Orion
NASA Update on Implementation of National Space Policy

HQ · 2026-03-24 · NHQ202603240028

NASA Update on Implementation of National Space Policy

A chart is seen on a monitor as NASA Moon Base Program Executive Carlos Garcia-Galan speaks during an event where NASA is outlining how the agency is executing…

Inspect NASA record

A chart is seen on a monitor as NASA Moon Base Program Executive Carlos Garcia-Galan speaks during an event where NASA is outlining how the agency is executing President Donald J. Trump’s National Space Policy and accelerating preparations for America’s return to the surface of the Moon by 2028, Tuesday, March 24, 2026, at the Mary W. Jackson NASA Headquarters building in Washington. During the event NASA leadership provided updates on mission priorities, including sending the first astronauts to the lunar surface in more than 50 years, establishing the initial elements of a permanent lunar base, getting America underway in space on nuclear propulsion, and other objectives. Photo Credit: (NASA/Bill Ingalls)

Record ID
NHQ202603240028
NASA center
HQ
Date
2026-03-24
Credit
NASA/Bill Ingalls
Keywords
Carlos Garcia-Galan, DC, Mary W. Jackson NASA Headquarters, Washington
NASA Update on Implementation of National Space Policy

HQ · 2026-03-24 · NHQ202603240058

NASA Update on Implementation of National Space Policy

NASA Press Secretary Bethany Stevens moderates a press conference following an event where NASA outlined how the agency is executing President Donald J. Trump’s National Space Policy and…

Inspect NASA record

NASA Press Secretary Bethany Stevens moderates a press conference following an event where NASA outlined how the agency is executing President Donald J. Trump’s National Space Policy and accelerating preparations for America’s return to the surface of the Moon by 2028, Tuesday, March 24, 2026, at the Mary W. Jackson NASA Headquarters building in Washington. During the event NASA leadership provided updates on mission priorities, including sending the first astronauts to the lunar surface in more than 50 years, establishing the initial elements of a permanent lunar base, getting America underway in space on nuclear propulsion, and other objectives. Photo Credit: (NASA/Bill Ingalls)

Record ID
NHQ202603240058
NASA center
HQ
Date
2026-03-24
Credit
NASA/Bill Ingalls
Keywords
Bethany Stevens, DC, Mary W. Jackson NASA Headquarters, Washington
Artemis I SLS with Full Moon

KSC · 2022-06-14 · KSC-20220614-PH-JBS01_0283

Artemis I SLS with Full Moon

A full Moon is in view from Launch Complex 39B at NASA’s Kennedy Space Center in Florida on June 14, 2022. The Artemis I Space Launch System (SLS)…

Inspect NASA record

A full Moon is in view from Launch Complex 39B at NASA’s Kennedy Space Center in Florida on June 14, 2022. The Artemis I Space Launch System (SLS) and Orion spacecraft, atop the mobile launcher, are being prepared for a wet dress rehearsal to practice timelines and procedures for launch. The first in an increasingly complex series of missions, Artemis I will test SLS and Orion as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will land the first woman and first person of color on the lunar surface, paving the way for a long-term lunar presence and using the Moon as a steppingstone on the way to Mars.

Record ID
KSC-20220614-PH-JBS01_0283
NASA center
KSC
Date
2022-06-14
Credit
NASA/Ben Smegelsky
Keywords
Artemis, Artemis I, SLS, Orion, EGS, LC-39B
Lightning around the Apollo 15 stack prior to launch

JSC · 1971-07-25 · S89-41564

Lightning around the Apollo 15 stack prior to launch

S89-41564 (25 July 1971) --- Lightning streaks through the sky around the Apollo 15 stack of hardware prior to the Apollo 15 launch. The huge 363-feet tall Apollo…

Inspect NASA record

S89-41564 (25 July 1971) --- Lightning streaks through the sky around the Apollo 15 stack of hardware prior to the Apollo 15 launch. The huge 363-feet tall Apollo 15 (Spacecraft 112/Lunar Module 10/Saturn 510) space vehicle is scheduled to launch from Pad A, Launch Complex 39, at 9:34:00:79 p.m. (EDT) on July 26, 1971. The prime crewmembers for the Apollo 15 mission are astronauts David R. Scott, commander; James B. Irwin, lunar module pilot; and Alfred M. Worden, command module pilot.

Record ID
S89-41564
NASA center
JSC
Date
1971-07-25
Credit
N/A
Saturn Apollo Program

MSFC · 1967-03-01 · 9253429

Saturn Apollo Program

The Saturn V configuration is shown in inches and meters as illustrated by the Boeing Company. The Saturn V vehicle consisted of three stages: the S-IC (first) stage…

Inspect NASA record

The Saturn V configuration is shown in inches and meters as illustrated by the Boeing Company. The Saturn V vehicle consisted of three stages: the S-IC (first) stage powered by five F-1 engines, the S-II (second) stage powered by five J-2 engines, the S-IVB (third) stage powered by one J-2 engine. A top for the first three stages was designed to contain the instrument unit, the guidance system, the Apollo spacecraft, and the escape system. The Apollo spacecraft consisted of the lunar module, the service module, and the command module. The Saturn V was designed perform lunar and planetary missions and it was capable of placing 280,000 pounds into Earth orbit.

Record ID
9253429
NASA center
MSFC
Date
1967-03-01
Keywords
Saturn V, Configuration, Boeing Company
KSC-2012-2486

KSC · 2012-04-14 · KSC-2012-2486

KSC-2012-2486

CAPE CANAVERAL, Fla. -- Apollo 8 Command Module Pilot and Apollo 13 Commander Jim Lovell addresses the audience at the 40th anniversary celebration of Apollo 16's lunar landing,…

Inspect NASA record

CAPE CANAVERAL, Fla. -- Apollo 8 Command Module Pilot and Apollo 13 Commander Jim Lovell addresses the audience at the 40th anniversary celebration of Apollo 16's lunar landing, which occurred April 20, 1972. The Astronaut Scholarship Foundation hosted the soiree at the Kennedy Space Center Visitor Complex's Saturn V Center. The 11-day Apollo 16 mission featured three moonwalks, including a nearly 17-mile lunar rover road trip to collect more than 200 pounds of moon rocks to return to Earth. Photo credit: NASA/Chris Chamberland

Record ID
KSC-2012-2486
NASA center
KSC
Date
2012-04-14
Keywords
history, Apollo, astronauts, moon