Update Site (from NASA)
Explore NASA’s Image and Video Library.
Suggest one object per day for the Interstellar Minds collection. We review each suggestion before adding it.
Sign in to suggest a Marvel.
Find a NASA image ID. Open a NASA record and copy its ID from the end of the details URL.
NASA image records
JSC · 1971-01-31 · S71-16635
Apollo 14 crew arrive at White Room atop Pad A, Launch Complex 39
S71-16635 (31 Jan. 1971) --- The three Apollo 14 astronauts arrive at the White Room atop Pad A, Launch Complex 39, during the Apollo 14 prelaunch countdown. Apollo…
Inspect NASA record
S71-16635 (31 Jan. 1971) --- The three Apollo 14 astronauts arrive at the White Room atop Pad A, Launch Complex 39, during the Apollo 14 prelaunch countdown. Apollo 14, with Alan B. Shepard Jr., commander; Stuart A. Roosa, command module pilot; and Edgar D. Mitchell, lunar module pilot, aboard was launched at 4:03:02 p.m. (EST), Jan. 31, 1971, on a lunar landing mission. Note identifying bands on the sleeve and leg of Shepard. Standing in the center foreground is astronaut Thomas P. Stafford, chief of the MSC Astronaut Office.
- Record ID
- S71-16635
- NASA center
- JSC
- Date
- 1971-01-31
- Keywords
- APOLLO 14, APOLLO PROJECT, ASTRONAUTS, COUNTDOWN, FACILITIES, FLORIDA, CREW PROCEDURES (PREFLIGHT), KENNEDY SPACE CENTER, LAUNCHING PADS LAUNCHING SITES, PREFLIGHT OPERATIONS, SPACE SUITS
KSC · 2022-06-14 · KSC-20220614-PH-CSH01_0068
Artemis I SLS with Full Moon
A full Moon is in view from Launch Complex 39B at NASA’s Kennedy Space Center in Florida on June 14, 2022. The Artemis I Space Launch System (SLS)…
Inspect NASA record
A full Moon is in view from Launch Complex 39B at NASA’s Kennedy Space Center in Florida on June 14, 2022. The Artemis I Space Launch System (SLS) and Orion spacecraft, atop the mobile launcher, are being prepared for a wet dress rehearsal to practice timelines and procedures for launch. The first in an increasingly complex series of missions, Artemis I will test SLS and Orion as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will land the first woman and first person of color on the lunar surface, paving the way for a long-term lunar presence and using the Moon as a steppingstone on the way to Mars.
- Record ID
- KSC-20220614-PH-CSH01_0068
- NASA center
- KSC
- Date
- 2022-06-14
- Credit
- NASA/Cory Huston
- Keywords
- Artemis, Artemis I, EGS, LC-39B, Orion, SLS
JSC · 1969-07-19 · S69-39541
APOLLO 11 - TV TRANSMISSION
S69-39541 (19 July 1969) --- A near vertical view of Diamondback Rille is seen in this color reproduction taken from the fourth color television transmission from the Apollo…
Inspect NASA record
S69-39541 (19 July 1969) --- A near vertical view of Diamondback Rille is seen in this color reproduction taken from the fourth color television transmission from the Apollo 11 spacecraft, during its second revolution of the moon. The center of the picture is located at about 26.9 degrees east longitude and 1.2 degrees north latitude. This area is just east of the Apollo Landing Site 2. The crew of the Apollo 11 lunar landing mission is astronauts Neil A. Armstrong, commander; Michael Collins, command module pilot; and Edwin E. Aldrin Jr., lunar module pilot.
- Record ID
- S69-39541
- NASA center
- JSC
- Date
- 1969-07-19
- Credit
- 1996-98 AccuSoft Inc., All right
AFRC · 2025-04-09 · AFRC2026-0170-05
NASA’s 737 Gets Painted
A newly painted NASA 737 aircraft sits on a ramp in Oklahoma on Thursday, Aug. 13, 2026. After modifications, this aircraft will perform lunar-gravity parabolic flights to validate…
Inspect NASA record
A newly painted NASA 737 aircraft sits on a ramp in Oklahoma on Thursday, Aug. 13, 2026. After modifications, this aircraft will perform lunar-gravity parabolic flights to validate astronaut lunar suits and associated crew systems required to support Artemis mission objectives. Flight testing will happen at NASA’s Johnson Space Center in Houston for reduced-gravity operations, with oversight by NASA’s Armstrong Flight Research Center in Edwards, California. In addition, the aircraft will serve as a key asset for systems‑integration research for flight testing autonomy, sensors, and other digital systems.
- Record ID
- AFRC2026-0170-05
- NASA center
- AFRC
- Date
- 2025-04-09
- Credit
- NASA/Carla Escamilla
- Keywords
- NASA’s Armstrong Flight Research Center, AFRC, aeronautics, Artemis, 737, NASA aircraft, California, astronaut suits, lunar gravity, parabolic flights
KSC · 2022-03-17 · KSC-20220317-PH-KLS03_0119
Artemis I WDR Rollout
NASA’s Moon rocket is on the move at the agency’s Kennedy Space Center in Florida, rolling out of the Vehicle Assembly Building for a 4.2-mile journey to Launch…
Inspect NASA record
NASA’s Moon rocket is on the move at the agency’s Kennedy Space Center in Florida, rolling out of the Vehicle Assembly Building for a 4.2-mile journey to Launch Complex 39B on March 17, 2022. Carried atop the crawler-transporter 2, the Space Launch System (SLS) rocket and Orion spacecraft are venturing to the pad for a wet dress rehearsal ahead of the uncrewed Artemis I launch. The first in an increasingly complex set of missions, Artemis I will test SLS and Orion as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will land the first woman and the first person of color on the lunar surface, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
- Record ID
- KSC-20220317-PH-KLS03_0119
- NASA center
- KSC
- Date
- 2022-03-17
- Credit
- NASA/Kim Shiflett
- Keywords
- Artemis I, Kennedy Space Center, VAB, pad 39B, rollout, wet dress rehearsal
SSC · 2024-08-07 · SSC-20240807-s00811
Summer Interns Display NASA Stennis Work
NASA Stennis summer intern Lekh Patel shares about his work on lunar communications during an Aug. 7 event hosted by the Office of STEM Engagement. Patel, a student…
Inspect NASA record
NASA Stennis summer intern Lekh Patel shares about his work on lunar communications during an Aug. 7 event hosted by the Office of STEM Engagement. Patel, a student at Rutgers University in Newark, New Jersey, worked with the NASA Stennis Autonomous Systems Laboratory. The poster symposium highlighted research topics, including propulsion test operations, lunar robotics, autonomous systems, STEM education, and more. NASA’s Office of STEM Engagement paid internships allow high school and college-level students to contribute to the agency’s mission to advance science, technology, aeronautics, and space exploration.
- Record ID
- SSC-20240807-s00811
- NASA center
- SSC
- Date
- 2024-08-07
- Credit
- Danny Nowlin
HQ · 2018-11-29 · NHQ201811290012
Commercial Lunar Payload Services (CLPS)
NASA Associate Administrator for the Science Mission Directorate, Thomas Zurbuchen, answers questions during an event where nine U.S. companies where named as eligible to bid on NASA delivery…
Inspect NASA record
NASA Associate Administrator for the Science Mission Directorate, Thomas Zurbuchen, answers questions during an event where nine U.S. companies where named as eligible to bid on NASA delivery services to the lunar surface through Commercial Lunar Payload Services (CLPS) contracts, Thursday, Nov. 29, 2018 at NASA Headquarters in Washington. The companies will be able to bid on delivering science and technology payloads for NASA, including payload integration and operations, launching from Earth and landing on the surface of the Moon. NASA expects to be one of many customers that will use these commercial landing services. Photo Credit: (NASA/Bill Ingalls)
- Record ID
- NHQ201811290012
- NASA center
- HQ
- Date
- 2018-11-29
- Credit
- NASA/Bill Ingalls
- Keywords
- Commercial Lunar Payload Services (CLPS), DC, NASA Headquarters, Thomas Zurbuchen, Washington
KSC · 2022-06-14 · KSC-20220614-PH-CSH01_0071
Artemis I SLS with Full Moon
A full Moon is in view from Launch Complex 39B at NASA’s Kennedy Space Center in Florida on June 14, 2022. The Artemis I Space Launch System (SLS)…
Inspect NASA record
A full Moon is in view from Launch Complex 39B at NASA’s Kennedy Space Center in Florida on June 14, 2022. The Artemis I Space Launch System (SLS) and Orion spacecraft, atop the mobile launcher, are being prepared for a wet dress rehearsal to practice timelines and procedures for launch. The first in an increasingly complex series of missions, Artemis I will test SLS and Orion as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will land the first woman and first person of color on the lunar surface, paving the way for a long-term lunar presence and using the Moon as a steppingstone on the way to Mars.
- Record ID
- KSC-20220614-PH-CSH01_0071
- NASA center
- KSC
- Date
- 2022-06-14
- Credit
- NASA/Cory Huston
- Keywords
- Artemis, Artemis I, EGS, LC-39B, Orion, SLS
AFRC · 2025-04-09 · AFRC2026-0170-10
NASA’s 737 Gets Painted
A newly painted NASA 737 aircraft sits on a ramp in Oklahoma on Thursday, Aug. 13, 2026. After modifications, this aircraft will perform lunar-gravity parabolic flights to validate…
Inspect NASA record
A newly painted NASA 737 aircraft sits on a ramp in Oklahoma on Thursday, Aug. 13, 2026. After modifications, this aircraft will perform lunar-gravity parabolic flights to validate astronaut lunar suits and associated crew systems required to support Artemis mission objectives. Flight testing will happen at NASA’s Johnson Space Center in Houston for reduced-gravity operations, with oversight by NASA’s Armstrong Flight Research Center in Edwards, California. In addition, the aircraft will serve as a key asset for systems‑integration research for flight testing autonomy, sensors, and other digital systems.
- Record ID
- AFRC2026-0170-10
- NASA center
- AFRC
- Date
- 2025-04-09
- Credit
- NASA/Carla Escamilla
- Keywords
- NASA’s Armstrong Flight Research Center, AFRC, aeronautics, Artemis, 737, NASA aircraft, California, astronaut suits, lunar gravity, parabolic flights
JSC · 1969-05-18 · S69-35315
Prelaunch - Apollo 10
S69-35315 (18 May 1969) --- The Apollo 10 crew leaves the Kennedy Space Center's Manned Spacecraft Operations Building during the Apollo 10 prelaunch countdown. Leading is astronaut John…
Inspect NASA record
S69-35315 (18 May 1969) --- The Apollo 10 crew leaves the Kennedy Space Center's Manned Spacecraft Operations Building during the Apollo 10 prelaunch countdown. Leading is astronaut John W. Young, command module pilot, followed by astronauts Thomas P. Stafford, commander; and Eugene A. Cernan, lunar module pilot. The transfer van carried them over to Pad B, Launch Complex 39, where their spacecraft awaited them. Liftoff for the lunar orbit mission was at 12:49 p.m. (EDT), May 18, 1969.
- Record ID
- S69-35315
- NASA center
- JSC
- Date
- 1969-05-18
KSC · 2026-07-10 · KSC-20260710-PH-CSH01-0029
Artemis III Crew Visits MPPF at KSC
Artemis III crew members, NASA astronauts Randy Bresnik (center) and Andre Douglas (obscured) get a close look Orion spacecraft hardware inside the Multi-Payload Processing Facility at NASA’s Kennedy Space…
Inspect NASA record
Artemis III crew members, NASA astronauts Randy Bresnik (center) and Andre Douglas (obscured) get a close look Orion spacecraft hardware inside the Multi-Payload Processing Facility at NASA’s Kennedy Space Center in Florida on Friday, July 10, 2026. Bresnik, Douglas, NASA astronaut Frank Rubio, and ESA (European Space Agency) astronaut Luca Parmitano will launch aboard Orion on the Artemis III mission to conduct critical rendezvous and docking tests with lunar lander systems in low Earth orbit, advancing the capabilities needed before astronauts return to the lunar surface on Artemis IV.
- Record ID
- KSC-20260710-PH-CSH01-0029
- NASA center
- KSC
- Date
- 2026-07-10
- Keywords
- Artemis III, Artemis, Moon, Mars, VAB, Vehicle Assembly Building, KSC, Kennedy Space Center, EGS, MPPF
HQ · 2026-03-24 · NHQ202603240059
NASA Update on Implementation of National Space Policy
NASA Administrator Jared Isaacman speaks during a press conference following an event where NASA outlined how the agency is executing President Donald J. Trump’s National Space Policy and…
Inspect NASA record
NASA Administrator Jared Isaacman speaks during a press conference following an event where NASA outlined how the agency is executing President Donald J. Trump’s National Space Policy and accelerating preparations for America’s return to the surface of the Moon by 2028, Tuesday, March 24, 2026, at the Mary W. Jackson NASA Headquarters building in Washington. During the event NASA leadership provided updates on mission priorities, including sending the first astronauts to the lunar surface in more than 50 years, establishing the initial elements of a permanent lunar base, getting America underway in space on nuclear propulsion, and other objectives. Photo Credit: (NASA/Bill Ingalls)
- Record ID
- NHQ202603240059
- NASA center
- HQ
- Date
- 2026-03-24
- Credit
- NASA/Bill Ingalls
- Keywords
- DC, Jared Isaacman, Mary W. Jackson NASA Headquarters, NASA Administrator, Washington